Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final.

Slides:



Advertisements
Similar presentations
Chapter 3. HVAC Delivery Systems
Advertisements

Objectives Control Terminology Types of controllers –Differences Controls in the real world –Problems –Response time vs. stability.
HVAC 101 The Basics of Heating, Ventilation and Air Conditioning
Objectives Finish with ducts and fans Define project topics.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
Announcement Course Exam October 6 th (Thursday) In class: 90 minutes long Examples are posted on the course website.
Active beams versus VAV with Reheat Analysis of May 2013 ASHRAE Journal article Ken Loudermilk Vice President, Technology & Developement.
Objectives Finish with Multizone Systems
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
Objectives Review/Learn about HVAC Configurations Describing systems and processes in the psychrometric chart Analyze processes in AHU and buildings –Finish.
PSU Building Thermal and Mechanical Systems Laboratory Environment A/E Kurt M. Shank, M.S. & Stanley A. Mumma, Ph.D., P.E. College of Engineering Department.
Lecture Objectives: Model HVAC Systems –HW3 Asignemnet Learn about eQUEST software –How to conduct parametric analysis of building envelope.
Objectives Discuss Project Topics Learn to design VAV and DOAS System.
Lecture Objectives: Learn about automatic control Use life-cycle cost analysis integrated in eQUEST.
Lecture Objectives: Model processes in AHU –Use eQUEST predefined models –Use detail modeling Define your topics for your final project.
1 Stanley A. Mumma, Ph.D., P.E. Professor Emeritus Penn State Univ. Park, PA Web: Active and Passive.
Equation solvers Matlab Free versions / open source codes: –Scilab MathCad: Mathematica:
Conditioning of Moist Air
Objectives Select project topics Review for exam Learn about DOAS systems.
Important variables Water: Air: Conversion:
Announcements Midterm Project Prepare groups of 3 to 4 students You can submit the list at the end of next class Midterm Exam 03/09/10 - In class Exam:
Lecture Objectives: Finish with HVAC Systems Discuss Final Project.
Lecture Objectives: Specify Exam Time Finish with HVAC systems –HW3 Introduce Projects 1 & 2 –eQUEST –other options.
Course project presentation Thursday in class Timing: 4 minutes (strictly controlled) Approximately 1 PowerPoint Slides per minute Content Problem Introduction.
Objectives Analyze processes in AHU and buildings.
Objectives Discus final project Load calculation.
Lecture Objectives: Clarify issues related to eQUEST –for midterm project Learn more about various HVAC - economizer - heat recovery Discuss about the.
Objectives More HVAC systems - Sorption (absorption) chillers
Objectives Discuss final project deliverables Control Terminology
Announcements 1) Thursday 02/09 In class Midterm Exam - I will be in the classroom at 9:20 AM - Example and solution are posted on the course website 2)
Lecture Objectives: -Discus Final Project -Learn about Solar Systems -HW3 (final HW assignment) -HVAC system.
Final Project Presentation On Monday, same classroom at noon PowerPoint (5 minutes presentation) Upload the file before the class Approximately 6-7 slides.
Energy Plus & Open Studio Class
Objectives Finish DOAS Control Terminology Types of controllers
Announcement Course Exam November 3rd In class: 90 minutes long Examples will be posted on the course website.
Introduction to Energy Management. Week/Lesson 13 Control Strategies for Occupant Comfort.
Objectives Discuss Project Topics Learn to design VAV and DOAS System.
Lecture Objectives: Discuss the exam problems Answer question about HW 3 and Final Project Assignments Building-System-Plant connection –HVAC Systems.
Lecture Objectives: Introduce HW3 Learn about sorption chillers.
Lecture Objectives: Define the final project Deliverables and Grading policy Analyze factors that influence accuracy of our modeling study Learn about.
Lecture Objectives: Analyze several modeling problems –Examples from the final project list Economizer Solar collectors Phase change thermal storage materials.
Reminder about the Filed Trip Tomorrow 8 am St. Edward's University We will meet at 8:00 am at the south entrance of the new Science building (visitor.
Objectives Propose residential system related final project –Compare VAV systems with DOAS systems.
Field Trip Time: Tomorrow (Tuesday) 8 am Duration 1 hour (you will be back latest at 10 am) Location Texas State University: Round Rock
Announcements Next class is the course evaluation
Lecture Objectives: Discuss HW4 Continue with advance air systems
Announcements End of the class – course evaluation
HVAC Basics Arkan Arzesh HVAC – Heating, Ventilation, Air-conditioning.
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Answer questions related to HW 4
Announcement No project presentations !
Lecture Objectives: Answer questions related to HW 4
Chilled Beam Performance:
Announcement Field trips: Thursday 8 am on UT Campus (NMS building)
Project.
Lecture Objectives: Discuss HW2
Objectives Further discuss the Exam problems
Objectives Finish duct systems Learn about plumbing systems
Objectives Finish with fans Learn about DOAS and VAV
Objectives Learn about 1) Control for HVAC systems
Lecture Objectives: Discus Final Project Learn about Solar Systems
Lecture Objectives: Discuss HW4 parts
Lecture Objectives: Discuss Projects 1 and 2
Announcement No project presentations !
Objectives Finish with Heat exchangers
Announcements Exam 1 Next Class (Thursday, March 14th):
Objectives Review exam problems Further discuss final projects
Objective Revie the Cooling Cycle Learn about air distribution systems
Objectives Discuss Rotary Heat Exchangers
Presentation transcript:

Final Projects Grading criteria is posted on the course website Preliminary results are due Next Tuesday Final Project delivery on Monday Dec. 7 th –Final Project presentation at noon

Field Trip to the central cooling and power plants Monday, November 30: anytime in the afternoon Thursday, December 3: 8-9:30 a.m. or 1- 2:30 p.m. or 1:30-3 p.m. Friday, December 4: p.m.

