Aerospace Vehicle Systems Institute 1 Defense Standardization Program Conference Lansdowne, VA March 16-18, 2004 Lloyd Condra, Boeing 206-655-8240

Slides:



Advertisements
Similar presentations
Update on Wireless Avionics Intra-Communications (WAIC) ICAO, ACP-WG-W, Montreal Marcella Ost January 22, 2010 ACP WG-W/3 IP-3.
Advertisements

CRI- Common Review Initiative Reducing Lender Review Redundancy.
IBM Corporate Environmental Affairs and Product Safety
©2006 The Aerospace Corporation Activities Associated With Working With Xilinx to Develop A Space Flow for Virtex Family of FPGA’s Larry Harzstark The.
Aviation Safety ProgramSingle Aircraft Accident Prevention April NCC-1-377, Honeywell Tucson Design, Implementation, and Verification of Fault-Tolerant.
DoD Standardization Conference Lansdowne, Virginia “Aerospace Qualified Electronic Components” Joe Chapman Defense Standardization Program
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
2  A nonprofit, nonpartisan association  Represents highway and transportation departments in the 50 states, the District of Columbia, and Puerto Rico.
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
Office of the Secretary of Defense Defense Microelectronics Activity (DMEA) Defense Microelectronics Activity (DMEA) Doug Casanova Defense Microelectronics.
Project Cost Management Estimation Budget Cost Control
Sami Aly Issues in Telecommunications3 February 2002 Development Plan 1.Product & Releases, evolution (Time line) 2.Features roll out 3.System.
CEEAM Components for Energy Efficiency in Transport by Additive Manufacturing Piyal Samara-Ratna Mechanical Engineer & Project Lead Space Research Centre.
1 Software and Digital Systems Safety (SDSS) Research Program Barbara Lingberg FAA/AIR-120 SDSS Program Sponsor May 6, 2003.
ARIES Project Meeting, L. M. Waganer, Jan 2009 Page 1 Debrief of Dr. Whelan’s TRL and Aerospace & R&D Risk Management Debrief of Dr. Whelan’s TRL.
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
Systems Engineering Management
Handouts Software Testing and Quality Assurance Theory and Practice Chapter 11 System Test Design
A Commercial Airplane Manufacturers View
GLOBAL REGULATORY STRATEGY CONSIDERATIONS SCIENTIFIC SARAH POWELL EXECUTIVE DIRECTOR, REGULATORY STRATEGIES SEPTEMBER 14-17, 2008 BOSTON, MA.
PMSS Final SOW May 22 nd, Statement of Work 2 GLENN RESEARCH CENTER PROJECT MANAGEMENT SUPPORT SERVICES (PMSS) The Contractor shall provide expert.
Avionics Qualified Electronic Component. AQEC – WHAT IS IT ? A cooperative approach to working with the integrated circuit manufacturers to use their.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
1 Overview Charlie Williams – Shell API Summer Standardization Conference 28 June
1 Board Meeting September 29, 2014 Public-Private Transportation Partnership Board.
© 2003 IBM Corporation July 2004 Technology planning for not-for-profit organizations IBM volunteer name Title, organization.
MGS Testing A High Level Overview of Testing in Microsoft Games Studio Joe Djorgee – Test Lead.
FY2010 PEMP Notable Outcomes October 15, FRA, LLC Board of Directors 10/15-16/2009 Office of Quality and Best Practices Performance Evaluation Management.
Nurjana Technologies Company Presentation. Nurjana Technologies (NT) is a small business enterprise founded in 2012 and operating in Aerospace and Defence.
Research Sponsored By the Product Development Focus Team February 12, 2001 Technology Roadmap Development Presented By: Angie Kelic.
© 2010 Chevron A Day in the Life of a Project Manager Presented by Nancy Grossman, Project Manager Presented to Chabot College Engineering Class September.
1 The Lockheed Martin India Innovation Growth Program
