Session 7: I-LHC Organization: Chamonix Summary Session7; 10.2.2006Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers.

Slides:



Advertisements
Similar presentations
LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the.
Advertisements

June 2-4, 2004 DOE HEP Program Review 1 M. Sullivan for the PEP-II Team DOE High Energy Physics Program Review June 2-4, 2004 PEP-II Status and Plans.
The LHC: an Accelerated Overview Jonathan Walsh May 2, 2006.
1 Chamonix 2010 Summary of Session 7: Future Upgrade Scenarios for the Injector Complex P. Collier /BE (V. Mertens /TE) Chamonix Summary, 5th Feb 2010.
1 QM2006 D.I.Lowenstein RHIC : The Path Forward Presented to Quark Matter 2006 Shanghai, PRC Derek I. Lowenstein Brookhaven National Laboratory November.
WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction WLCG Collaboration Workshop, “Gotham City”, May 2012 Introduction.
Ion Programme of LHC Hans-H. Braun Miniworkshop on Machine and Physics Aspects of CLIC based future Collider Option, Ion Programme of LHC Hans-H.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
V.Grishin, A.Koshelev, A.Larionov A.Pushkarev, V.Seleznev, M.Sleptsov A.Sytin.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
© 2001 By Default! A Free sample background from Slide 1 LEIR Application Project LEIR Applications is a separate project.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Linac2 Review  L2 operated with 99 % uptime in 2010 and 98% in the last 10 years  Systems review: all under control even for L2 till LS2 if ‘nightmare’
1 Tunnel implementations (laser straight) Central Injector complex.
IEFC WS March 2011 Middle-Long Term Needs for Ion Beams S. Maury 111 Middle-Long Term Needs for Ion Beams S.Maury Thanks to T. Bohl, C. Carli, D.
BCD Status: Strengths and Weaknesses Tor Raubenheimer.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
Debriefing of controls re-commissioning for injectors after LS1 TC 09 October 2014.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
ERHIC design status V.Ptitsyn for the eRHIC design team.
NA61 11 October 2010Light Ion for NA61/ S. Maury1 Light Ion in SPS Foreseen to have primary Ar beam physics in 2012 Nothing runs in 2012 NA61 duty cycle.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
26 Jan 06Marine Pace - AB/CO1 LEIR Controls : Gain of Experience for the Running-in of LHC Marine Pace on behalf of AB/CO and LSA.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
1 1.Summary of H- source review 2.Options for connection to the PS Booster 1.Summary of H- source review 2.Options for connection to the PS Booster.
J.M. Jowett, S. Maury, PANIC05 HI Satellite meeting, 23/11/ LHC as a Heavy-Ion Collider An update John M. Jowett, Stephan Maury I-LHC Project CERN.
PIL/LEIR Presented by M. CHANEL April 4 th PILLEIR.
( LHCMAC Chamonix Summing-upLHC MAC June 15, Third LHC Project Workshop January 2006.
1 NICA Project Report of The Group I S.L.Bogomolov, A.V.Butenko, A.V.Efremov, E.D.Donets, I.N.Meshkov, V.A.Mikhailov, A.O.Sidorin, A.V.Smirnov, Round Table.
LHC Injectors Upgrade Project 1/12/2010 R. Garoby.
ATC-ABOPC Days 2008: Session 1 Summary ATC-ABOC days Summary Session; February Session coordinated by B. Mikulec AB-OP and O. Br ü ning AB-ABP Operation.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
Final Report – Injector Re- Commissioning Working Group (IRWG) Working group to find strategy for more efficient start-up of injectors and associated facilities.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
The OP Viewpoint on the Accelerator Complex Controls Renovation R. Steerenberg on behalf of the OP group Accelerator Complex Controls Renovation Workshop.
© 2001 By Default! A Free sample background from Slide 1 Controls for LEIR AB/CO Technical Committee - 18 th March 2004.
14 th January 2004BDI daySlide 1 ELECTRON COOLING STATUS Why electron cooling? –LHC requirements, implications for LEIR, results of 1997 cooling & stacking.
LIU-Ions overall status and outlook: LEIR H. Bartosik for the LIU-IONS LEIR team* with lots of material from “Beam dynamics studies on LEIR”, H. Bartosik,
LEADE Meeting, February 6 th 2006 Highlights from the Chamonix Workshop Divonne, January 2006 D. Macina TS/LEA.
Low Energy Antiproton Facility at CERN Christian Carli on behalf of the AD and ELENA team …. with special thanks to P.Beloshitskii, T.Eriksson and S. Maury.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
29 October 2015 B. Di Girolamo. B. Di Girolamo – Collider-Experiments Day – 5 th HiLumi Annual Meeting 2 Collider-Experiments Interactions There is a.
NA61 news and plans (May 2013-October 2013) Publications:
Lead performance throughout the injector chain with focus on LEIR
LHC schedule.
Alternative/complementary Possibilities
Plans for ions in the injector complex D
Post-mortem of Experience with LEIR Controls
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Acknowledgments: LIU-PT members and deputies, H. Bartosik
How to run ions in the future?
J. Uythoven, W. Venturini Delsolaro, CERN, Geneva
Advanced Research Electron Accelerator Laboratory
Accumulation in the LEIR Ring
Generation of Higher Brightness Beams for LHC
SLHC-PP kick-off meeting, CERN 9 April 2008
Summary of Beam Cooling Parallel Session
Achieving Nominal Ion Beam PS Ion Progress
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
LS 1 start date 12th June Schedule Extension 2012 run Extension of 2012 run approved by the DG on 3rd July 2012.
Some Thoughts on the JLEIC Ion Injector
Updated MEIC Ion Beam Formation Scheme
Presentation transcript:

Session 7: I-LHC Organization: Chamonix Summary Session7; Oliver Brüning 1 -session organized in collaboration with D. Manglunki and all speakers -6 sessions with main focus on the main project milestones in 2005 and beyond, the key achievements and challenges experienced during the commissioning in 2005, the gained experience with the controls system during the 2005 operations and an outlook for what is still planned for the 2006 run -all speakers where given a list key questions to be addressed  what can be learned for the LHC commissioning?  what still needs to be done for the LHC Pb operation?  how does the injector commissionig plan affect the start-up of Pb collisions in the LHC?

