Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April 20-24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility.

Slides:



Advertisements
Similar presentations
ISAC Physics Working Group Convenors Malcolm Butler and Barry Davids.
Advertisements

SYNTHESIS OF SUPER HEAVY ELEMENTS
Grupo de Física Nuclear Experimental IEMIEM CSIC ISOL MAGISOL Meeting January 2009Mª José Gª Borge SPIRAL 2 Outline:
Γ spectroscopy of neutron-rich 95,96 Rb nuclei by the incomplete fusion reaction of 94 Kr on 7 Li Simone Bottoni University of Milan Mini Workshop 1°-
The low-energy facility at SPIRAL2 transport-energy (50 keV) exotic-nuclide beams for: For the DESIR Collaboration: D. Lunney, SPIRAL2 SAC, 29 January.
DESIR Progress Report DESIR hall details defined for civil construction: - compressed air, liquid nitrogen, cooling water, etc detailed layout of RFQ-HRS.
Possibility for the production and study of heavy neutron-rich nuclei formed in multi-nucleon transfer reactions proposal for a new project at FLNR V.
Teresa Kurtukian-Nieto Centre d’Etudes Nucléaires de Bordeaux Gradignan Precision half-life determination of the superallowed 0 + → 0 + β + -emmiters 42.
The LaSpec project. At FAIR… Cheapest(?),Fully destripped…
Limits of Stability Neutron Drip Line? Proton Drip Line? Known Nuclei Heavy Elements? Fission Limit?
DESIR  SPIRAL2 organization & scientific program layout of the facility status and perspectives LUMIERE  Laser DESIR: the LUMIERE.
Reaction studies at SPIRAL II Krzysztof Rusek * A. Soltan Institute for Nuclear Studies Warsaw * Based on the contributions to the SPIRAL II workshop,
PHYS40422: Applied Nuclear Physics Paul Campbell Room Interaction of Radiation with Matter 2.Radiation Detection.
ISCC 24 May 2004L.M. Fraile L.M. Fraile, CERN PH/IS ISOLDE scientific coordinator’s report ISOLDE Collaboration Committee 24 th May 2004 ISOLDE scientific.
Workshop on Physics on Nuclei at Extremes, Tokyo Institute of Technology, Institute for Nuclear Research and Nuclear Energy Bulgarian Academy.
A facility for Nuclear, Atomic, Material and Radiobiology Sciences. Delivering stable (from C to U) and radioactive ions (from He to Xe) in the energy.
Isospin impurity of the Isobaric Analogue State of super-allowed beta decay experimental technique isospin impurity determination Bertram Blank, CEN Bordeaux-Gradignan.
Noyaux CERN- ISOLDE Yorick Blumenfeld.
Structures and shapes from ground state properties 1.Nuclear properties from laser spectroscopy 2.Status of laser measurements of moments and radii 3.New.
FAIR/SFRS meeting at HIPHeikki Penttila Oct 6, 2008 Facility for Antiproton and Ion Research FAIR is An international accelerator facility of the ”next.
NUSTAR Nuclear Structure, Astrophysics, Reactions NUSTAR is the biggest collaboration in FAIR The collaboration unites 450 scientists from 98 institutions.
CEA Bruyères-le-chatel, April 27, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety.
Nuclear physics: the ISOLDE facility
Radioactive ion beam facilities How does they work ? 2012 Student Practice in JINR Fields of Research 9.oct.2012 I. Sivacekflerovlab.jinr.ru.
Beam transport tunnels  from -9.3 to m  3 levels, 310 m 2, 1020 m 3  97 m of beam lines Technical rooms  from to m  3 levels, 660.
The DESIR facility at SPIRAL2  collaboration initiated during the first SPIRAL2 workshop, July 2005  to use SPIRAL2 and SPIRAL low energy (
Yu. Oganessian FLNR (JINR) PAC–meeting, June 22, 2009, Dubna Experimental activities and main results of the researches at FLNR (JINR) Theme: Synthesis.
DESIR at SPIRAL2 Désintégration, Excitation et Stockage des Ions Radioactifs Decay, excitation and storage of radioactive beams DESIR: facility layout.
The REXTRAP Penning Trap Pierre Delahaye, CERN/ISOLDE Friedhelm Ames, Pierre Delahaye, Fredrik Wenander and the REXISOLDE collaboration TAS workshop, LPC.
Chapter 15 Nuclear Radiation
Fundamental Interactions Physics & Instrumentation Conclusions Conveners: P. Mueller, J. Clark G. Savard, N. Scielzo.
RADIATION *Penetrating rays emitted by a radioactive source *Ranges from Cosmic and Gamma Rays to Radio Waves.
