SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond.

Slides:



Advertisements
Similar presentations
Fast and Precise Beam Energy Measurement at the International Linear Collider Michele Viti.
Advertisements

Test Beam at IHEP,CAS ZHANG Liang sheng, Test Beam Group Introduction BEPC/BES Ⅱ will be upgraded as BEPC Ⅱ / BES Ⅲ, it is necessary to do beam test for.
SLAC Electron Beam Test Facilities 5 MeV to 23 GeV Carsten Hast, Head Test Facilities SAREC Meeting at SLAC, July 2013 FACET ● ESTB ● NLCTA ● ASTA.
1 Methods of Experimental Particle Physics Alexei Safonov Lecture #8.
FACET Status ESTB 2011 Workshop Christine Clarke March 17 th 2011.
FACET: The Proposal Process with Q & A Carsten Hast SLAC National Accelerator Laboratory.
ESTB Test Beam Procedures User Support Operations Schedules Carsten Hast March 17 th 2011.
ESTB Test Beam Upgrades Hadrons Shorter bunch length Carsten Hast March 17 th 2011.
FACET: A National User Facility Carsten Hast SLAC National Accelerator Laboratory.
Welcome! Mauro Pivi SLAC, ESTB Workshop March 2011, SLAC.
Radiation Physics Beam Tests J. Bauer, J. Liu, L. Nicolas, S. Rokni, M. Santana ESTB Workshop 2011 March 17, 2011.
PEP- II Linac Accelerator Systems Department The PEP-II B-Factory Accelerator John T. Seeman Assistant Director Particle and Particle-Astrophysics Division.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
Accelerator Systems Division FACET Project Management John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
PEP-II Overview & Ramp Down Plan J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
Linac Beams for Fixed Target Experiments Presentation by Roger Erickson SLAC Operations Review SLAC, June 15-16, 2004.
TEST BEAMS Stanford Linear Accelerator Center Ted Fieguth DoE/SLAC Program Review April & May 1, 1997.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
Machine-Detector Interface MDI Panel Report MDI Panel is one of several World-Wide Study (WWS) panels (R&D, Detector costing, MDI, 2 IRs) Interim panel.
LCLS Undulator Systems TDR Charge Linac Coherent Light Source Stanford Linear Accelerator Center Technical Review, March 3, 2004.
Accelerator Systems Division FACET Accelerator Overview John Seeman for the FACET Study Group PPA Directorate Stanford Linear Accelerator Center DOE FACET.
Is there synergy between ILC and SuperB? Steve Playfer University of Edinburgh.
1 DOE FACET Review, Feb. 19, 2008 M. Woods, SLAC FACET Review: End Station A Facility and Science ESA provides 2 nd experimental facility expands FACET’s.
2 February 2005Ken Moffeit Spin Rotation scheme for two IRs Ken Moffeit SLAC.
Discussion session Carsten Hast, Mauro Pivi SLAC.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
AS Diagnostic Collaboration Mark Boland
The Overview of the ILC RTML Bunch Compressor Design Sergei Seletskiy LCWS 13 November, 2012.
NLCTA and ESA (Next Linear Collider Test Accelerator and End Station A) Carsten Hast Test Facilities Department Head SLAC DOE HEP Review July 7 – 9, 2008.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
