CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA.

Slides:



Advertisements
Similar presentations
T. Saeki (KEK) 15 May 2014 AWLC2014 at FNAL
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
Superconducting Cavities for Super- KEKB S. Mitsunobu.
Proposed Button Design for a Series of High Power Button Tests Arash Zarrebini-Esfahani 22 nd August 2007.
SM18 Vertical/Horizontal Test Setup LHC Crab Cavity Engineering Meeting Session: Cavity Cryostat Testing & Integration in SM18Cavity Cryostat Testing &
Cavity-Coupler Treatment & Testing Preparation of crab cavities for KEKB RF aging of input couplers. 17 th September 2009, LHC-CC09 at CERN K.Nakanishi.
H. Hayano, KEK, New SRF Facility at Belgrade SRF-WG.
Series Tests of High Gradient Single- cell Superconducting Cavity for the Establishment of KEK Recipe T. Saeki (1), F. Furuta (1), K. Saito (1), M. Ge.
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
Accelerator R&D status in cooperation with CERN and KEK 1.BSM, BHM (T. Mitsuhashi) 2. Crab Cavity (Y. Morita) 3. X-band Acc. Structure (T. Higo) 10 th.
New HOM coupler design Demountable Damped Cavity (DDC) Sokendai, The graduated university for advanced studies. KEK, LL / Ichiro Cavity Group October 21,
Cavity status; recent KEK activities : Hayano (1) STF CM-1 cavities are; MHI-014: 3-rd VT:36MV/m (finished) MHI-015: 3-rd VT: > 18.4MV/m.
KEKB Crab Development K. Hosoyama (KEK) Crab Cavity for HER Crab Cavity for LER Crab Cavity for KEKB History of Crab Cavity R&D Characteristics of Crab.
Status of crab crossing studies Presented by NAKANISHI Kota (KEK) 2008/1/25.
1 BCD/ACD developments for Cavities Several improvements are needed on both BCD/ACD A significant amount of R&D work is needed to resolve issues –Quality.
IHEP SRF Lab Upgrade & Facilities Jianping Dai on behalf of SRF lab upgrade and facilities group 2 nd Workshop of the IHEP 1.3GHz SRF R&D Project, December.
Status of cavity fabrication facility at KEK H. Hayano, KEK Cavity Industrialization Study at KEK Superconducting RF Cavity Technology and Industrialization.
The design of elliptical cavities Gabriele Costanza.
STF EP, VT commissioning by FNAL AES001 H. Hayano, KEK
Superconducting rf test facility STF 1 Optical Inspection update at KEK Ken Watanabe ( KEK ) ILWS08 in Chicago 17-Nov-08.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
D.Proch, DESY; GDE meeting Vancouver 06 Technical systems: Cavity Report Overview on costing activities for ILC –European costing method Overview industrial.
SM18 INFRASTRUCTURE Crab Cavity CryoModule – Conceptual Design Meeting
SCRF Lab and IHEP Jianping Dai On behalf of the SCRF facilities team First Mini-Workshop on IHEP 1.3GHz Superconducting RF project, June 10-11,
KEK R&D for LHC Plan of 800MHz Cavity Calculation of 400MHz Cavity 16 th September 2009, LHC-CC09 at CERN K.Nakanishi.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
TTC Meeting, Frascati, 5-7 December Summary of EP discussions at Oct SMTF meeting at FNAL T. Tajima (LANL), C. Boffo (FNAL)
