First Collision of BEPCII C.H. Yu May 10, 2007. Methods of collision tuning Procedures and data analysis Luminosity and background Summary.

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

1 Initial Commissioning of BEPCII Storage Ring J.Q. Wang 10 May, Initial Commissioning of BEPCII Storage Ring J.Q. Wang 10 May, IMAC2007.
Interaction region design and construction for BEPCII C. H. Yu IHEP Feb.4, 2007.
1 Accelerator Physics Aspects LHCb Accelerator Physics Aspects LHCb CERN SL/AP n Layout n Crossing Scheme n Luminosity n Collision.
SuperKEKB Lattice and Dynamic Aperture H. Koiso Apr. 20, 2005 Super B Factory Workshop in Hawaii.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
CESR Beam-Beam Effects at CESR Mark A. Palmer Cornell University July 14, 2001.
ALPHA Storage Ring Indiana University Xiaoying Pang.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
Background Issues: Real Time Radiation Measurement S.M.Yang EPC.IHEP Mini-Workshop on BEPCII Background Study March 2008 Institute of High Energy.
Commissioning Plan of BEPCII Storage Rings J.Q. Wang April 26, 2006.
Beam Commissioning Workshop, 19th January Luminosity Optimization S. White, H. Burkhardt.
1. introduction 2. goal of luminosity monitor 3. Structure of BESII Luminosity detector 4. Calculation of the luminosity 5. MC of luminosity detector 6.
January 13, 2004D. Rubin - Cornell1 CESR-c BESIII/CLEO-c Workshop, IHEP January 13, 2004 D.Rubin for the CESR operations group.
FFS Issues in the 2011 autumn continuous operation Toshiyuki OKUGI (KEK) 1/13/2011 The 11 th ATF2 project meeting SLAC, USA.
Emittance Growth from Elliptical Beams and Offset Collision at LHC and LRBB at RHIC Ji Qiang US LARP Workshop, Berkeley, April 26-28, 2006.
6. betatron coupling sources: skew quadrupoles, solenoid fields concerns: reduction in dynamic (& effective physical) aperture; increase of intrinsic &
Xiao-Yan Zhao Beam Instrumentation Group Accelerator Center, IHEP BEPCII Background Issues: Beam Loss Measurement.
Experimental equipment interacting with beam operation D. Macina TS/LEA Many thanks to my colleagues both from the experiments and the machine for their.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
ION COMMISSIONING REVISITED 1 Thanks to: John Jowett, Walter Venturini. Matteo Solfaroli.
Simulation of direct space charge in Booster by using MAD program Y.Alexahin, A.Drozhdin, N.Kazarinov.
Beam Commissioning WG, 10 August Luminosity Scans in the LHC S. White.
Commissioning Status of Shintake Monitor (IP-BSM) T. Yamanaka, M. Oroku, Y. Yamaguchi, Y. Kamiya, S. Komamiya (Univ. of Tokyo), T. Okugi, N. Terunuma,
Intermediate  configurations at the IP for commissioning and optimization Sha BAI IHEP/LAL Philip BAMBADE LAL.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
BEPC II TIMING SYSTEM EPICS Seminar Presented by Ma zhenhan IHEP 20.August 2002.
1 Experience at CERN with luminosity monitoring and calibration, ISR, SPS proton antiproton collider, LEP, and comments for LHC… Werner Herr and Rüdiger.
IP instrumentation configuration for Autumn 2010 ATF2 runs Toshiyuki OKUGI, KEK 2010 / 7/ 1 10 th ATF2 project meeting.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
Inputs from GG6 to decisions 2,7,8,15,21,27,34 V.Telnov Aug.24, 2005, Snowmass.
Orbit related issues of the spin tune control at RHIC V.Ptitsyn, M.Bai, W.MacKay, T.Roser.
ATF2 beam operation status Toshiyuki OKUGI, KEK The 9 th TB&SGC meeting KEK, 3-gokan Seminar Hall 2009/ 12/ 16.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
Beam-Beam head-on Limit J. Barranco, X. Buffat, T. Pieloni, C. Tambasco, J. Qiang, K. Ohmi, M. Crouch for the Beam-Beam team BI BSRT Team George and Enrico.
Optimization of beam envelop at the injection point of PS Chenghui Yu Jan. 30, 2012.
IP diagnostics Toshiyuki Okugi 2008 / 6 /19 ATF2 Software mini-workshop LAL, Orsay.
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Present MEIC IR Design Status Vasiliy Morozov, Yaroslav Derbenev MEIC Detector and IR Design Mini-Workshop, October 31, 2011.
Problems of charge compensation in a ring e+e- higgs factory Valery Telnov Budker INP, Novosibirsk 5 rd TLEP3 workshop, FNAL, July 25, 2013.
Crossing Schemes Considerations and Beam-Beam Work plan T. Pieloni, J. Barranco, X. Buffat, W. Herr.
ILC BDS Commissioning Glen White, SLAC AWLC 2014, Fermilab May 14 th 2014.
Bunch by bunch feedback systems for KEKB Makoto Tobiyama KEK Accelerator Laboratory.
M.Fitterer, A.Patapenka, A.Valishev (FNAL)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Emmanuel Tsesmelis TS/LEA 26 January 2007
Wire, flat beams and beam-beam MDs in 2017
Large Booster and Collider Ring
Spectrometer Operation in IP2 & 8
Beam-based alignment measurements
Superconductivity in the BEPCII Performance
Tuesday 9th November 10:02 Fill beams dumped
Summary Thursday h21: Stable beams fill #1303.
Mini-Workshop on BEPCII Background Study
BEPCII Background Issues: Collimators and Masks
Commissioning Issues of BEPCII
Summary for LPC (March 7th, Ralph Assmann)
Proposal for a CESR Damping Ring Test Facility
Another Immortal Fill….
Fanglei Lin, Yuhong Zhang JLEIC R&D Meeting, March 10, 2016
Tuesday
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Fanglei Lin JLEIC R&D Meeting, August 4, 2016
CLIC luminosity monitoring/re-tuning using beamstrahlung ?
Presentation transcript:

First Collision of BEPCII C.H. Yu May 10, 2007

Methods of collision tuning Procedures and data analysis Luminosity and background Summary

Methods of collision tuning Designed β function and beam : β x * / β y *= 1.0m / 1.5cm  x * /  y *= 0.4mm / 5.5  m Designed backup scheme (without SCQ) β function and beam : β x * / β y *= 2.0m / 5cm  x * /  y *= 0.5mm / 12.2  m Beam size from beam-beam scan fitting :  x * /  y *= 0.5mm / 16  m 22mrad Horizontal crossing angle

Methods of collision tuning Beam-Beam kicker Bassetti-Erskine formula

Before collision commissioning Software preparation  According to the design of BEPCII IR BPM accuracy test  Select BPM for the collision tuning IP 4-bump program and strength correction  IP orbit resolution and stability  Reduce 4-Bump orbit leak less than 3% Discuss luminosity issues with detector people Methods of collision tuning

IP 4-Bump for collision tuning ( orbit leak < 3% ) Methods of collision tuning

BESIII detector is located in south of storage ring. Methods of collision tuning Collision tuning items Beam separation at NCP Longitudinal position tuning Crossing angle tuning Transverse position tuning Luminosity optimization NCP

Procedures and data analysis For the consideration of injection rate, vertical local bump was set mainly by BER. The vertical separation between e+ e- beams at NCP is about 5mm ( ~5  x )。 Vertical beam separation at North Crossing Point (NCP)

Longitudinal position tuning The distance from the IP to R4CBPM00 is m. According to the signal of the R4CBPM00, relative timing of two beams was adjusted by shifting RF phase so that two beams collide at the nominal IP. R4CBPM00 Accuracy 3mm R3CBPM00 Procedures and data analysis

Transverse position tuning Vertical crossing angle The vertical crossing angle was measured through RF phase scan. If the vertical crossing angle exists, the vertical offset of two beams will be changed in the horizontal scan. Therefore, the crossing angle can be detected by observing the vertical beam-beam deflection RF phase scan.

Procedures and data analysis Transverse position tuning Horizontal offset and vertical offset Scan: e- IP bump height Monitor: e+ IR BPM Max. H. kicker angle 0.049mrad & V. kicker angle 3mA*3mA

Procedures and data analysis Transverse position tuning Horizontal offset and vertical offset Same results if we Scan: e+ IP bump height Monitor: e- IR BPM Transverse offset and vertical crossing angle were removed by local 4-bump.

Horizontal offset scan Vertical offset scan First collision of BEPCII Mar. 25, 2007 The scan step of Horizontal IP bump and vertical IP bump are 10um and 2um respectively 。

Procedures and data analysis IP coupling tuning r1, r2, r3 and r4 at the IP can be adjusted independently. Coupling parameters tuning is a effective and important Luminosity optimization. T and M is 4  4 one-turn transfer matrix in the physical system and normal system.

Procedures and data analysis  y * waist tuning The  y * waist scan is realized by fitting the strength of a set of quadrupoles(Q2, Q3, Q4, Q5, Q6, Q7, Q8 and Q9) which are all located beside the IP.  function waist tuning is a effective and important method for Luminosity optimization.

Luminosity and background Tune shift measurement Tune shift can be observed clearly. At May 8 day shift 5mA*5mA collision horizontal tune shift is and vertical tune shift is

Luminosity and background Blowup phenomenon Normal collision case Blowup case Sometimes blowup phenomenon appeared during collision scan.

Luminosity and background Luminosity Detectors Old BaBar detector used in BEPC Zero degree photon detecor e+ e-  e+ e- 

Luminosity and background BLM data with horizontal offset scan BLM is a sensitive detector to monitor the situation of beam collision. The e+ horizontal orbit near the IP affect BLM background obviously. Usually we scan e- orbit for collision orbit optimization while keep e+ orbit unchanged.

Luminosity and background BLM data with vertical offset scan BLM works well. Both e+ and e- vertical orbit near the IP are not sensitive to the BLM background.

Luminosity and background Old BEPC BaBar luminosity detector Some device tuning works have been done. The background of the BEPC detector is very sensitive to both e+ and e- orbit in the IR. Luminosity value is still under study.

Summary Collision tuning methods have been tested successfully in BEPCII 。 Beam instrument system 、 IP bump magnets 、 power supply system 、 control system can satisfy precision collision orbit scan 。 However, there are still a long way for us to reach the designed luminosity goal.