Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008.

Slides:



Advertisements
Similar presentations
WATER QUALITY ANALYSIS for ANTIDEGRADATION
Advertisements

Module 2: Bioretention Area Siting and Design Andy Rowe, PE, LEED AP, QSD Cannon.
Stream Corridors Christine Hall Natural Resources Conservation Service North Jersey RC&D Slides 1-12.
Proposed Land Use & Development Regulations Public Hearing Month Day, 2012.
Wetland Critical Areas - Draft Ordinance Overview 18.20: Definitions Many new definitions added for clarity when used in the regulations and several unnecessary.
North Carolina Ecosystem Enhancement Program (NCEEP) Project Implementation.
Proposed Stormwater Regulations Public Forum Richland County Government September 2009.
Draft Kane County 2040 Green Infrastructure Plan Energy and Environment Committee November 14, 2013.
April 14, Indicate every resource type proposed for impact on the Application: Tidal Wetland (short form for some projects) Nontidal Wetland Waterway.
LID and Stormwater Technical Resource Center Update County Road Administration Board November 3,
Planned Unit Development
Island County SMP Shoreline Residential Development Workshop December 5, 2011.
Resourceful. naturally. Conservation Design & Volume Reduction Hanover, MN.
Examples for Mitigation Category 1 and 2 Streams.
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Integrating LID Into the Development Planning Process.
Open Space Residential Development Bylaw Town of Rehoboth.
The Science of Stream Buffers Lake George Stream Corridor Management Stakeholder Meeting May 28, 2008.
NBOZ Northlake Boulevard Overlay Zoning District Village of North Palm Beach Landscape Element Requirements.
Introduction to PA Act 167 Stormwater Management Planning Little Juniata River Watershed April 21, 2005.
Ohio Balanced Growth Program Best Local Land Use Practices Development Incentives Kirby Date, AICP, Cleveland State University.
Summit #1 San Juan County Shoreline Master Program Update March 1 st, 2 nd, and 3 rd
Protective Regulations Ohio Lake Erie Commission Best Local Land Use Practices January, 2007 Kirby Date, Countryside Program Coordinator.
IMPACTS OF LAND DEVELOPMENT ON OREGON’S WATERS 2001 This slide show was borrowed from the internet but we added our own research when we presented it.
Agua Hedionda Watershed Management Plan Watershed Planning Group Meeting June 5, 2008 Carlsbad, CA.
Steve Harrison, Environmental Manager Bureau of Entomology and Pest Control -Mosquito Control Section.
Bureau of Watershed Management Regulatory Proposal Chapter 105 Dam Safety and Waterway Management February 21, 2007.
Response to Comments Workshop Presented by: Eric Beck, P.E. RIDEM July 24, 2003 Developed by: Laura Stephenson, Greg Goblick, Margarita Chatterton.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015 Watershed Protection & CodeNEXT Austin Neighborhoods Council March 25, 2015.
Tar-Pamlico Watershed Assessment. Proposed Water Quality Improvement Projects Improvement project types Model scenarios Targeted projects Stakeholder.
Community Development Department ISLAND WALK REZONING REQUEST APPLICATION #2648.
Stormwater 101 Ohio Lake Erie Commission Best Local Land Use Practices Kirby Date, AICP.
Applying Stream Buffer Science to the Lake George Watershed Lake George Stream Corridor Management Stakeholder Meeting May 28, 2008.
Department of Public Works NPDES Low Impact Development and Green Streets Resolutions City Council August 17, 2015.
Chumstick Creek Salmon Habitat Conditions* Land development, road construction, and other human activities have affected channel migration and sediment.
Board of County Commissioners PUBLIC HEARING December 2, 2008.
Watercourse DPA District of North Vancouver Streamside DPA Development Permit Area for the Protection of the Natural Environment: Streamside Areas Public.
Bassett Creek Water Management Commission Joint Advisory Group Meeting January 23, 2001.
Stormwater Retrofitting: The Art of Opportunity Prepared by the Center for Watershed Protection.
February 20, 2007 Macon County Planning Board. Structure Height Ordinance Allows construction to 4 stories or 48 feet, whichever is greater Measured from.
Managing Shoreline Properties Your name here. Water Cycle.
Low Impact Development (LID)
Stormwater Overview Board of County Commissioners Planning Conference March 1, 2007.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
GREEN INFRASTRUCTURE FUNCTIONAL MASTER PLAN Prince George’s County MNCPP-C Draft: December, 2004.
12 July 2010 NYS Department of Environmental Conservation Division of Environmental Permits Critical Environmental Areas Under SEQR What Do They Mean?
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
Agenda  Review project scope and goals  Update project status  Review results of public surveys  Identification of capital projects  Draft capital.
Ohio Balanced Growth Program Codes and Ordinances Workshop: Recommendations for Development and Site Layout Kirby Date, AICP, Cleveland State University.
Bureau of Watershed Management Preliminary Regulatory Proposal Chapter 102 Erosion, Sediment and Stormwater Management December 19, 2007.
TOPICS IN LAND SURVEYING: SUBDIVISIONS TREC #7220 TIM HOWELL, RLS TREC INSTRUCTOR #1556.
Draft Generic Environmental Impact Statement for Adoption of Stream Corridor Management Regulations for the Lake George Park.
University of Washington Institute for Hazards Mitigation Planning and Research Visions for Kimball Creek.
County-Wide Act 167 Plan “County-wide Act 167 Stormwater Management Plan for Chester County, PA” was prepared by: Chester County Water Resources Authority.
Prepared by: Alex Fisch Planning Services Division.
STORM WATER SOLUTIONS FOR EXISTING URBAN AREAS: IDENTIFYING SITES TO MAXIMIZE RESULTS Jared Bartley, Cuyahoga SWCD September 8, 2011.
LAND Subdivie a 4.27 acres into 18 lots 17 detached single family homes One duplex Base density allows for unit Affordable housing bonus.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Sustainable Vineyard Practices Replanting Strategies & Economics December 13, 2012 Conditional Waiver of Waste Discharge Requirements Vineyards in Napa.
OPEN SPACE/ CONSERVATION
Minnesota Resort and Campground Association Fall Conference
Hudson Wetlands Protection Bylaw
Shoreline Trees & Shrubs
EPA Public Meeting Dallas, Texas May 10, 2005
Request for a Major Variance from the Neuse River Riparian Area Protection Rules    Harshavardhan Tummalpally 5201 Trinity Road Raleigh, NC January.
Regulation Amendment AM April 3, 2018.
Water Quality Protection Zones
Presentation transcript:

Update: Where We Are and Feedback Lake George Stream Corridor Management Stake Holder Meeting June 25, 2008

Process for Stream Corridor Management Regulations First Stakeholder MeetingMay 28, 2008 Second Stakeholder MeetingJune 25, 2008 Draft GEIS for Public CommentNovember 15, 2008 Public HearingDecember 1-5 Final GEISFebruary 9, 2009 Final Regulations PromulgatedAfter March, 2009

Feedback from Last Meeting - I Mapping Should be field checked. Example widths should be widened. Buffer Information Examples of other programs. Data on stream buffer implementation (before and after).

Feedback from Last Meeting - II Regulation Program needs to be simple. Process needs to be transparent. Measures of success? Need incentives/education for compliance. Should address property rights. How do we treat streams that originate in the Lake George Park, but flow to other waters?

Feedback from Last Meeting - III Regulation (continued) Difference between redevelopment and redevelopment? How do we “retrofit” during redevelopment? Other Broader Concerns Need to include state agencies, towns and counties who cause most of the problem. Need to address septic systems.

Important Note: “Starting Point” proposal is a technically justifiable option, but is not at this point the recommended criteria for Lake George. Feedback, along with further analysis, will help to determine if these criteria are feasible.

Topics for Discussion Buffer Width Buffer Expansion Vegetation Within the Buffer Stream Crossings Use of Stream Mapping in the Regulation Property Rights Issues, Exceptions Regulations for Redevelopment Versus New Subdivisions Other Concerns?

Any Major Topics We Aren’t Covering?

Buffer Width Starting Point: 100’ Buffer from High Water Reasons: Typical of Many Communities (range between 50’-200’) Provides pollutant removal and temperature benefits Same as DEC Wetland Buffer

“Bankfull Flow” or “Mean High Water” (Source: Ontario Ministry of Natural Resources

Impacts to Property* Lot Size 1.3-acre3.2-acre8.5-acre100-acre Buffer Area (acres) 0.55 (42% of lot) 0.86 (27% of lot) 1.40 (16% of lot) 4.80 (5% of lot) Remaining Lot Area (acres) *Assumption: Square Lot with stream along 1 edge of the property

Modified from: Emmons & Olivier Resources, 2001 Critical Buffer Widths

Concerns/ Comments 100’ Too Narrow? Too Wide? Just Right?

Buffer Expansion Typical Buffer Expansion for: Steep Slopes Wetlands Floodplain Starting Point: Steep slopes, wetlands do not count for buffer. Expand to include floodplain.

Starting Point Expand for: All Slopes>15% Wetlands

Buffer Management - I Potential Prohibited Uses Tree Clearing Construction of Structures Mowing Fertilizing Storage of Hazardous Materials

Any others that should be restricted?

Should any of these uses be allowed?

Buffer Management - II Potential Allowable uses Utility rights of way Footpaths Road crossings, where permitted Docks, where permitted Stormwater management practices (50’ setback)

Should any of these uses be prohibited?

Any Other Uses That Should Be Allowed? Uses Where they should be allowed

Stream Crossings

Stream Crossing Starting Point Cross perpendicular to the buffer. Minimize width. Limit to one crossing per 1000 feet. Design to convey the 100-year storm. Design to allow fish passage.

Additional criteria or recommendations? Any concerns?

Use of Mapping Accuracy of the Data Streams Mapped (1 st order?) What is a stream? When should site mapping be required What should we do with non-mapped, intermittent conveyances

Mapping: Any Known Missing or Inaccurate Streams? Review existing maps at:

Is this a Stream? Some Indicators Defined Channel USGS “Dashed Line” Hydric Soils Flows “30%-90% of the year” Flows with baseflow. Identified as a wetland.

How should we treat unmapped, intermittent streams? Starting Point: No clearing of banks. Provide buffer as much of a buffer as possible to prevent sedimentation. Definition: Wetlands attached to the stream network?

Property Rights 1: Who Owns the Buffer? Can be Held in an Easement Have a Deed Restriction Purchased

Potential Guidelines for Waivers For new single lot development: Buffer makes construction of a single home impossible? Retain a 25’ buffer for mapped streams? For expansions on existing lots Automatic waiver if less than 250 sf of impervious cover constructed within the buffer? Retain a 25’ buffer for mapped streams?

Other Guidance for Waivers?

“Grandfathering”: Which Sites Should This Apply To? Considerations: Sites where Subdivision Approval Has Been Granted. What should we do here? Sites Under Construction Existing Impervious Cover

Subdivisions Versus Single Lot Development Starting Point: No Waivers for Subdivisions because: Site Design Allows for more flexibility The buffer will affect less of these large parcels (i.e., before subdivision)

Redevelopment Starting point Waivers available (See above) No reforestation typically required, but encouraged. Incorporated as part of the waiver process?

Comments after Meeting Send to: Deb Caraco