EENG 1920 Chapter 1 The Engineering Design Process 1.
©2002 Galorath Incorporated 1 A Vehicle for Collaboration The CAI Program Accomplishments: Established an Industry / Government Team (U.S. Air Force, U.S.
System Development Process Prof. Sujata Rao. 2Overview Systems development life cycle (SDLC) – Provides overall framework for managing system development.
Future Airborne Capability Environment (FACE)
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
AIS Development Strategies. Lecture 4-2 ©2003 Prentice Hall Business Publishing, Accounting Information Systems, 9/e, Romney/Steinbart Introduction This.
THECB 8/03 Leveraging Research Dollars Deborah L. Greene, PhD Assistant Commissioner for Finance, Research, and Campus Planning Texas Higher Education.
16 1 Installation  After development and testing, system must be put into operation  Important planning considerations Costs of operating both systems.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
2 nd Annual Babcock/Eno River Capital Elevator Competition March 31, 2001 Michael McCorquodale, Chief Executive Officer Mobius Integrated Systems Corporation.
Status Report for Critical Infrastructure Protection Advisory Group
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
Identification of national S&T priority areas with respect to the promotion of innovation and economic growth: the case of Russia Alexander Sokolov State.
ISA Setting the Standard for Automation ™ Automation Standards Compliance Institute ISA Security Compliance Institute (ISCI) Prepared by: Andre Ristaino,
The Multilateral Fund and its Management Structure UNFCCC Workshop on the Adaptation Fund 3-5 May 2006 Alberta, Canada Maria Nolan Chief Officer - Multilateral.
Ali Pabrai, CISSP, CSCS ecfirst, chairman & ceo Preparing for a HIPAA Security Audit.
J1879 Robustness Validation Hand Book A Joint SAE, ZVEI, JSAE, AEC Automotive Electronics Robustness Validation Plan The current qualification and verification.
HTSC High Tech Shopping Cart Project Vincent Declercq GSBA 573 Fall 2006 USD.
WP1: IP charter Geneva – 23rd June 2009 Contribution from CERN.
International Harmonization of Cooperative Systems Standards and the IntelliDrive SM Program ITS-JPO Standards Program Update Brian Cronin Team Leader,
Federal Acquisition Service U.S. General Services Administration GSA Assisted Acquisition Services Peter Han General Services Administration March 16,
© Ceres Power Limited 2003 Building a Valuable FC Company … Some Lessons Learned 26 Feb 2004.
Innovation Software Corporation's Cultural Awareness Training Program Presentation by:
The NEKIA Business Development Initiative Overview Annual Retreat Scottsdale, Arizona November 19-21, 2003.
State of Georgia Release Management Training
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Industry Day DoD Parts Management Reengineering LMI McLean, VA May 8, 2007 Parts Standardization and Management Committee (PSMC )
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Driver License Data Verification (DLDV) Pilot Program Update AAMVA Workshop and Law Institute March 2013.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Aerospace Vehicle Systems Institute On-Aircraft Wireless Communications Research at AVSI Dr. Fred Fisher Asst. Director, AVSI July, 2011.
Update on WAIC Issues ITU-R Working Party 5B and Future Regulatory Considerations Joe Cramer December 16, 2009.
Multi-state Corridor Pooled Fund Program
Enterprise Content Management Owners Representative Contract Approval
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
Understanding the AMI Deployment/ Upgrade Process and Ensuring Quality Relationships with Your AMI Vendor July 2018.
Presentation transcript:

Aerospace Vehicle Systems Institute 1 Defense Standardization Program Conference Lansdowne, VA March 16-18, 2004 Lloyd Condra, Boeing

Aerospace Vehicle Systems Institute 2 Aerospace Vehicle Systems Institute - AVSI Cooperative Overview Texas Engineering Experiment Station Texas A&M University

Aerospace Vehicle Systems Institute 3 5/7/033 Presentation Outline AVSI overview & background AVSI Process for Research projects AVSI Projects

Aerospace Vehicle Systems Institute 4 5/7/034 Dramatically reduce aerospace vehicle systems life- cycle cost and accelerate development of systems, architectures, tools, and processes through cooperation between industry, government and academia. AVSI Mission

Aerospace Vehicle Systems Institute 5 5/7/035 AVSI Cooperative Agreement AVSI governed by over-arching Cooperative Agreement  Signed by the original AVSI members on August 19, 1998  Counter agreement signed by new members when they join The Cooperative Agreement defines how things are handled  External communications and publications  Ownership and protection of Intellectual property  Accounting procedures  Project AFE and Annual Research Plan  Etc. Modifications to the Cooperative Agreement  Approved by the Executive Board on May 22, 2002  New Membership structure: Full, Associate, Liaison Members

Aerospace Vehicle Systems Institute 6 5/7/036 Objectives of AVSI Create a financial and technical “critical mass” of industry members Create a financial and technical “critical mass” of industry members  Pool/leverage resources  Efficiently engage experts from industry & academia Foster creation of standard systems, architectures, tools, and processes for aerospace industry Foster creation of standard systems, architectures, tools, and processes for aerospace industry Synergistic and industry-centered solutions Synergistic and industry-centered solutions

Aerospace Vehicle Systems Institute 7 5/7/037 Responsibilities Project Management Committees (PMC)  Identify the PMC Chairman  Responsible for developing and monitoring the progress of their work-statement, deliverables, schedules, contractor, etc.  Responsible for generating a project “Commercialization Plan”  Release of project results  Approval of new members joining the project after deadline  PMC Chairman - Provide Monthly and Quarterly status report  Conduct regular meetings and telecons as necessary  Disseminate information within their respective company

Aerospace Vehicle Systems Institute 8 5/7/038 Funding Members pay an annual subscription fee to cover AVSI staffing/overhead (~ $15,000/yr) Project costs are split equally by only those members who decide to participate  5% fee assessed on projects for AVSI Overhead (managed by the AVSI Executive Board)  Each project contract is assessed a one time fee (~$11.375K) for Texas A&M support; contracts organization, business management, technology & licensing & communications division Project Technology can be licensed and any revenues will be split between Participants and AVSI

Aerospace Vehicle Systems Institute 9 5/7/039 Guidelines for appropriate AVSI projects Develop new / improved aerospace systems, tools & processes with large benefits for those involved  improved cycle-time  better quality  lower costs  higher reliability Foster creation of standard / open systems architectures Make a high level difference without impacting each members’ differentiating competitive advantage – stay away from “competition sensitive”studies Have a commitment by the end-user in their respective company Have a strong “sponsor” & “champion” in their respective company

Aerospace Vehicle Systems Institute 10 5/7/0310 Guidelines for appropriate AVSI projects Appropriate for AVSI (Avoid duplication of effort by other entities doing the same thing) Leverage resources with a strong business case Proposals are welcomed from all members Consensus is desirable - but not essential Consider;  Not all companies will want to participate in all projects  Any combination of OEMs, Suppliers, and Government Agencies teaming is okay  Utilize universities resources or other research institutes - where appropriate  Smaller and technically “risky” projects are okay  It is Ok to have a multiple phase (multi-year) or gated project

Aerospace Vehicle Systems Institute 11 5/7/0311 Tools & Processes Dev. Panel - Launched Projects EAFE #1 Develop the “How to” of a Qualification Compiler & Linker AFE #1, 1S1 Systems Engineering & Information Management AFE #4 Rapid Prototyping Tools for Flight Deck Display Systems AFE #7, 7S1 Cert Issues for Embedded Object Oriented S/W AFE #10 Tools and Best Practices for Implementing RTCA Do254 AFE #23 Cert Guidelines for the Integration of Wireless Communications for Aircraft AFE #31 Redesign Existing Hardware Due to Obsolete Parts AFE #32 Improved Software Verification Methods and Support Tools

Aerospace Vehicle Systems Institute 12 5/7/0312 System Development Panel - Launched Projects AFE #3, 3S1, 3S2 Defining Real Operating Environments; Temps & Power Quality AFE #6 Systems Bus Study AFE #14 Wireless Com. for Aircraft Systems AFE #16, 16S1 Mitigating Radiation Effects on Current & Future Avionics Systems AFE #17, 17S1 Methods to Account for Accelerated Semiconductor Device Wear out AFE #18, 18S1 Thermal Mgmt of COTS based Avionics AFE #21, 21S1 Fuel Cell Auxiliary Power Unit for Transport Aircraft AFE #24, Micro Electro-Optical Sensors for Commercial & Military Aircraft Applications AFE #27 Structural Load & Environmental Monitoring AFE #28 Modular Open Systems Approach Interoperability

Aerospace Vehicle Systems Institute 13 5/7/0313 AFE #16 Mitigating Radiation Effects on Current & Future Avionics Systems Project description; To develop a set of guidelines to mitigate atmospheric radiation effects on current and future aircraft avionics systems and electronics devices. Period of Performance; 1/7/02 to 12/20/02 Participants; Boeing, Honeywell, Smiths Aerospace & TRW Project cost; $156, Status; Endorsed on 8/8/01. Project launched 1/7/02. Initial phase of the project is complete. AFE #16S1 Mitigating Radiation Effects on Current & Future Avionics Systems Project description; To develop a set of guidelines to mitigate atmospheric radiation effects on current and future aircraft avionics systems and electronics devices. Period of Performance; 3/17/03 to 3/12/04 Participants; Boeing, DoD, FAA, Honeywell, Smiths Aerospace & Goodrich Aerospace Project cost; $138, $173, Status; PMC approved supplement on 3/21/03. Project is ongoing. AVSI Project status

