1 Project

2 Project FINAL PROJECT DELIVERABLES 1) PROJECT REPORT: - Project statement (introduction) 2 pages Explain what are you designing/analyzing and why is that important On the second page clearly identify (bullet list) project outcomes - Building description (geometry) 1-3 pages Schematics that focus on your system(s) Identify all assumptions and simplifications you introduced - Methodology 1-3 pages Describe methodology (equations, schematics, …) Provide a list of assumptions used in your methodology - Results 3-5 pages Formatted results with comments Tables, Charts, Diagrams, … Analysis and Results discussion - Summary page Summary of most important results

3 Project Grading criteria: 1) Approach and solution quality: 60%
1) Approach and solution quality: 60% - Methodology % - Accuracy 20% Result analysis 20% 2) Deliverables: % - Final report 40% - clarity - completeness - steed assumptions and limitations - quality of graphs, tables schematics,….

4 Objectives Learn about 1) DOAS - Principle of operation - Design
- Advantages and disadvantages 2) Control for HVAC systems - Economizers (Psychrometrics) and control - Heat recovery systems (Psychrometrics)

5 www.doas.psu.edu DOAS with multi-split systems
Fresh air?

6 DOAS fresh air configurations

7 DOAS fresh air configurations

8 Issues Related to DOAS Split of sensible and latent load
Selection of hydronic system Winter vs. summer operation Winter operation with DX systems (heat pump)

9 Economizer Economizer (fresh air volume flow rate control)
Controlled device is damper - Damper for the air - Valve for the CC fresh air damper mixing recirc. air T & RH sensors

10 Economizer – cooling regime
How to control the fresh air volume flow rate? If TOA < Tset-point → Supply more fresh air than the minimum required The question is how much? Open the damper for the fresh air and compare the Troom with the Tset-point . Open till you get the Troom = Tset-point If you have 100% fresh air and your still need cooling use cooling coil. What are the priorities: - Control the dampers and then the cooling coils or - Control the valves of cooling coil and then the dampers ? Defend by SEQUENCE OF OERATION the set of operation which HVAC designer provides to the automatic control engineer % fresh air 100% Minimum for ventilation

11 Economizer – cooling regime
Example of SEQUENCE OF OERATIONS: If TOA < Tset-point open the fresh air damper the maximum position Then, if Tindoor air < Tset-point start closing the cooling coil valve If cooling coil valve is closed and T indoor air < Tset-point start closing the damper till you get T indoor air = T set-point Other variations are possible

12 Sequence of operation for the humidity control system design
Adiabatic humidifier CC HC SA OA mixing RA Define the sequence of operation for: WINTER operation and: - case when humidity is not controlled - case when humidity is precisely controlled

13 Sensible and Enthalpy and Desiccant wheels

14 Sensible and Enthalpy Wheels

15 Desiccant wheel Figure 3 – A desiccant-based cooling system combined with regenerative heat exchanger, vapor compression cooling, and evaporative humidifier (hybrid system).