Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.

Slides:



Advertisements
Similar presentations
M2FS SAC UpdateMarch 18, 2012 System Overview: M2FS Spectrograph Two independent, identical channels Each fed by 128 fibers Each with LoRes and HiRes modes.
Advertisements

LBT Q Eng/SW Review SFWG – Software Group General Norm Cushing.
MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
Progress report to SAC for the GISMO -- Gladders Image-Slicing Mutlislit Option for IMACS -- A. Dressler Basic mechanical/optical assembly -- Feb ‘07 1.
Extracting a SN spectrum from EMMI Thank you Sandro (and Hans, Jean-Louis, Gianni and the EMMI team)
IMACS Commissioning Report to the Magellan SAC Performance and Operation 2+ years after installation Alan Dressler and Tyson Hare, April 8, Capabilities.
Return to Hubble: Servicing Mission 4 Dr. Frank Summers Space Telescope Science Institute April 2, 2009.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments.
Magellan Associate Director Report Personnel Observing Statistics Telescope Operations.
PALM-3000 Instrument commissioning schedule Antonin Bouchez Team Meeting #7 27 February, 2008.
Galaxies Sylvain Veilleux  My Interests: Galaxy and black hole formation and evolution  Origin of starburst and AGN activity  Role of galaxy mergers.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
The KPNO 4m “Mayall” Telescope Arjun Dey (NOAO). National Optical Astronomy Observatory Mission: provide the best ground-based astronomical capabilities.
Wide-Field Science Capabilities at the AAO Stuart Ryder Australian Gemini Office Australian Astronomical Observatory.
Astronomical Instrumentation Often, astronomers use additional optics between the telescope optics and their detectors. This is called the instrumentation.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Facility instruments User (P.I.) Instruments Clean Room.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
The Michigan/Magellan Fiber System (M2FS): An MRI Instrument Development Proposal to NSF.
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Committees.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Magellan Director Report Personnel Observing Statistics Instrument Commissioning Instrument Development Fast Internet Connection Publications (A. Uomoto)
17/18 May 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 17/18 May 2003 Univ. of Michigan,
TSIP (Telescope System Instrumentation Program) proposal February, 2005 Carnegie submission, on behalf of Magellan Consortium: “A Second, More Sensitive.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
IMACS/LDSS-3 Slit Masks Status of Mask File Submission Software Late Submissions: a Chronic Problem New Policy.
Telescope Integration and Tests Tuesday Afternoon.
Report from Subaru Advisory Committee The main issues of the current SAC: ・ Extensive (strategic) program of Subaru telescope ・ International collaborations.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
AST Supported Programs for Astronomical Instrumentation Division of Astronomical Sciences Program Officers: Andrew Clegg, Jeff Pier, Gary Schmidt.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
Magellan technical updates, Pasadena April 2006 – September 2006.
NEXT GENERATION OPTICAL SPECTROGRAPH FOR NOAO Samuel Barden, Charles Harmer, Taft Armandroff, Arjun Dey, and Buell Jannuzi (National Optical Astronomy.
The FMOS Facility for the SUBARU telescope Gavin Dalton Oxford/RAL.
Opto-Mechanics for SNAP at UM
Magellan Associate Director Report Personnel Observing Statistics Commissioning of Instruments Existing instruments Future Instruments.
13-14 April 2002Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report April.
Preparing the telescope and CCD-camera for observations Andrych K, Tvardovskyi D.
Magellan Telescopes Instrumentation: A Critical Assessment of Current Status.
Magellan F/5 Status Eavesdropping PISCO Andrew Szentgyorgyi 25 Apr 2011/Pasadena 4/25/111Magellan SAC/Pasadena.
FourStar Status Eric Persson (OCIW) Presented By.
9/24/05MagE Update SAC meeting Developments with MagE Complete layout of Spectrograph structure and camera by B. Bigelow –Structure will be all anodized.
Magellan Telescopes Observatory Report Personnel Network/Systems Administration Observing Statistics.
Pasadena Updates March February 2009 PFSMegacam MMIRS FourStar Some of the instruments arriving at Magellan in the next year.
Magellan Telescopes Observatory Report Personnel Accomplishments Observing Statistics Common Problems Work in Progress.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
Incoming instruments. New instruments IMACS MOEMultiobject echellette LDSS upgradeMultiobject optical spectroscopy CorMASSLow-res visiting NIR spectrograph.
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
Brenna Flaugher, PMG, April 6, 2007 DECam Funding Need Profile (Dec 06) (then yr $, Overhead included) This gave a technically driven schedule resulting.
MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.
Operations Good –Telescope downtime is low –Important repairs accomplished –Observer satisfaction is high Bad –Maintenance is deferred –Unfinished work.
F/5 telescope work Secondary mirror polishing (SOML) Secondary mount support controls Active optics controls Flat field screen & lamps Telescope baffles.
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
Cosmic Program and Users in the Fermilab Dark Energy program Brenna Flaugher Fermilab Institutional Review Feb
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Astronomy 1020 Stellar Astronomy Spring_2016 Day-19.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
The GMT Project The Giant Magellan Telescope (GMT)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
Wide-Field Science Capabilities at the AAO
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Magellan Status Report March 19, 2016 Carnegie Observatories
Magellan Telescopes Observatory Report
An IFU slicer spectrometer for SNAP
User instrument policy
The first shipment of SPEAR3 magnets (9 dipoles and 12 quadrupoles) arrived April 3. The second shipment (3 dipoles, 7 quadrupoles, and 6 sextupoles)
FourStar 4K x 4K JHK imager
Presentation transcript:

Magellan SAC April 7-8, 2006 Pasadena, CA

Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE to part-time

Staffing Telescope technical support –Sufficient staffing –Improved progress on long-term projects Observer support –Insufficient, even for experienced observers –Some observations lost due to slow communications Instrumentation support –Sufficient for routine work –Insufficient for new instrument commissioning

Australia Sale of 30 nights over two years at $46K/night Cash ($690K) & personnel (two scientists) Personnel contribution: –Two AAO scientists (new hires) –Two years at LCO (Magellan support & research) –Third year in Australia (research) Hiring selection is AAO/Magellan collaboration Starts in 2007A

TSIP proposals (selections ~May) MMT and Magellan Infrared Spectrograph (MMIRS) Brian McLeod & collaborators, SAO. $917K, 9 Magellan nights in 1 year (and 9 at MMT). A Second, Higher-red-sensitivity Mosaic CCD Camera for IMACS (Mosaic2) Alan Dressler & collaborators, Carnegie Observatories. $648K, 15 Magellan nights in one year (community-wide). Development of a Magellan Adaptive Secondary Laird Close & collaborators, University of Arizona. $1,356K, 31 Magellan nights over three years

F/5 secondary news LBT secondary problems will delay Magellan F/5 Magellan secondary now expected early 2007 About 1 year to commission F/5 focal plane Ready in time for MMIRS arrival

WFC fit-test SAO team fit-checked F/5 Wide Field Corrector First test of instrument lift and WFC carts Minor modifications being applied WFC cells now being fitted with lenses

F/5 WFC fit-check

F/5 secondary cell Most parts are machined (cell body, supports) See it in the OCIW assembly area

Instrument News IMACS dispersers tested –150 l/mm grism (McCarthy, Dressler) –LDP “Low Dispersion Prism” (Burles) MMTF Maryland-Magellan Tunable Filter –Passed Director’s pre-ship review –Installation starts in a few months LDSS –New shutter controller installed –VPH-ALL grism fabricated

Computing and networking CTIO CISS now provides systems administration Major network upgrade –Firewall to the world –Managed routers added –New mail server to be installed CTIO network connection –45 Mbit/sec to Internet2 from El Pino –4 Mbit/sec to El Pino from LCO

Cleanroom MMIRS and FourStar are large vacuum systems Both have expensive detectors Large clean work area needed for: –Particle and volatile contaminant control –ESD control Alternatives: –Ship back to US (risky and lengthy) –Work in dirty environments (risky, difficult)

Cleanroom concept

Cleanroom location

Cleanroom view

Cleanroom Approximate cost: –$200K for building –$50K for cleanroom equipment Resolution from SAC requested