DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented.

Slides:



Advertisements
Similar presentations
BRINGING MOBILITY TO CONTRA COSTA COUNTY PRESENTATION TO THE CONTRA COSTA COUNTY BOARD OF SUPERVISORS APRIL 16, 2013 Randell H. Iwasaki Executive Director.
Advertisements

Orange County Transportation Authority Measure M2 M2020 Update and Select Project Highlights Orange County Business Council Infrastructure Committee December.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
House Transportation Committee March 4, Mark Gieseke, Director MnDOT Office of Transportation System Management.
1 The Bay Area Toll Authority — Back to the Future? Steve Heminger Executive Director Steve Heminger Executive Director.
John Malbon, CEO, PAPCO & Hampton Roads Member, Virginia Commonwealth Transportation Board May 28, 2014.
March 7, 2012 North Coast Corridor Program Overview Caltrans External Advisory Liaison April 16, 2013.
TRE ANNUAL MEETING Grant Levi, NDDOT Director November 26,
Congressional District Projects New CD-2 SH 392 Interchange at I-25: — Bridge replacement and widening, will also improve on/off ramps and frontage roads.
Riverside County Transportation Commission 91 Project Update California Transportation Commission December 10, 2014.
1 GOODS MOVEMENT IN CALIFORNIA. 2 California is facing a significant transportation infrastructure shortfall. California is using innovative approaches.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
Alternative Project Delivery
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
I-880 Corridor System Management Plan ACTAC Meeting Alameda County Transportation Commission District 4 Office of System Planning Office of Traffic Operations.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
Innovative Contracting Construction Management Association of America Seminar May 17, 2013 California Department of Transportation.
Proposition 1B and the Strategic Growth Plan Randell Iwasaki California Department of Transportation.
NTTA Expansion Program ASCE January Luncheon Meeting Delivering Mobility Gerry Carrigan Assistant Executive Director of Project Delivery North Texas Tollway.
SCDOT’s Strategic Direction Janet Oakley Secretary of Transportation South Carolina Alliance to Fix Our Roads September 22, 2014 Janet Oakley Secretary.
DRAFT 2009 Long Range Transportation Plan Highway Projects August 11, 2009.
CALTRANS DISTRICT 7’S CAPITAL IMPROVEMENT PROGRAM Providing a safe, sustainable, integrated and efficient transportation system to enhance California’s.
SR520 Urban Partnership Project 2008 ITS Washington Annual Meeting November 12th, 2008 – Seattle Jennifer Charlebois, P.E. Tolling and Systems Project.
Steve Heminger Executive Director Metropolitan Transportation Commission Transportation Research Board Executive Committee June 17, 2005 TOLL: The Four.
Congressional District Projects New CD-1 Central Park Blvd/I-70 — $47.2 million project funded through the American Recovery and Reinvestment Act (ARRA).
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
CALIFORNIA HIGH-SPEED RAIL: GETTING ON TRACK Silicon Valley Leadership Group Transportation Committee January 9, 2013.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Using Value for Money Analysis to Evaluate Highway Public-Private Partnership Projects ARTBA P3 Conference Washington, DC, July 15-17, 2015 Patrick DeCorla-Souza,
Jeff Lerud, PE, CPM Senior Project Manager Nevada Department of Transportation.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
Dave Head County of Sonoma, CA Fleet Manager Doug Bond Alameda County, CA Fleet Manager How to Benefit From a Diverse Local Agency Partnership.
ACEC Joint Conference on Regional and National Economy Trends & Opportunities June 14, 2012 William C. Cuttler, P.E. Assistant District Administrator -
Division of Budgets August 22, 2012 Budget and Allocation Capacity Update Presented to the California Transportation Commission Tab 14.
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Congressional District Projects New CD-7 North I-25 Record of Decision (ROD): — Recently signed the Environmental Impact Statement (EIS), for the corridor.
Legislative Opportunities and Impediments - The Virginia Experience Virginia Public Private Partnerships ATRA TECHNIX Program Phil Bomersheim “Activist”
California’s Strategic Growth Plan Ken De Crescenzo Federal Liaison California Department of Transportation.
Orange County Business Council Infrastructure Committee March 13, 2012 Will Kempton, OCTA CEO.
North Central Texas Council of Governments Transportation Department Summary Presentation January 2004 MOBILITY 2025: THE METROPOLITAN.
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
IMN’s Fourth Annual California Municipal Finance Conference IMN’s Fourth Annual California Municipal Finance Conference April 3, 2006 Steve Heminger Executive.
1 Senate Transportation & Housing Committee December 13, 2005 Orange County Transportation Authority.
Border Trade Advisory Committee Report Cary Karnstadt, TxDOT 2012 Border to Border Transportation Conference South Padre Island, TX November 14, 2012.
Project History and Background. Senate Bill Directed UDOT to Implement Traffic Traffic Signal Coordination Systems Established a Traffic Signal.
High-Occupancy Toll (HOT) Lanes Recent Developments Planning and Operations Committee September 9, 2005.
ITS Georgia | June What is the role of ITS in the emerging public/private partnership transportation market in Georgia? ITS Georgia Monso_Julia.
0 Regional Measure 2: Capital Program Update May 12, 2010 Programming and Allocations.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
1 Regional Measure 2: Capital Program Update October 14, 2009 Programming and Allocations.
PRESENTED BY PRISCILLA MARTINEZ-VELEZ CALIFORNIA DEPARTMENT OF TRANSPORTATION DIVISION OF TRANSPORTATION PLANNING SACRAMENTO, CA (916)
91 Express Lanes Kirk Avila Treasurer/General Manager.
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
ARRA Design-Build in Minnesota Jay Hietpas - Mn/DOT.
California Transportation Commission September 19, 2007 Rocklin, CA KEEPING PLACER MOVING PCTPA, Caltrans, and CTC.
LACCD Building the Future THOMAS HALL Director Facilities Planning and Development.
Orange County Business Council Infrastructure Committee Overview of RCTC’s Major Projects December 8, 2015.
Metro Highway Program Presentation to CMAA Abdollah Ansari
Alternative Project Delivery Methods… Legislative Adjustments Shane L. Silsby, Director OC Public Works December 2, 2015.
State Route 99 Corridor Update Kome Ajise District 10 Director Caltrans.
TRANSPORTATION PROGRAMS HR 2487: Jobs for Main Street Act of 2010 MAG Regional Council January 27, 2010.
Metric to English Conversion California Bridge Construction Forum March 8, 2006 Mark Leja, Chief, Division of Design California Department of Transportation.
Calmentor August 25, 2015 Tony Boren, Executive Director Fresno Council of Governments 2035 Tulare St. #201 Fresno, CA (559) Ext
Construction Manager/General Contractor Pilot Program Construction Management Association of America February 18, 2016 California Department of Transportation.
Caltrans District 4 All information presented here is an estimate; It is preliminary and subject to change. SMALL BUSINESS OUTREACH FOR CONTRACTORS March.
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved. © 2014 HDR, all rights reserved.
SB 1 and Capital Program Update
Regional Projects Report 5-Year Integrated Plan Projects Status
STATE SUEE AND ONE WAY CORRIDORS
Presentation transcript:

DESIGN-BUILD DEMONSTRATION PROGRAM California Department of Transportation District 4 Calmentor Meeting January 27, 2011 Presented by:Joseph Dongo Presented by: Joseph Dongo (916)

2 Traditional Project Delivery  Design-Bid-Build (DBB)  Specified by Public Contract Code  Design must be complete  Awarded to the lowest responsible bidder

3 Design-Bid-Build

4 Design-Bid-Build (DBB)  Advantages – well established and widely understood  Disadvantages – perceived as slow and adversarial

5 Design-Build  A contracting method where a contract for both the design and construction of a project is awarded to a single entity.

6 Design-Build

7 Why Use Design-Build?  Faster Delivery  Cost Certainty  Constructability  Efficient Risk Allocation  Innovation

8 Sequence of Project Activities

9 Design-Build Nationwide  Originally authorized by FHWA as one of four innovative contracting practices under SEP 14  32 States have used Design-Build  Numerous Cities, Counties and Transit Agencies  Between 1990 and 2002, 300 projects were completed representing $14 billion

10 Design-Build in California Who has authority to use it?  Specified Cities and Counties  Schools (K-12, Specified Community Colleges, UC and CSU)  Transit Agencies

11 Design-Build in California Transportation Projects  Garden Grove (SR-22) HOV Lanes  Alameda Corridor  Orange County Toll Road projects (San Joaquin Hills, Foothill, Eastern, and Glenwood Pacific Interchange)  I-405 HOV project

12 Legislation – Senate Bill 4  Allows 15 design-build projects  10 Caltrans  5 Local  California Transportation Commission must authorize  Allows “Low Bid” or “Best Value” awards  Sunsets January 1, 2014

13 Project Selection  Legislation Requires:  “State highway, bridge, or tunnel projects”  Projects to vary by size, type and geographical location  “Balance” between Low Bid and Best Value

14 CTC Guidelines  Award Method  Low Bid 7 to 8 projects  Best Value 7 to 8 projects  Geographical Location  8 to 10 projects in the south  5 to7 projects in the north  Project Size  2 to 3 projects under $20 million  2 to 3 projects over $200 million

15 Authorized Projects  Mad 99 – Rehabilitate Roadway$ 37 million  SM 101 – Install ramp metering system$ 12 million  Fre 180 – Construct Braided Ramps$ 70 million  LA 10 – Construct SB 605/EB 10 Connector$ 79 million  LA 10/110 – Express Lanes$ 69 million  SBd 15/215 – Devore Interchange$290 million  LA 710 – Gerald Desmond Bridge$950 million  Riv 91 – HOV Lanes$794 million

16 Next Steps  Award authorized projects  Select Remaining Projects  Monitor and deliver authorized projects  

17 Questions?