Physics at DESIR RFQ cooler SHIRaC HRS transfert beam lines DESIR building safety finances J.C. Thomas, GANIL July 2010.
Reiner Krücken Welcome to Kloster Banz. Reiner Krücken The Munich Accelerator for Fission Fragments at the FRM II in Garching Facility Overview Status.
European Isotope Separation On-Line Radioactive Nuclear Beam Facility A preliminary design study of the next- generation European ISOL RNB facility GANIL,
Status Report of the LISOL Laser Ion Source Yu.Kudryavtsev, T.Cocolios, M.Facina, J.Gentens, M.Huyse, O.Ivanov, D.Pauwels, M.Sawicka, P.Van den Bergh,
Low-energy physics in France SIRa at GANIL ̵ charge radius of 6 He LIRAT at SPIRAL1/GANIL ̵  angular correlations: LPCTrap ̵ mirror  decays ̵ branching.
Nuclear Radiation 9.2. The Nucleus Protons and neutrons Charge of electrons and protons – x C = e –Proton +e –Electron -e.
Nanuf03, Bucharest, Stefan Kopecky Traps for fission product ions at IGISOL Experimental Facilities Mass Measurements Status and Future Perspectives.
Spectroscopy studies by  decay -Proton-rich nuclei N~Z Deformation in the mass region A~75 Fundamental aspects of weak interaction, test of CVC -Neutron-rich.
The DESIR physics workshop (Leuven 26 th – 28 th May) Paul Campbell Present status… Community interests… The future experiments…
W. Nazarewicz. Limit of stability for heavy nuclei Meitner & Frisch (1939): Nucleus is like liquid drop For Z>100: repulsive Coulomb force stronger than.
Fundamental interactions and symmetries at low energies what does NUPECC say…. Time-reversal violation and electric dipole moments Time-reversal violation.
UK Research in Nuclear Physics P J Nolan University of Liverpool.
The DESIR low energy beam facility at SPIRAL2 DESRI Decay, Excitation and Storage of Radioactive Ions B. Blank, CENBG LEA.
1 CNS summer school 2002 The RI-Beam Factory and Recent Development in Superheavy Elements Search at RIKEN ◆ Brief introduction to the RI Beam Factory.
February 12-15,2003 PROCON 2003, Legnaro-Padova, Italy Jean Charles THOMAS University of Leuven / IKS, Belgium University of Bordeaux I / CENBG, France.
The HITRAP Project at GSI For the HITRAP collaboration: Frank Herfurth GSI Darmstadt.
Section 19.1 Radioactivity TYPES OF RADIOACTIVE DECAY EQ.: WHAT ARE THE DIFFERENT TYPES OF RADIOACTIVE DECAY AND HOW ARE THESE REPRESENTED IN A NUCLEAR.
Chapter 9 Book Nuclear Changes #20. I. Nuclear Radiation Radioactivity – Nucleus emits one or more particles – Unstable nuclei Unstable – Nuclei has to.
ISNP2009, BARC, Mumbai, 8-12 december, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme.
Nuclear moments and charge radii of Mg isotopes from N=8 up to (and beyond) N=20 Univ. Mainz: M. Kowalska, R. Neugart K.U.Leuven: D. Borremans, S. Gheysen,
The TRI  P programme at KVI Tests of the Standard Model at low energy Hans Wilschut KVI – Groningen Low energy tests e.g. Time reversal violation precision.
Summary of LOIs to INTC (24 June 2010). Call for Letters of Intent (deadline May 21) 34 Letters submitted 284 Participants from 76 Laboratories in 22.
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 102 nd Session, September 2007, Dubna.
Summary: Physics Opportunities for ISOLDE and n_TOF Peter Butler.
CEA Saclay, April 24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety around DESIR.
CEA Saclay, April 24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Safety around DESIR.
The Belgian Research Initiative on eXotic nuclei – BriX network BriX Days Oostende, March 25-26, 2013 Funded by the Interuniversity Attraction Poles Programme.
Reinhard Kulessa1 Polish-German Meeting on the New International Accelerator Facility at Darmstadt Present Polish-German Collaborations at GSI.
The DESIR facility at SPIRAL2
PIPERADE: A Penning trap isobar separator for SPIRAL2/DESIR
FAST IN-MEDIUM FRAGMENTATION OF PROJECTILE NUCLEI
The DESIR facility at SPIRAL2
for the EURISOL Steering Committee
Nuclear Radiation.
Laser assisted decay spectroscopy at the cris beam line at
Nuclear Reactions.
Presentation transcript:

Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April 20-24, 2009 SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme Bertram Blank CEN Bordeaux-Gradignan

Phase Accelerator S3 NFS DESIR RIB PRODUCTION Phase /4 Existing GANIL facility

Spins&Shapes Position of drip-lines Position of drip-lines N=Z rp-process Heavy and Super Heavy Elements Heavy and Super Heavy Elements r-process path Haloes & Structures in the Continuum Equation of State Role of Isospin Equation of State Role of Isospin Spins & Shapes Shell structure far from stability Shell structure far from stability Neutrons for science Atomic & solid state physics Radiobiology & Isotope production Neutrons for science Atomic & solid state physics Radiobiology & Isotope production ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES

Particle Array Gamma Array AGATA PARIS GASPARD FAZIA EXOGAM 2 ACTAR NFS S3S3 DESIR : 19 Letters of Intent, 600 physicists from 34 countries : TDR for big instrumentation at SPIRAL2

DESIR Low-energy beams from: S1, S2, S3 S3 Production building SPIRAL2 (S2) GANIL – SPIRAL1 (S1) Désintégration, excitation et stockage d’ions radioactifs (Decay, excitation and storage of radioactive ions)

Projectile or target fragmentation at 95 MeV/A main interest: very neutron- and proton-rich light nuclei 1+  n+

Fission, fusion evaporation, DIC main interest: - fission products - medium-mass proton-rich nuclei UCx 2H2H IS UCxIS HI n 2H2H Target 2H2H IS n Target IS Converter

LISOL Gas catcher Fusion-evaporation reactions at Coulomb Barrier, DIC main interest: - very heavy nuclei - N=Z nuclei - very short-lived isotopes - refractory elements

to DESIR Identification station to CIME RFQ-HRS m/  m = SPIRAL2 Production

Optical studies for double HRS are under way: aim is m/  m = for 2  mm mrad to DESIR Identification station to CIME RFQ-HRS Teresa Kurtukian Nieto, CENBG

Length = 70 cm Radius = 3mm Florian Duval, Gilles Ban, Dave Lunney

Gas : Helium at mbar ΔE ≈ 0.18eV (before re- acceleration)

Without gas : 12 π.mm.mradHelium at mbar : 4.75 π.mm.mrad keV → ≈ 1 60keV Still under investigation : –RF heating –Residual gas effect outside the RFQ section –Charge-exchange process

Laser room (mezzanine) Meeting room (on top of DAQ) Kitchen + WC (on top of CR) MLL trap Collinear Laser spectroscopy  -NMR RFQ bun- cher Penning trap + Decay setup Paul trap General purpose SAS Electronics Desk Access 5 m Beam from Level -1 TAS Neutron ditch Crane access to basement Double MOT General purpose IS Identification station with tape LN2 Gas & waste storage LUMIERE BESTIOL DAQ room Control room off-line source 2 off-line source 1

