Presentation is loading. Please wait.

Presentation is loading. Please wait.

LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the.

Similar presentations


Presentation on theme: "LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the."— Presentation transcript:

1 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the first MAC presentation (15 th December 2005) Completion of LEIR Commissioning : –January 2006 “shutdown”, –Summary, –Expected and unexpected Problems, LEIR Status Conclusions and Outlook C. Carli on behalf of the LEIR commissioning team

2 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 2/15 Many people have contributed to construct LEIR and in LEIR commissioning: I-LHC project leader(s) : S. Maury (and before K. Schindl) LEIR project leader : M. Chanel Commissioning team : P. Belochitskii, L. Bojtar, C. Carli, M. Chanel, K. Cornelis, B. Dupuy, J. Duran, T. Eriksson, S. Gilardoni, D. Manglunki, E. Matli, C. Oliveira, S. Pasinelli, J. Pasternak, F. Roncarolo, G. Tranquille Many people from several departments and many groups have constructed and installed all the equipment we use: –despite a lot of pressure mostly in time, –Impossible to compile a list of all contributors (more than 100 contributors are on the I-LHC mailing list).

3 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 3/15 Introduction Recap on LEIR Pre-LHC ion accelerator chain cannot be provided the bright LHC beams needed.  Upgrades of the ion chain: –New ion source,  Low Energy Ion Ring LEIR accumulating ions:  Elaborate multiturn injections: (70 turns > 50% efficiency),  Electron cooling (BINP): (cools within 200 to 400ms)  Transforms long (200 µs) Linac 3 pulses to short (200 ns) bright bunches. –RF gymnastics in PS ……. LEIR in autumn 2005 (few days after first circulating beam) Ejection RF Injection Electron Cooler (from BINP)

4 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 4/15 Introduction General comments Aim of LEIR Commissioning : –Provide beam needed for first LHC runs with less bunches and luminosity (less demanding for injectors and LHC) :  Shorter cycle lasting 2.4 s each one delivering one bunch with 2.25 10 8 ions,  Transverse (normalized RMS) emittances 0.7 µm,  Longitudinal emittance 0.025 eVs/u. Commissioning in Phases : –Lines in May and June 2005, –LEIR ring in autumn 2005 and beginning of 2006. First Phase of LEIR Ring Commissioning with O 4+ : –Beam rigidity very close to Pb 54+, –Longer life-time expected (is that true ?) and cooling times,  Simpler for diagnostics. Early LHC ion beam in PS and SPS in 2006 and 2007, respectively.

5 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 5/15 Introduction Situation at the time of the last MAC presentation Successful commissioning of: –Injection line, –Injection, lattice, many beam diagnostics instruments, RF …. Difficulties with first cooling and accumulation: –Short life-times, explainable by high pressure in some regions (problems with recuperated bellows (?) and an ionization profile monitor), –Barely no increase in local density. Recommendation of the MAC: –Consider O 8+ for first commissioning, –After some reflections, we decided to continue with Pb 54+  Risky, but still the possibility to switch to O 8+ in case of problems,  Only way to keep a chance to complete LEIR commissioning on time,  Faster cooling makes life-time less critical,  Turned out to be the right choice.

6 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 6/15 Completion of LEIR Commissioning January 2006 “shutdown” LEIR Commissioning on hold in January 2006 (access system …)  Opportunity to open vacuum sector 5 (known difficulties, broken ionization profile monitor): –Traces of ion impact on ionization profile monitor (-> addition of Au coated plates) Definite cure of pick-up cable problem: insulate head amplifier box from bending Everything ready to restart at mid of February Wire reducing the aperture Traces from ion impact Au coated plates Looking opposite to beam direction

7 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 7/15 Completion of LEIR Commissioning Summary Restart at middle of February 2006 –Problems (expected) again with controls (magnetic cycle):  good collaboration with controls experts. –Circulating Pb 54+ beam obtained quickly,  Improved beam life-time !! –Again serious difficulties with injection line. Electron Cooling without particular difficulties on 3 rd March 2006: –Accumulation very soon afterwards. First synchronization and ejection on 11 th April Short life-time (1s to 3s instead of up to 14s) observed on 20 th April: –No reason identified, disappeared over a ~1 week for PS interventions. Beam in front of PS injection on 24 th April 2006 Last phase (extension) perturbed by PS (and SPS) restart Commissioning completed on 12 th May 2006: –Profile monitors in ejection line available during last week only, –“Early LHC ion beam” by accumulation of two Linac 3 (low beam current traded for stability) shots.

8 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 8/15 Completion of LEIR Commissioning Expected and unexpected Problems Controls: –LEIR as testbed for LHC controls,  Difficulties –often recurrent- as expected (magnetic cyle generation …), –Good collaboration with controls experts,  Working (not yet perfect) control system,  No migration to another control system in near future. Injection line matching: –Problems with Pb 54+ similar to O 4+,  Updated optics model based on measurements. Electron cooling and accumulation: –Some worries after experience at the end of 2005,  No particular difficulty to set up cooling and accumulation in 2006.  Difficulties cured by upgrades during January shutdown ?,

9 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 9/15 Completion of LEIR Commissioning Expected and unexpected Problems Transverse beam dynamics on ramp: Reason: –C-shaped bending magnets & chamber connected to ground at several locations,  Ramp induces net Eddy current & gradient,  Optics perturbations Cure: –Compensation by adding currents to five main quad families, –One parameter (conversion of ramp to gradient) optimized,  Good acceleration efficiency. Measured Quadrupole currents along the machine cycle with compensation of gradients in bends during ramp Compensation increases current

10 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 10/15 Completion of LEIR Commissioning Expected and unexpected Problems “Dynamic vacuum” and collimation: –Vacuum degradation due to lost ions limited proof experiment in 1997,  Upgrades based on systematic measurements at Linac 3:  Au (low outgassing) coated Collimators (fixed and movable),  Additional pumping (NEGs wherever possible).  Sufficient life-time (up 14 s – interaction with rest gas and cooler) without difficulties and movable collimators in “parking position”. Short life-time (1s to 3s instead of up to 14s): –Suddenly observed on 20 th April 2006, no reason identified, –Disappeared over a ~1 week stop for PS interventions – Unfortunately not understood !!!