CERN status - Nb cavity – Manufacturing 1 15/Nevember/2010, Ofelia Capatina EN/MME 1 SPL Cavity Working Group Meeting TaskExternal Company CERN Provide.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Superconducting rf test facility LCWS 2010 in Beijing, 28 Mar 2010, Ken Watanabe Replica-method and local grinding repair K. Watanabe (KEK) LCWS 2010 in.
(1)[12~13/Dec/2009] Optical inspection (2)[14/Dec] frequency & field flatness measurement (3)[10/Mar/2010] pre-EP (5μm) (4)[11/Mar] EP1 (100μm) (5)[11/Mar]
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
Current study status of high gradient at KEK Fumio Furuta KEK SCRF meeting Fermilab. Apr
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
Recent Results of Vertical Test for S1-Global Project at KEK-STF Y. Yamamoto, H. Hayano, E. Kako, S. Noguchi, H. Sakai, M. Satoh, T. Shishido, K. Umemori,
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Standard EP recipe at KEK T. Saeki KEK Hot topics session SRF – 29 July 2011, Chicago.
Centrifugal Barrel Polishing at Fermilab (Tuesday, December 6th at 10:20) Tesla Technology Collaboration IHEP, Beijing December 5 th -8 th, 2011.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
Experiences with KEK-B Crab Cavity KEKB and Crab Cavity History of Crab Cavity Construction and Operation of KEKB Crab Cavities What the KEKB Crab Cavity.
MHI#19 号機の1回目の EP2  Process log  Condition of EP2 & Rinsing process  Status of working  Monitor data during EP & Rinsing process Period : 2012/2/17~
SM18 Vertical & Horizontal Test 110/12/2013Mathieu Therasse CERN BE/RF A. Benoit, O. Brunner, E. Jensen, A. Macpherson, P. Maesen, K. Schirm, W. Venturini.
Developments of new treatment techniques for SRF cavities at KEK HORIZONTAL HPR FOR PERFORMANCE RECOVERY Yoshiyuki MORITA Motivation of developing HHPR.
Page 1 Jean Delayen Subashini De Silva Center for Accelerator Science Department of Physics, Old Dominion University and Thomas Jefferson National Accelerator.
SRF Test Facilities – Functions and Costs Alexander Romanenko Test Facilities Review 17 Mar 2015.
Infrastructure status and plans at CERN 1) W. Weingarten/CERN TTC Milano 28 February - 3 March W. Weingarten/CERN 1)Most of the slides are based.
Summary of STF-EP facility at KEK.
Rongli Geng ILC Cavity Group Meeting October 25, 2011
Vertical Electro-Polishing activities at CEA Saclay
ILC10 Beijing Global Design Effort
WP5 Elliptical cavities
Electropolishing of Dressed ILC 9-cell Cavity
Condition of electron beam welding toward a high gradient application
ILC-SCRF Test Facilities considerations
STF Plan of gradient improvement
Vertical Electropolishing at Marui & KEK
Odu/slac rf-dipole prototype
Design Fabrication and Processing Group H. Padamsee
Some History of Electropolishing of Niobium 1970 – 1990
SPS – RFD Experience and Evolution to LHC
Effort Torwards Improving Large Scale Production for SC Cavities
A COMMON R&D ON THE HIGH GRADIENT Nb CAVITIES
Cost reduction activities in cavity fabrication at MHI
Quality control study with single-cell cavities
LHC-CC09 workshop LHC Crab Cavity Workshop, jointly organized by CERN, EuCARD-ACCNET, US-LARP, KEK, & Daresbury Lab/Cockcroft Institute CERN, September.
Nick Walker (DESY) EU GDE Meeting Oxford
ON THE HIGH GRADIENT Nb CAVITIES
Presentation transcript:

CRAB for HL-LHC KEK activity 2010DEC Yoshiyuki MORITA

Contents Requirements for LHC-Crab –High field operation –Stable operation Needs for superconducting cavities with a complicated structure –How can we prepare clean surface w/o defects or micro-particles? Surface treatments for KEKB-SCC –Rinsing is important to remove chemical residuals and prepare clean surface –Ozonized ultra pure water rinsing –Stable operation Surface treatments for KEKB-Crab –High pressure rinsing –High field operation New KEK EP system –First EP test with a KEKB-prototype cavity –Test results Summary

Requirements for LHC-Crab High crabbing voltage (2.5MV for global crabbing) –KEKB-Crab: 1.4MV Stable operation (low trip rate) –KEKB-HER-Crab : 0.8 ( not acceptable for LHC) –KEKB-LER-Crab : 0.04 (acceptable trip rate for LHC?) –High field operation and stable operation are conflicting Invisible when no crabbing (not to disturb LHC operation) –KEKB was operated with crabs detuned LHC-Crab designs have more complicated structures than KEKB-Crab To develop the LHC-crab cavity –Need cavity R&D for high fields and low trip rate Important to establish surface treatments for complicated structures –Need beam tests To confirm reliability before installation

Baseline cavity for global crabbing Needs for more complicated structures Baseline cavity proposed by US-LARP The baseline design has similar properties like KEKB-Crab –Elliptical/squashed cross section –Coaxial coupler structure Different properties –Two-cell cavity –800 MHz (KEKB-Crab: 509MHz) –More complicated LOM/SOM/HOM coupler Baseline design, L. Xiao, LARP-CM11, 10/28/08 Coaxial structure Elliptical cell Crab cavity design for SuperKEKB (High current option) has much more complicated structure.

Local crab crossing needs compact crab cavities There are many cavity designs for compact crabs, however… Can we fabricate such a complicated structure? How can we polish cavity inner surface? Because available space is tight. KEK has long history for superconducting cavities. We made and operated crab cavities for the first time. Let’s study fabrication and surface treatment methods for compact crab cavities. Let’s establish those methods for luminosity increase of LHC. Outline of LHC-Crab R&D Study for fabrication Forming of a model cavity Electron beam welding Study for surface treatments Electro-polishing Heat treatment High pressure rinsing etc. Cold performance test Feedback

Surface treatments for KEKB-SCC and KEKB-Crab Degreasing Pre-EP,EP Ⅰ (80~100μm) Heat treatment (700 ℃ x 90min) EP Ⅱ (10~15μm) Pure water shower rinsing (4 bar) Ozonized ultra pure water rinsing Ultra-sonic rinsing with ultra pure water Assembling and baking (120~150 ℃ ) VT KEKB-SCC Developed for stable KEKB-Crab Developed for high crabbing voltage ~1.4MV Barrel polishing (~100μm) Pre-EP, EP Ⅰ (~100μm) HPR Heat treatment (700 ℃ x 3h) EP Ⅱ (~5μm) HPR (80 bar, 45min) HPR after assembling for VT Baking before ~100 ℃ VT Combining above two methods may be a suitable surface treatments for high field and stable operation?

New electro-polishing system for KEKB-SCC Old EP system at Nomura Plating Co. Rotating equipment and EP bed were transferred to new EP facility at KEK. Horizontal and rotating system for electro-polishing developed for TRISTAN superconducting cavities. New features Automatic controlling system Tight sealing for HF acid S. Mitsunobu Control panel

New EP facility for KEKB-SCC S. Mitsunobu New EP equipment for SCC on 2 nd FloorAcid gas cleaning system New 500 L reservoir for HF/H 2 SO 4 solutionUltra-sonic bath and shower tank

Electro-polishing Removing solution S. Mitsunobu Electrolyte solution is extracted while the cavity was vertically held. EP bed is moving to hold the cavity vertically. Removing solution Electrolyte solution: HF(45%):H 2 SO 4 (96%)=1:9 Acid temperature: 20~30 ℃ Cathode voltage: -20~-30 V Current density: 30~50 mA (EPI>EPII) Acid flow rate: 40L/min 1 st EP for a test cavity

4 bar shower rinsing with pure water O 3 rinsing Ultra-sonic rinsing in a hot water bath S. Mitsunobu

Vertical test Eacc = 13MV/ m was achieved after EP (@ KEK) Test cavity was successfully electro-polished with new EP system Before EP After EP

Summary Needs for –more complicated structures –High field operation –Stable operation Needs for study to establish surface preparation methods Our new EP facility is ready ! –Three KEKB-SCC type cavities (for TAIWAN light source project) will be electro-polished next year –LHC-Crab can also be electro-polished with minor modifications We are going to study surface preparation with O 3 Rinsing+HPR after EPII If we succeed, we can apply our preparation method to KEKB-SCC and HCL-Crab

Reel cavity To move the acceleration mode frequency higher is one of solutions to reduce the Rsh. The big difference between the frequency of crabbing and accelerating mode arrow simple waveguide HOM dumper.