Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.

Slides:



Advertisements
Similar presentations
Optical Fiber Calibration System and Adaptive Power Supply Jiri Kvasnicka, Ivo Polak, Jaroslav Cvach Prague, Institute of Physics Gerald Eigen,
Advertisements

CALICE WHCAL testbeam at SPS H8 27 sep – 03 oct: 6 days for energies up to 180 GeV (+ polarity)
Studies of Small Scintillating Cells with Modified Geometries Alexander Dyshkant for NICADD at NIU.
The Design of MINER  A Howard Budd University of Rochester August, 2004.
Calice, UT ArlingtonJiri Kvasnicka, FZU, Prague1 LED notched fiber system Jiri Kvasnicka 1.Introduction 2.Test setup and fiber layout on HBU0.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
DESY, DEC-2013Ivo Polák, FZU, Prague1 Activity on Adaptive power & Calibration at Prague Ivo Polák, on behalf of Prague’s group QMB1A update.
Mathias Reinecke CALICE meeting Argonne EUDET module – Electronics Integration Contents -Next prototype : architecture -HCAL Base Unit (HBU)
AHCAL – Electromechanical Integration EUDET annual meeting – Paris Oct M. Reinecke.
Setup of Gain Monitoring System with Mr. Uozumi Kobe Univ. Hiroko Ikeda 18,May 2007.
AHCAL Electronics. Status EUDET Prototype Mathias Reinecke for the DESY AHCAL developers EUDET Electronics/DAQ meeting London, June 9th, 2009.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
AHCAL Electronics. Front-end electronics and DAQ Mathias Reinecke CALICE meeting Hamburg March 21st, 2013.
2013 MAR 21Ivo Polák FZU Prague1 Tasks for AIDA SiPM Adaptive HV PSU AIDA subgroup Prague 2013 meeting Characterization of temperature influence to SiPM.
AHCAL Electronics. Status Commissioning and Integration Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 12th, 2010.
First Results from T3B Calice AHCAL Meeting – Desy, January 2011 Christian Soldner Max-Planck-Institute for Physics.
CM26 March 2010Slide 1 EMR Status o Intro o Construction o Magnetic shielding o Electronics o Prototype Cosmics test o Schedule Jean-Sebastien Graulich,
AHCAL – DIF Interface EUDET annual meeting – Paris Oct M. Reinecke.
AHCAL electronics. Status and Outlook Peter Göttlicher for the AHCAL developers CALICE meeting UT Arlington, March 11th, 2010.
Characterization of the static and dynamic
LCWA, ALCPG 2009 Albuquerque, NM Ivo Polák, FZU, Prague1 Calibration system of CALICE AHCAL detector Ivo Polák 1.Two calibration light distribution.
AHCAL updates: SPIROC and DIF Mathias Reinecke, Felix Sefkow CALICE/EUDET electronics meeting London, January 10, 2008.
AHCAL Electronics. Status and Outlook Mathias Reinecke CALICE collaboration meeting Cambridge, UK March 16th-19th, 2012.
TPC Large Prototype cosmic trigger and Micromegas panels D. Attié, P. Colas, E. Delagnes, M. Dixit, A. Giganon, M. Riallot, F. Senée, S. Turnbull Large.
AHCAL Status. Electronics and DAQ Mathias Reinecke CALICE meeting Argonne ANL, Mar. 19th, 2014.
Scintillator Tiles and Test Beam Plans Calice Collaboration Meeting – Casablanca 2010 Christian Soldner Max-Planck-Institute for Physics.
SiTRA test beams at CERN: infrastructure developments and results Annual EUDET meeting NIKHEF Alexandre CHARPY.
1 NIU Integrated Readout Layer Kurt Francis NICADD Northern Illinois University March 19, 2014.
Detector Interface (DIF) Status CALICE meeting – DESYDec Mathias Reinecke.
R&D for a 2nd generation AHCAL prototype LCWS 2007 – DESY Hamburg Mathias Reinecke on behalf of the AHCAL partners.
Supervisor: Samir Arfaoui By: Fatma Helal Sawy
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
AHCAL Physics Prototype. The Electronics Part Mathias Reinecke for the AHCAL developers DESY, March 2nd, 2010.
AHCAL electronics. Status Module Production an Power Pulsing Mathias Reinecke AHCAL main meeting DESY, Dec. 10th, 2013.
AHCAL Electronics. SPIROC2 and HBU measurement results Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
CALICE Tungsten HCAL Prototype status Erika Garutti Wolfgang Klempt Erik van der Kraaij CERN LCD International Workshop on Linear Colliders 2010, October.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
AHCAL Electronics. integration status and open issues Mathias Reinecke CALICE main meeting Univ. HASSAN II, Casablanca, Morocco Sept. 23rd, 2010.
AHCAL Electronics. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE Days DESY Hamburg, March 31st, 2009.
Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.
14 jan 2010 CALICE/EUDET FEE status C. de LA TAILLE.
AHCAL Integration. Status and Outlook Mathias Reinecke for the AHCAL developers CALICE week Lyon IPNL, Sept. 16th – 18th, 2009.
Update on works with SiPMs at Pisa Matteo Morrocchi.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
CALICE/EUDET FEE status C. de LA TAILLE. 31 aug 2009 EUDET SC meeting Status of JRA3 Front End Electronics 2 ILC front-end ASICs : the ROC chips SPIROC.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
CALICE/EUDET FEE status C. de LA TAILLE. 16 jun 2009 TB meeting FNAL ASICs for CALICE/EUDET 2 First generation ASICs Readout of physics prototypes (ECAL,
SuperB workshop SLAC, October 6, Outline Present Design Some thoughts about tile production Updated cost estimate Light yield studies of 3 mm thick.
Future Beam Test Plans of the Calorimeter Group Aug 学術創成会議 Satoru Uozumi (Shinshu) for the GLD calorimeter group We are planning to have two beam.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers EUDET electronics and DAQ meeting Paris Palaiseau, Jan. 14th, 2010.
AHCAL Electronics. status and open issues Mathias Reinecke CALICE ECAL/AHCAL - EUDET electronics and DAQ - AIDA DESY, July 5th to 6th, 2010.
Scintillator-ECAL Beam Test Scintillator-strip ECAL Beam DESY My task and achievement at DESY Contents Satoru Uozumi Shinshu University, Japan Nov-23.
LED notched fibre system short HBU0 party with QMB6
Wing-LDA Timing & performance Beam Interface (BIF)
AHCAL Beam Interface (BIF)
Status of HBU, EBU and SM_HBU
CALICE meeting 2007 – Prague
Silicon Lab Bonn Physikalisches Institut Universität Bonn
HCAL task status report
Testbeam Timing Issues.
Setup for measurements with SCT128 in Ljubljana: SCTA128VG chip
Towards a realistic Scintillator HCAL with SiPM read-out
Scintillator HCAL readout
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
CALICE meeting 2007 – Prague
Status of the EUDET Prototype
Presentation transcript:

Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012

DESY 30th October 2012Erik van der Kraaij, CERN LCD 2 Scintllators: 45x5x2mm strips are used by the japanese they recycled them from a previous prototype tile and had the strips cut from it no clear supplier for their scintillators Read-out: Hammamatsu MPPC (model?) Their layer has 144 tiles (36x4) with 4 HBU and 4 SPIROC2b chips. On top, 3 cards: –DIF (LEMO for Spill signal, TTL signal, and Reset) –Calibration board (LED) –Data-out board with USB connector

DESY 30th October 2012Erik van der Kraaij, CERN LCD 3 Trigger Self-trigger: when one tile has a hit over threshold, all the tiles on the same HBU (36 total) are read out. Validation mode: a crossed scintillator pair in coincidence for external trigger, upstream of the prototype. If validation signal is sent within clock-cycle of self-trigger, data is flagged as validated –Helpful to get rid of noise self-triggers –Japanese team did not manage to operate in this mode Front-end: SPIROC2b Seems to be a black box… Memory: 16 events and 0.5-1s for read-out Complex configuration (Labview programs by DESY people)  not a good idea for early CERN lab setup… Need expertise (LAL? DESY?) for initial setup/operation –Japanese team lacked it, slowed them down greatly

DESY 30th October 2012Erik van der Kraaij, CERN LCD 4 Came in this morning from Katsu They managed to perform measurements at various positions in the shower

CERN 30th October 2012Erik van der Kraaij, CERN LCD 5 Need for CERN lab: at least 3 scintillators: 2 for coincidence trigger to get rid of the noise and the one under test collimated radioactive source SiPM + decoupling circuit => Picoscope Hamamatsu MPPCs from DESY (thank you) –10 of them in Samir’s office (+ a couple of reflective foil sheets) Black box with cooling (or at last temperature monitoring) and shielding Readout options (from Christian) EasiRoc. High level of integration channels. ADC, no TDC. Could be made available by Aachen. SPIROC + testboard at OMEGA. Details still to clarify. CAEN VME module (similar to DESY). PreAmp, ADC, TDC. How to bias MPPCs? CERN pool? Picoscope. 4 channels. Bias via Keithley. CERN pool?

More pictures on the strips 30th October 2012Erik van der Kraaij, CERN LCD 6

TeraScale Alliance testbox For single channel 30th October 2012Erik van der Kraaij, CERN LCD 7

Decoupling Multi-channel board 30th October 2012Erik van der Kraaij, CERN LCD 8

Readout by VME Instead of picoscopes 30th October 2012Erik van der Kraaij, CERN LCD 9

Readout by VME … 30th October 2012Erik van der Kraaij, CERN LCD 10