11 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 11/15 LEIR status Circulating beam intensity (yellow) and magnetic field (purple) vs time. “Early LHC ion beam” produced on a 2.4 s machine cycle Injection with efficiencies up to 50% (~design) (  17 μA from Linac -> two injections) Longer plateau & accumulation of two shots needed ~2.3E8 ions at ejection Acceleration within 0.8 s (instead of 1s)

12 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 12/15 LEIR status Electron cooling and accumulation Time evolution of longitudinal Schottky spectra -> time evolution of long. distribution -> observation of long. cooling and accumulation white …… zero density red …… highest densities t (s) 0.6 0.4 0.2 0 -2 0 2 ∆p/p (10 -3 ) 1 st injection 2 nd injection accumulated stack (ready for bunching) cooled stack Horizontal beam size evolution measured with an ionization profile monitor (long cycle with 400ms between injections) Injections Start acceleration Bunching

13 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 13/15 LEIR status Ejection and Transfer Last TV of the ejection line (~5m before PS injection region) SE (wires) profile monitors in the ejection line: - transverse emittances (rms normalized) : ~0.26μm - matching: (almost) no horizontal mismatch, vertical mismatch should be corrected. - Ejection kicker (green), - Sum (yellow) and difference (purple) of ring PU, - Ejection line beam curremnt transformer (blue) Ejection: Vertical mismatch (at ejection point)

14 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 14/15 LEIR status Towards the nominal LHC ion beam Towards nominal LEIR beam : No systematic investigations: –not aim of commissioning and no time available. Accumulation tests with very long plateaus (yellow trace shows intensity): –Intensities well above the nominal ones (after very long accumulation), –Dynamic beam life-time after accumulation (and losses) ~14s, –Good sign for “nominal LEIR beam”.

15 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 15/15 Summary, Conclusions and Outlook The required “early LHC ion beam” has been produced: –Two injections needed (-> acceleration in 0.8s instead of 1s), –Parameter of ejected beam well within specifications, –Successful tests of Controls developed for LHC.  LEIR construction and commissioning completed: –(almost) on time -> big success of the whole LEIR team, –LEIR can provide the “early LHC ion beam”, –Cures for all difficulties implemented. Outlook: –Still some work to make LEIR fully operational (Schottky diagnostics, final version of digital low level RF, broken ionization profile monitor, controls …), –LEIR Re-start (from the “CERN Control Centre” CCC ?) in autumn 2006, –Provide beam for “Early LHC Ion Beam” Commissioning of the PS in autumn 2006, –Provide beam for “Early LHC Ion Beam” Commissioning of the SPS in 2007 –Prepare the Nominal LHC Ion Beam in LEIR and further downstream.

16 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 16/15

17 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 17/15 Linac 3 ETL line PS ring Injection Ejection LEIR ring ITE loop ETL.MTV10 ETL.MTV40 ER.MTV12

18 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 18/15 LHC ion injector chain overview Pb 27+  Pb 54+  LEIR Repetition rate up to 5 Hz After acceleration and stripping : - 200  A Pb 54+ at 4.2 MeV/n - >120  s long pulses Energy ramping cavity  p/p ~0.4% (needed for LEIR injection) Accumulation of ~4 Linac pulses : - Multiturn injection (transverse+longit.) (70 turns with 50 % eff). - New electron cooler constructed by BINP. Bunching, acceleration and transfer to PS. Two bunches corresponding to 4 LHC bunches at 72 MeV/n every 3.6 s. -RF gymnastics to obtain 4 LHC bunches spaced by 100 ns. - 4 LHC bunches at 5.9 GeV/n every 3.6s. Al Stripper Pb 54+ to Pb 82+ : low-beta insertion - Accumulation of up to 13 LEIR/PS batches on a ~40s plateau. - “Variable (non-integer) harmonic” acceleration. - Direct space charge and IBS limit ? - Up to 52 LHC bunches per cycle at 177 GeV/n 200  A Pb 25+ at 2.5 keV/n - Each ring filled (during ~10 min): * with 12 SPS batches, * total 592 bunches per ring. -Design : * Luminosity 10 27 cm -2 s -1, * Collision energy 2.76 TeV/n. -Limited by collimation and ECPP ?

19 LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 19/15 Outlook until Completion of LEIR Commissioning Expected Problems Loss pattern of Pb 53+ ions around the LEIR ring with collimators and homogeneous gas density Intercepted by absorbers : -Reduced outgassing with Au coating, -Efficient scrubbing due to small surface Injection Cooler “Dynamic life-time” Avalanche-like pressure rise : ions lost due to rest gas electron capture (or loss) (Pb 54+ -> Pb 53+ ), every lost ion desorbs some 10 4 molecules, Observed in POP in 1997. LEIR upgrades based on measurement at Linac 3 NEG coatings in straight sections to improve vacuum there


Download ppt "LHC-MAC, 15 th June, 2006 LEIR CommissioningC. Carli 1/15 LEIR Commissioning Introduction –Recap on LEIR –General comments –Situation at the time of the."

Similar presentations


Ads by Google