Aerospace Vehicle Systems Institute 14 5/7/0314 Project 16: Radiation Effects Current estimates for SEU rates are based on “old” technology Critical Charge (Si), fC Sensitive Depth (SOI),  Sensitive Volume (Si),  3 Technology Node, nm P. Roche, G. Gasiot, K. Forbes, V. O’Sullivan, V. Ferlet, “Comparisons of Soft Error Rate for SRAMs in Commercial SOI and Bulk Below the 130 nm Technology Node,” 2003 IEEE Nuclear and Space Radiation Effects Conference Altitude, Thousands of Feet 1-10 MeV Neutron Flux, n/cm²sec

Aerospace Vehicle Systems Institute 15 5/7/0315 Project 16: Radiation Effects Almost all testing is done on memories, and the processes for testing logic devices are not well-defined Effects of thermal neutrons are unknown Test results are not “portable” from one manufacturer to another, or even from lot to lot Most atmospheric radiation tests are conducted for sea- level applications

Aerospace Vehicle Systems Institute 16 5/7/0316 AFE #17 Methods to Account for Accelerated Semiconductor Device Wear out Project description; To develop methods to evaluate mechanisms and accommodate the effects of accelerated semiconductor device wear out on avionics system design, production and support.. Period of Performance; 1/7/02 to 12/20/02 Participants; Boeing, Goodrich Aerospace, Honeywell, Smiths Aerospace and TRW Project cost; $207, Status; Endorsed on 8/8/01. Initial phase of the project is complete. AFE #17S1 Methods to Account for Accelerated Semiconductor Device Wear out Project description; Continue to develop methods to evaluate mechanisms and accommodate the effects of accelerated semiconductor device wear out on avionics system design, production and support. Period of Performance; 1/1/03 to 12/31/03 Participants; Boeing, DoD, FAA, Goodrich Aerospace, Honeywell and Smiths Aerospace Project cost; $168, $202, Status; PMC approved supplement on 12/17/02. Project is launched. AVSI Project status

Aerospace Vehicle Systems Institute 17 5/7/0317 Project 17: Methods to Account for Accelerated Semiconductor Device Wearout Description: Determine effects of current and future device technology on service lifetime, and their impact on avionics systems. Develop methods to respond to negative impacts. Deliverables: Mathematical models of the major wearout mechanisms Methods to make tradeoffs among service life, temperature, frequency, voltage, etc. System design guidelines for using future semiconductor devices

Aerospace Vehicle Systems Institute 18 5/7/0318 Project Year produced Known trends for TDDB, EM and HCI degradation (ref: extrapolated from ITRS roadmap) Mean Service life, yrs. Computers laptop/palm cell phones Airplanes 0.5 mm 0.25 mm130 nm 65 nm35 nm Technology For “target markets,” performance is traded against reliability (often defined as lifetime) Reliability Gap

Aerospace Vehicle Systems Institute 19 5/7/0319 Project 17: Device Reliability Trends As technology progresses, Weibull slopes approach 1 and wearout failures become statistically indistinguishable from infant mortality failures with the SAME wearout drivers ,  < ,  ~ ,  ~ Log time (years in service) Infant mortality (random, extrinsic) Failure Rate Wearout (intrinsic)

Aerospace Vehicle Systems Institute 20 5/7/0320 Project 17: Possible Solutions 1. If you CAN NOT change the specs: Calculate a more accurate FIT rate so you can design for maintenance, replacements and upgrades accordingly. 2.If you CAN change the specs: DERATE the parts to extend the lifetime and reduce maintenance cost. Design new systems according to accurate failure/replacement rate.

Aerospace Vehicle Systems Institute 21 5/7/0321 “Working Together” For more information contact: David W. Lund, Director Aerospace Vehicle Systems Institute TAMU 3141 College Station, TX (979) w Lloyd Condra Boeing Phantom Works Seattle, WA