Supply Electri- city Gray Room 2 Gray Room 1 Assembly Room 3 Control Racks Interfaces HV supplies Crane access to basement Stor- age 1 Assembly Room 2 Assembly Room 1 Stor- age 2 Radio lab 5 m storage Limits of DESIR hall free Beam from Production building, S3 and SPIRAL1 Work shop X Identification and radioprotection measurements Neutron ditch

RFQ SHIRAC:Gilles Ban HRS: Bertram Blank DESIR building:Franck Delalee General purpose ion buncher GPIB + stable ion sources: Pierre Delahaye Identification station:Philippe Dessagne Beam transport lines: Francois Le Blanc Safety and security:Jean-Charles Thomas Command / Control, diagnostics:Stéphane Grévy

submitted on December 19, 2008 presented to SPIRAL2 SAC on January 29, 2009 strongly supported by SPIRAL2 SAC…. about 100 pages of technical description of DESIR facility and its equipment co-signed by 111 physicists and engineers of 15 countries contains a general description of buildings and interfaces description of major installations like traps, spectroscopy setups etc report available on DESIR web page (

Collinear Laser spectroscopy: - spins - magnetic moments - quadrupole moments - change of charge radii  -NMR spectroscopy: - nuclear gyromagnetic factor - quadrupole moment N=50, N=64, N=82, … Microwave double resonance in a Paul trap: - hyperfine anomaly and higher order momenta (octupole and hexadecapole deformation) Eu, Cs, Au, Rn, Fr, Ra, Am …. LUMIERE Laser tilisation for Measurement and Laser Utilisation for Measurement and Ionization of Exotic Radioactive Elements F. Le Blanc,Orsay G. Neyens, Leuven P. Campbell, Manchester

Decay studies with halo nuclei Clustering studies in light nuclei  -delayed charged-particle emission: e.g. proton-proton correlation Super-allowed  decays and the standard model of electro-weak interaction Deformation and Gamow-Teller distribution 2n correlations, P n and nuclear structure (r-process)... BESTIOL BESTIOL BEta decay STudies at the SPIRAL2 IsOL facility TETRA, Y. Penionzhkevich (Dubna) TAS, J.L. Tain (Valencia)  setup, B. Blank (Bordeaux) M.J.G. Borge, Madrid

MLLTRAP High-accuracy mass measurements - unitarity of CKM matrix (V ud ): 50 Mn, 54 Co with  M/M~ transuranium isotopes (beams from S 3 ): M(Z>102) In-trap spectroscopy: - conversion electron and  spectroscopy: shape coexistence Trap-assisted spectroscopy -  decay studies of isomerically pure radioactive species P. Thirolf, Munich Set-up being installed at MLL/Garching

KVI atomic trapping facility New limits on scalar and tensor contributions in the weak interaction New limits on time-reversal violation in beta decay Systematic of atomic parity non-conservation in a long isotopic chain H. Wilschut, Groningen Experimental set-up at KVI

DESIR: 29 weeks of RIB/year: 10 weeks of RIB from SPIRAL2, 4 weeks from S3, 15 weeks from SPIRAL1 DESIR: 29 weeks of RIB/year: 10 weeks of RIB from SPIRAL2, 4 weeks from S3, 15 weeks from SPIRAL1 Standard planning; one production cave

Phase I Phase II

Main parts:estimated costs fund available RFQ and HRS « building »: included in SPIRAL2 project DESIR building + interfaces: 6000 k€ 2000 k€ (CPER) RFQ: 450 k€ + ? 320 k€ (CPER) HRS: 2000 k€ + ? - beam lines: 4500 k€ - off-line sources + GPIB: 290 k€ - identification station: 140 k€ - control / command, diagnostics: 400 k€ together with SPIRAL2

RFQ: on-going tests, study of “nuclearisation”, study of final version of RFQ HRS: detailed optical study of new ALPHA version, detailed mechanical study beam lines: preliminary design, cost estimate, detailed design study stable ion sources: definition, purchase GPIB: study and construction Identification station: preliminary design, detailed design, construction DESIR building: like SPIRAL2 Phase 2 construction program…. decision about construction at latest mid 2010 ……