Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager 757 824 1238

Slides:



Advertisements
Similar presentations
Making the System Operational
Advertisements

Distributed Data Processing
Overview of DVX 9000.
MUNIS Platform Migration Project WELCOME. Agenda Introductions Tyler Cloud Overview Munis New Features Questions.
[Insert Project Name] Detailed Design Review (DDR) [Insert Date of DDR] Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC)
Network Design and Implementation
GLAST LAT ProjectISOC CDR, 4 August 2004 Document: LAT-PR-04500Section 3.11 GLAST Large Area Telescope: Instrument Science Operations Center CDR Section.
MSIS 110: Introduction to Computers; Instructor: S. Mathiyalakan1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
DITSCAP Phase 2 - Verification Pramod Jampala Christopher Swenson.
© Copyright 2003, Binomial International Inc. Phoenix Business Continuity and Disaster Recovery Planning Software Recovery Planning Software Tools Recovery.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
November 2009 Network Disaster Recovery October 2014.
Financials – Phase II Kick-Off Meeting September 11, 2008 Brenda Bolander, State Comptroller Michael Grisser, Project Manager.
Chapter 5 IS630. Project Plan 1.Introduction 2.Project Definition Overview 3.Changes Since Project Definition Was Approved 4.Staffing Plan 5.Development.
Term 2, 2011 Week 3. CONTENTS The physical design of a network Network diagrams People who develop and support networks Developing a network Supporting.
This presentation is the property of Paradigm Information Systems It is confidential to the intended recipient for the purpose of evaluating FMS Any other.
Designing a HEP Experiment Control System, Lessons to be Learned From 10 Years Evolution and Operation of the DELPHI Experiment. André Augustinus 8 February.
WEB-BASED DEAL LOG DATABASE PROJECT REVIEW Presented to SHEPHERD VENTURES By Sylvia Szubrycht.
Jack Schmidt Fermilab NLIT  The 1 st Year  Staffing Issues  Internal Tool Audit  Problem Management  Change management  Process Improvements.
Databases and Database Management Systems
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
California State University, Northridge Certification Process Team B Carlos Guzman John Kramer Stacey LaMotte University of Phoenix.
Texas Nodal Program ERCOT Readiness Update TPTF March 31, 2008.
Consortium Meeting La Palma October ICC Status Tanya Lim 1 SPIRE Consortium Meeting La Palma, Oct. 1 – ICC Status Tanya Lim RAL.
A Guide to Oracle9i1 Database Instance startup and shutdown.
Principles of Information Systems, Sixth Edition Systems Design, Implementation, Maintenance, and Review Chapter 13.
PDS Geosciences Node Page 1 Archiving Mars Mission Data Sets with the Planetary Data System Report to MEPAG Edward A. Guinness Dept. of Earth and Planetary.
T Iteration Demo Group name [PP|I1|I2] Iteration
MOWG 2 Sept 15-16,1999 David Hancock1 KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member.
GIST 23 DWD, 27-29th Apr 2005 GGSPS development and operations Andy Smith RAL.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Swift HUG April Swift data archive Lorella Angelini HEASARC.
Module 4: Systems Development Chapter 14: Design And Implementation.
PoDAG XXI: SEEDS SEED: NSIDC Potential Interactions NSIDC DAAC should prepare an evaluation of their desired future roles in "core activities" and in mission.
GIST 19: GGSPS status Status of GGSPS development and operations Andy Smith GGSPS software project manager.
Principles of Information Systems, Sixth Edition 1 Systems Design, Implementation, Maintenance, and Review Chapter 13.
Response to TAC8 and Annual Review Recommendations John Haines Head of Target Division April 2, 2014.
PoDAG 21: Flow Diagrams 1 Data Flow Diagram(s) PoDAG asked for a data flow diagram with an indication where NSIDC was involved.  Each data stream is unique,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 12/25/20151 Flight Software Template for Instrument Critical Design Review Gary M. Heiligman.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
KEY PERSONNEL Dr. Bob Schutz, GLAS Science Team Leader Dr. Jay Zwally, ICESat Project Scientist, GLAS Team Member Mr. David Hancock, Science Software Development.
Systems Analysis & Design AUTHOR: PROFESSOR SUSAN FUSCHETTO 10/24/
LANCE Processing at the AMSR-E SIPS Presented by Kathryn Regner Information Technology and Systems Center at the University of Alabama in Huntsville Joint.
Chapter 12 The Network Development Life Cycle
COBRA® V5 Janet L. Anderson, M.S., D-ABC Forensic Toxicologist Alcohol and Drug Testing Program Technical Director.
Solar Probe Plus A NASA Mission to Touch the Sun Mission Operations Review News Elena Adams 7/16/2015.
Texas Nodal Program ERCOT Readiness Update TPTF June 23, 2008.
State of Georgia Release Management Training
MODIS SDST, STTG and SDDT MODIS Science Team Meeting (Land Discipline Breakout Session) July 13, 2004 Robert Wolfe Raytheon NASA GSFC Code 922.
TERRA UPDATE Launch Date NSIDC DAAC Launch Readiness MODIS Snow and Ice Products General Product Release Timeline.
1 SUZAKU HUG 12-13April, 2006 Suzaku archive Lorella Angelini/HEASARC.
A Service-Based SLA Model HEPIX -- CERN May 6, 2008 Tony Chan -- BNL.
2.0 PROJECT INITIATION AND PLANNING The initiating and planning are the phase where process or workflow to develop the system will identify and planning.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Chapter 7: Delivery, Installation, and Documentation Ronald J. Leach Copyright Ronald J. Leach, 1997, 2009, 2014,
1. ICD-10 UPDATE 2 Rocky Fullerton, Sr. Manager ePMO October 7, 2015.
542d Combat Sustainment Wing 2006 NCSL International Workshop & Symposium United States Air Force Metrology NextGen Calibration Automation System Presented.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
12/19/01MODIS Science Team Meeting1 MODAPS Status and Plans Edward Masuoka, Code 922 MODIS Science Data Support Team NASA’s Goddard Space Flight Center.
System Design, Implementation and Review
Managing the Project Lifecycle
Technical Area highlights and priorities
I&T&C Organization Chart
GLAST Large Area Telescope:
Managing The Scheduler
Chapter 5 IS630.
IT OPERATIONS Session 7.
Integration & Test Instrument Operations Coordination
Presentation transcript:

Science Operation Readiness Review ICESat SIPS (I-SIPS) Status N0v 30, 2001 David Hancock ICESat Science Ground System Manager

Agenda Overview Technical Architecture Diagram External Interfaces Performance and Functional Status Required/expected data flows Management Facilities Documentation I-SIPS Operations Overview Hardware and Software Status Operations Staffing I-SIPS Operations Plans and Procedures Discrepancy Status Work Remaining Summary

Overview –I-SIPS Processing Requirements Slide 5 and 6 of science data processing workshop p.pdf

Product descriptions Level 1A – calibrated Altimeter, Atmosphere, and instrument pointing data Level 1 B – Full rate basic Geophysical Altimeter and Atmosphere data Level 2- Surface Elevation and Cloud/Aersol data Level 3 – Selected parameters compressed for global coverage

Operational Load With no reprocessing 218 granules produced per day with reprocessing average 654 granules Total files handled with no reprocessing is 1018 per day with reprocessing average of 2,810 files per day

ISIPS ARCHITECTURAL DIAGRAM Slide 5 of john’s presentation in CA

External Interfaces Table 5.9 from Lutz ICD

Performance and Functional Status Put in V2 Test performance numbers?

Facilities John’s picture slide of bldg 22

Facilities Hardware except backup processor is in place Network connections are inplace- Upgrade due for bldg 22 to 33 connection

Documentation CDR Nov 99? slide updated to current version/date and adding security plan, QA plan, Operation Procedure if not there.

Hardware and Software Status Minimum required hardware in place Software Version 2 delivered – Minimum effort could make operational to make science team available products but would not meet requirements for distribution

Operations Staffing I-SIPS Staffing is 12 hours by 5 days Call in by pager if error detected Monitor from home Positions (Put on next slide?) –Filled Operations Leader System Admin Programmer Database Admin –Open Operator Data Tech Data QA

Training and Certification Suneel?

Operations Plans and Procedures Status Operational Status with NSIDC –IGST-6.2 all NSIDC flows tested except L0 retrieval from NSIDC Plans for reacting to science software and instrument anomalies –Redundant machine to test new deliveries –Maintenances programmer on staff Plans for reacting to DAAC/ECS anomalies –Within I-SIPS not using much ECS software –No ECS software required to deliver products to science team –Automatic system for ingest of data –Reprocessing will be automated

Discrepancy Status List DR that Susan has on I-SIPS List V3 none delivered items

Present work remaining/ work- off plans and dates Deliver V3 at 3 months before launch Focus on the critical work that must be completed V2 plus can support launch Prioritize the remaining work and provide impacts

Summary Issues –Personnel training/Staffing Concerns –EDOS Status –As of 10/17/01 I-SIPS not ready for Launch –Should have version that can support launch 2/02 –Launch ready version 4/02