1) I-LHC Project overview by Stephan Maury Oliver Brüning 2 Main Questions: -What has been done in 2005 (source, LEIR) -What has to be done in 2006 (LEIR, PS) -Expected early Pb performance for LHC running  What would be the consequences if the commissioning of the ions in the PS was NOT done in 2006? Main points from the presentation and discussions: -nominal Pb parameters are not compatible with LHC coll system -performance with early Pb beam parameters: L = cm -2 sec -1early Pb -make the absolute minimum changes wrt nominal p-p configuration -not finishing the Pb commissioning in LEIR and the PS will delay the Pb operation in the LHC until Chamonix Summary Session7;

2) Experience with the GTS-LHC Ion Source Detlef Küchler Oliver Brüning 3 Main Questions: -Performance summary from 2005 experience and future expectations -Spare parts policy  What can be done now to ensure reliable operation in the LHC? Main points from the presentation and discussions: -performance in 2005 is compatible with early Pb scheme -more studies are required in order to achieve performance required for nominal beam parameters -wish list for spare parts: oven, extraction electrodes and insulator, plasma chamber (  total investment of ca 10k€), new RF source (18GHz)  investment of ca 100k€ -test stand for future development?  not really justifiable (1 MCHF) -demands for new ion species should be given in due time Chamonix Summary Session7;

3) LEIR Commissioning Christian Carli Oliver Brüning 4 Main Questions: -Summary of the experience from the LEIR Hardware tests -Summary of the experience from the LEIR beam commissioning  What can be learned for the LHC commissioning? Main points from the presentation and discussions: Chamonix Summary Session7; commissioning was a joint effort across several groups and departments (AB-ABP, AB-CO, AB-OP, AT-VAC) -commissioning was successful but too many things were done in parallel (installation + operation with beam + control software development) -more studies are required in order to achieve nominal beam Pb parameters: (nominal cylce & ramp rate, vacuum, beam cooling)

4&5) LEIR Controls Sergio Pasinelli & Marine Gourber-Pace Oliver Brüning 5 Main Questions: -What were the main difficulties with the new control system from the OP point of view and what could be learned from the CO point of view?  What could be tested for the LHC commissioning and where do we still have unsolved issues? Main points from the presentation and discussions: Chamonix Summary Session7; change from GM to FESA, large scale deployment of LSA, OASIS,.. -previous tests in TI8 and TT40 were not enough for LEIR run -it was a challenge to deploy LHC developments this early in LEIR -LEIR is between the Linac and PS (both on the old control system) -some key application of the control system were late problems for the operation -control system worked well in the end! -extremely valuable validation, important lessons learned and decisions confirmed -SPS start with the new control system in 2006  confirmation of positive results (in the end) of LEIR and further test with LHC type proton beam

6) LEIR Electron Cooling Gerard Tranquile Oliver Brüning 6 Main Questions: -What were the main goals for the new electron cooler in LEIR?  How far away are we from the required cooling rate for the nominal LHC Pb beam and what still needs to be done in 2006? Main points from the presentation and discussions: Chamonix Summary Session7; Electron cooler construction & pre-commissioning successfully carried out by BINP -Integration into LEIR (m agnetic system readjusted after delivery at CERN, electrical and water connections, commissioning of power supplies, Faraday cage installation, interlock system, UHV preparations, vacuum bakeout) in June -Cooler commissioning started in October (s table 400 mA electron beam obtained, collection efficiency of 99.96%, static vacuum of 6x torr ) - No clear signal of beam cooling yet (for the time being) -2006: replace electron gun & clear demonstration of cooling

Summary Oliver Brüning 7 Pb physics run at end of 2008 requires Pb operation in the injectors in 2006 Chamonix Summary Session7; Pb physics run currently only possible with ‘early’ ion scheme spare part policy for Pb source identified with help of ‘05 run commissioning LEIR with new control system was painful but it provided important validation for LHC system still a lot of Pb commissioning studies planned for ‘06 run LEIR ‘06 run should be smoother  SPS start-up

Ions Schedule (options)  Back Back

Chamonix XV, Jan I-LHC Project Overview and Status Stephan Maury for I-LHC team Nominal vs Early Ion Beam in LHC ParameterUnitsNominalEarly Beam Energy per nucleonTeV/n2.76 Initial Luminosity L 0 cm -2 s # bunches/bunch harmonic592/89162/66 Bunch spacingns b*b* m0.5 (same as p)1.0 Number of Pb ions/bunch Transv. norm. rms emittancemm1.5 Longitudinal emittanceeVs/charge2.5 Luminosity half-life (1,2,3 expts.)h8,4.5,314,7.5,5.5 Why Early Beam?  much easier for injectors (Linac3, LEIR, PS), shorter LHC filling time (4’/ring)  Keep nominal bunch population ( ions/bunch) to study limitations without risks  A Luminosity of L= cm -2 s -1 (lower by a factor 20) by fewer bunches (1/10) and  * =1 m (factor 1/2) useful for physics (early results)  improved Luminosity lifetime because of larger  *  Back Back