Linac R&D Update May 15, L-Band Source Consists of a LLRF system (VME/Epics based), a SNS High Voltage Converter Modulator (on loan), a Thales 2104C.
1 of 29 LCWS’06, March 2006T. Markiewicz for M. Woods, SLAC LCWS’06 Bangalore March 12, 2006.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
The T506 Experiment: Electromagnetically-Induced Radiation Damage to Solid-State Sensors Test Facilities Users Workshop SLAC, September Bruce Schumm.
FACET Update ARD Status Meeting Christine Clarke April 14 th 2011.
1 Plan and Opportunities for Migration and Integration of the Photoinjector into New Muon Lab Mike Church AAC Review - 12/5/06.
The End Station Test Beam (ESTB) at SLAC Carsten Hast For the everlasting never giving up SLAC Test Beam Gang R. Erickson, T. Fieguth, C. Hast, J. Jaros,
SLAC End Station A Test Beam ESTB Carsten Hast SLAC National Accelerator Laboratory ALCPG11 Eugene, Oregon March 22 nd, 2011.
ESTB End Station Test Beam Design, Performance, Infrastructure, Status Mauro Pivi, SLAC National Accelerator Laboratory on behalf of ESTB/ESA team ARD.
FACET User Support Carsten Hast Accelerator Research Division Test Facilities Department
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
End Station A Test Beam Facility ESTB Carsten Hast SiD Workshop SLAC, January 16-18, 2013,
For Layout of ILC , revised K.Kubo Based on following choices. Positron source: Prepare both conventional and undulator based. Place the.
Tuning Techniques And Operator Diagnostics for FACET at SLAC National Accelerator Laboratory Chris Melton SLAC Accelerator Operations.
1 SLAC EPAC Meeting, Jan M. Woods, SLAC SLAC EPAC Meeting January 24, 2006 CCLRCLLNLQMULU.
Iowa Test Plans for ESTB B. Bilki, Y. Onel University Of Iowa.
The T506 Experiment: Electromagnetically-induced Radiation Damage to Solid-State Sensors Test Facilities Users Workshop SLAC, September Bruce Schumm.
Instrumentation at ATF / TTF Accelerator Test Facility (KEK) Tesla Test Facility – FLASH (DESY) ESA / LCLS (SLAC) Marc Ross, SLAC.
Proposal for the End Station Test Beam (ESTB) at SLAC John Jaros ALCPG09 Albuquerque September 30, 2009.
1 June 7, 2006M. Woods, SLAC Collimator design, wakefields (T-480) BPM energy spectrometer.
LCLS-II Project Overview David Schultz LCLS-II Deputy Project Director March 19, 2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
The FACET Facility at SLAC
IP Beam Instrumentation R&D and Testbeams for the ILC
Testbeam plans for LEP instrumentation
End Station A Test Beam ESTB Design, Performance, Infrastructure, Status Mauro Pivi, SLAC on behalf of the ESTB team: C. Hast, T. Beukers T. Fieguth, R.
SLAC ESTB End Station A Test Beam Other Test Beams
Beam Optics Set-Up at SLAC End Station A
A summary of world-wide test beam facilities
LAL meeting on e+ studies, Oct. 2010
End Station Test Beam (ESTB) at SLAC
ILC Beam Tests in End Station A
FACET Accelerator Overview
LINX LINear collider IR X-ing facility at SLAC Snowmass 2001 July 11 Andrei Seryi, SLAC for NLC collaboration.
FACET Accelerator Overview
Laser Und XFEL.EU Experiment
Presentation transcript:

SABER, “maybe” a new facility in the South Arc (South Arc Beam Experimental Region) End Station A (ESA) in 2007 ILC Test Beams in 2008 Test Beams beyond 2008 in the LCLS Area Test Beam Capabilities at SLAC Carsten Hast Stanford Linear Accelerator Center LCWS 2007 DESY Hamburg June 1 st 2007

Carsten Hast, SLACTest Beam Capabilities at SLAC 2 Test Beams at SLAC

Carsten Hast, SLACTest Beam Capabilities at SLAC 3 Mainly a facility for accelerator physics (Plasma-Wakefield) Primary Electron or Positron beams with low emittance and compressed bunches Energy: 28.5 GeV with PEP-II or LCLS with bypass line Charge: 2 (3.5) x e- or e+ Spot size at IP: < 10 μm Experimental section is about 100 feet long and can be extended Infrastructure has to be developed Currently not funded

Carsten Hast, SLACTest Beam Capabilities at SLAC 4 End Station A (ESA) ESA is large (60m x 35m x 20m) 50/10 t crane Electrical power, cooling water DAQ system for beam and magnet data Experiments typically bring their DAQ

Carsten Hast, SLACTest Beam Capabilities at SLAC 5 FermiLab 60 meters Shielding for Primary Beam PPS entry Beam Line is 2m above ground Open Area for Detector Tests End Station A (ESA)

Carsten Hast, SLACTest Beam Capabilities at SLAC 6 End Station A (ESA) ParameterLINAC Repetition Rate 10 Hz Energy 28.5 GeV Bunch Charge 2.0 x Bunch Length  m Energy Spread 0.2% rms Spotsize (x,y) 100,600  m ESA has excellent momentum resolution, great timing resolution, great infrastructure primary electron beam Secondary hadrons and positrons to ESA ParameterLCLS Repetition Rate 120 Hz Energy 14.5 GeV Bunch Charge 2.0 x 10 9

Carsten Hast, SLACTest Beam Capabilities at SLAC 7 Test Beams at SLAC until end of FY 2007 ANITA (2006) T-469 Fast Focusing Cherenkov Detector ( ) ILC-MDI: BPM energy spectrometer (T-474/491) Synch Stripe energy spectrometer (T-475) Collimator design, wakefields (T-480) Bunch length diagnostics (w/ LCLS, T-487) IP BPMs/kickers—background studies (T-488) Linac BPM prototypes EMI (electro-magnetic interference) 2007 Runs dates: T-489 Measurement of induced and residual Activity, SLAC/CERN Rad. Physics Group ILC-MDI, March 7-26, Run 3 Coming up 2007: June 29 - July 8, T490 w/ LCLS primary beam July 9-25, Run 4 August, Cherenkov Test with secondary particles from LCLS beam

Carsten Hast, SLACTest Beam Capabilities at SLAC 8 PEP II will be running until end of September GeV electron beam is available for SABER and ESA with a typical rate of 10 Hz LCLS has started commissioning Availability of primary beams will be very much limited for ESA and SABER but my guess is that there will be beam time available End Station A will (most likely) run for 2 times 2 weeks for ILC related beam tests, continuing our ILC-MDI program. Open for more requests from ILC detector community. If SABER is approved it comes online next year and can deliver primary beams and secondary electrons Infrastructure has to be build Secondary hadron beam is unlikely Test Beams at SLAC until end of FY 2008 ILC (primary or secondary) test beam requests until end of 2008 can be handled in ESA

Carsten Hast, SLACTest Beam Capabilities at SLAC 9 LCLS starts full operation in 2009 (10 month/year) Uses last 1/3 of Linac Basically no primary beams available for anything else SABER If approved, some accelerator R&D in 2008 possible Difficult to predict how much beam time in 2009 A bypass line is planned to be installed in 2009 which would make SABER operation independent of LCLS Starting in 2010 up to four month/year of operation is suggested Primary e- or e+ and secondary e- or e+ (no hadrons) available for accelerator R&D and test beam requests There is currently no commitment of SLAC to run ESA at all beyond 2008 PPS System needs to be upgraded That would allow using parasitic secondary beam from LCLS all the time at 120 Hz Revival and upgrade of kicker magnets (10Hz of LCLS beam to ESA) 15GeV primary electron beam Possible extension of SABER bypass line into ESA 30GeV primary beam and secondary electrons and hadrons (10Hz) Test Beams at SLAC in LCLS Era 2009

Carsten Hast, SLACTest Beam Capabilities at SLAC 10 A SLAC study group has prepared a document to discuss the future of test beams with SLAC directorate. Has been submitted mid May. Currently we are waiting for a new PPA director to be appointed so we can discuss it. Good chances to get a 120 Hz secondary beam from the LCLS beam halo into ESA for 10 month per year starting 2009 Slim chances to “steal” 14.5 GeV primary beam pulses from LCLS either for ESA or SABER Hopefully starting 2010 SABER and ESA can get Hz beam independent of LCLS for a combined beam time of up to 4 month per year Test Beams at SLAC in LCLS Era (rather uncertain…)