Objectives Finish with design of VAV and DOAS System Control

Other building load calculation tools

Cooling and Heating Loads from eQUEST Zone orientation Base size is ft x ft with perimeter zone depth of ft. Floor to floor is 12 ft and floor to suspended ceiling is 9 ft.

Example of Cooling and Heating Loads Cooling and heating load for each zone and whole building: Fresh air requirement based on number of occupants:

Ventilation Loads asses/ARE389H/Handouts/Std pdf

VAV System

VAV Example -One system -Multiple Spaces/Zones - VAV box for each space/zone

VAV System Terms & Equations (you can find them in ASHRAE Standard 62) Fraction of minimum outdoor air in space/zone supply air X i = V OAi / V SAi Critical space Space with maximum X i, Z=max ( X i ) Fraction of outdoor air in system supply air X = sum(V OA ) / sum(V SA ) Required Fraction of outdoor air: Y=X/(1+X-Z)

Example Solution Space1Space 2Space 3Space 4 V SA V OA Xi X Z Y

Other Issues Related to VAV Fan control Minimum supply air Occupancy sensors

VAV with fan terminal units

DOAS System

DOAS with multi-split systems Fresh air?

DOAS fresh air configurations

Issues Related to DOAS Split of sensible and latent load Selection of hydronic system Winter vs. summer operation –Winter operation with DX systems (heat pump)

Economizer Fresh air volume flow rate control mixing damper Fresh (outdoor) air T & RH sensors Recirc. air % fresh air Minimum for ventilation 100% T OA (h OA ) enthalpy

Economizer – cooling regime How to control the fresh air volume flow rate? % fresh air Minimum for ventilation 100% If T OA < T set-point → Supply more fresh air than the minimum required The question is how much? Open the damper for the fresh air and compare the T room with the T set-point. Open till you get the T room = T set-point If you have 100% fresh air and your still need cooling use cooling coil. What are the priorities: - Control the dampers and then the cooling coils or - Control the valves of cooling coil and then the dampers ? Defend by SEQUENCE OF OERATION the set of operation which HVAC designer provides to the automatic control engineer

Economizer – cooling regime Example of SEQUENCE OF OERATIONS: If T OA < T set-point open the fresh air damper the maximum position Then, if T indoor air < T set-point start closing the cooling coil valve If cooling coil valve is closed and T indoor air < T set-point start closing the damper till you get T indoor air = T set-point Other variations are possible

HVAC Control Example 2: Dew point control (Relative Humidity control) filter fan cooling coil heating coil filter mixing damper fresh air T & RH sensors We either measure Dew Point directly or T & RH sensors substitute dew point sensor Humidity generation Heat gains We should supply air with lower humidity ratio (w) and lower temperature

Relative humidity control by cooling coil T DP Mixture Cooling Coil Room Supply Heating coil

Relative humidity control by cooling coil (CC) Cooling coil is controlled by T DP set-point if T DP measured > T DP set-point → send the signal to open more the CC valve if T DP measured < T DP set-point → send the signal to close more the CC valve cooling coil heating coil mixing Fresh air T air & T DP sensors Control valves Heating coil is controlled by T air set-point if T air < T air set-point → send the signal to open more the heating coil valve if T air > T air set-point → send the signal to close more the heating coil valve

Sequence of operation (ECJ research facility) Control logic: Mixture in zone 1: IF (( TM<TSP) & (DPTM<DPTSP) ) heating and humidifying Heater control: IF (TSP>TSA) increase heating or IF (TSP<TSA) decrease heating Humidifier: IF (DPTSP>DPTSA) increase humidifying or IF (DPTSP<DPTSA) decrease humid. Mixture in zone 2: IF ((TM>TSP) & (DPTM<DPTSP) ) cooling and humidifying Cool. coil cont.: IF (TSP TSA) decrease cooling Humidifier: IF (DPTSP>DPTSA) increase humidifying or IF (DPTSP<DPTSA) decrease hum. Mixture in zone 3: IF ((DPTM>DPTSP) ) cooling/dehumidifying and reheatin Cool. coil cont.: IF (DPTSP>DPTSA) increase cooling or IF (DPTSP<DPTSA) decrease cooling Heater control: IF (TSP>TSA) increase heating or IF (TSP<TSA) decrease heating Set Point (SP) Mixture 2 Mixture 3 Mixture 1 DBT SP DPT SP