1 NCSX WBS-1201-190 HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.

Slides:



Advertisements
Similar presentations
1.  Preparation of larger parts in a Clean room Class (ISO7)  Preparation of smaller parts in a “baldaquin” annex  Assembly in a clean-room Class.
Advertisements

April 23-24, 2009/ARR 1 Proposed Effort Over the Next 1-2 Years on ARIES-DB DCLL A. René Raffray, Siegfried Malang, Xueren Wang University of California,
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 Iron Shield Mounting Design Stephanie Yang.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
Magnet System Definition L. Bromberg P. Titus MIT Plasma Science and Fusion Center ARIES meeting November 4-5, 2004.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
General idea of a couple of check rod system and adjustments
1 THERMAL & MECHANICAL PRELIMINARY ANALYSIS ELM COIL ALTERNATE DESIGN Interim Review July 26-28, 2010 In-Vessel Coil System Interim Review – July 26-28,
NCSX Office of Science Project Review Cryostat, WBS171 August 15-17, 2007 NCSX Fabrication, Operations, and Maintenance Division Engineering Department.
NCSX NCSX Planar Coil "ASIPP" Presentation 1 December 8-10, 2005 Michael Kalish NCSX TF and PF Coils.
Development of the FW Mobile Tiles Concept Mohamed Sawan, Edward Marriott, Carol Aplin University of Wisconsin-Madison Lance Snead Oak Ridge National Laboratory.
Addendum to EDMS document “Instruction Manual for inserting the CMS ZDCs using the HXTC crane” In addition to the ZDC detectors in the TAN instrument.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
SQXF Shell & Yoke Assembly Procedure
Multiple Coil Lift Calculation. Purposes of the Study  To investigate the stress distribution in the MCWF and the lifting device.  To make sure mounting.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) 1.Make sure the requirements for the tooling is well defined (including.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
Proposed TF Joint Design C Neumeyer 2/26/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet been performed.
RFCC Module Design Update  automatic tuners  cavity suspension  cavity installation Steve Virostek Lawrence Berkeley National Lab MICE Collaboration.
Analyses of Bolted Joint for Shear Load with Stainless Steel Bushing and Frictionless Shim-Flange Interface Two cases of shim plates were investigated.
NCSX VACUUM VESSEL PL Goranson Comprehensive Final Design Review May 05, 2005 Vacuum Vessel Supports Heating/Cooling System NCSX.
NCSX Modular Coil Turning Fixture FDR. Background Modular Coil winding forms are cast structures which provide the foundation on which the coils are constructed.
1 Stage 3 Peer Review October 26, 2006 T. Brown. 2 Field Period Assembly (FPA) – Stage 3 1.Make sure the requirements for the tooling is well defined.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
NCSX VACUUM VESSEL PL Goranson Status Report Sept 5, 2006 Support Rod Revision NCSX.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Metrology Milestones Metrology Task Force –Vacuum vessel manufacture - P. Goranson –Mod. Coil Form manufacture - D. Williamson –Mod. Coil winding- S. Raftopoulos.
1 MC Assembly over the VV FPA Station 3 FDR Review July 17, 2007 T. Brown.
Magnets and Supports Bob Wands October 20, 2006 PPD/MD/Engineering Analysis Group Fermilab 4 th Concept Detector at Fermilab October, 2006.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
1Page # Machine Assembly WBS 700 By: James H. Chrzanowski January 24, 2001.
Cold Magnetic Shield Update
Results of Linear Stress Analyses for Modular Coils and Coil structure For 2T High Beta Currents at 0 Seconds and Initial Coil Shrinkage of in/in.
An Analysis of Shell Structure for Dead Load H.M. Fan PPPL September 16, 2005.
NCSX Field Period Assembly (FPA) Operations, Cost and Schedule, Staffing, and Metrology Utilization Mike Viola Field Period Assembly Manager NCSX FPA Peer.
Mechanical Designs of The Central Detector Jinyu Fu
F. Dahlgren -SC Project Review of NCSX, April 8-10, 2008 PF, TF, & Trim Coil Supports (WBS-15) Core Base Support Structure (WBS-17) F. Dahlgren NCSX Coil.
TVAC Trolley Design Review1 GLAST LAT Project8 September 2005 TVAC Trolley Design Status Review 8 September 2005 TVAC Trolley Design Status Review 8 September.
1 MC Assembly over the VV FPA Station 3 FDR Review July 13, 2007 T. Brown.
Twisted Racetrack Analysis Update
SC Project Review of NCSX, April 8-10, 2008 NCSX Machine Assembly E. D. Perry.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 Assembly Tooling PU Workshop on NCSX Cost & Schedule Princeton Plasma Physics Laboratory Princeton, NJ Mar 1-4, 2007 T. Brown Princeton Plasma Physics.
Proposed TF Joint Design Concept #1 C Neumeyer 3/23/9 Notes: 1)Several concepts included are based on ideas developed by R Woolley 2)No analysis has yet.
NCSX VACUUM VESSEL PL Goranson Final Design Review November 17, 2005 Man Access Port /Lateral Supports NCSX.
Field Period Assembly Wayne Reiersen SC Project Review PPPL May 2006.
Nonlinear Analyses of Modular Coils and Shell structure for Coil Cool-down and EM Loads Part 1 – Results of Shell Structure and Modular Coils H.M. Fan.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
FEM Analysis of the Stage3 Support Frame H.M. Fan March 14, 2007.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
A View of NCSX Structural System and Load Path for the Base Support Structure.
NCSX 21 March 2003 Reiersen - 1 PDR Preparations Wayne Reiersen NCSX Engineering Meeting 21 March 2003.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
SEPT 20, 2006 T. Brown, M. Cole, P. Fogarty, P. Goranson, K. Freudenberg, D. Williamson NCSX STAGE 2 COIL TO COIL ASSY.
Analysis of TF Load Paths and Vacuum Vessel Loading H. M. Fan Jan. 22, 2009.
1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue.
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
1 VV Support Fixture FPA Stage 1 PDR Review August 10, 2005 T. Brown.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
NCSX Vacuum Vessel Fabrication
ProtoDUNE – DSS Installation, Alignment and QA
On the accuracy of port assembly at Wendelstein 7-X
SNS PPU Cryomodule Thermal Shield & MLI
Presentation transcript:

1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept Identified. Vessel Handling Support Concept Identified. Hard Points and Access Identified. Preliminary Stress Analysis Complete.

2 WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Geometry Gravity Load - Hung from vessel top surface bosses and lugs to shell. - 6 point suspension(2 per period). Vertical Upward Load - reacted either by outboard lugs at NB ports or - by 6 points on lower surface (2 per period). - choice driven by convenience and magnitude of load. Radial and Lateral (toroidal) Loads. - reacted by lugs at NB ports.

3 WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

4 Top Mount Pros Permits line of sight access from outside through shell. ( installation from outside shell) Permits tension rod (small cross section). Top Mount Cons Thermal growth is all downward, not symmetric from midline. Requires additional penetration into vessel.

5 WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

6 Top Suspension Rational Difficult to achieve 6 points (minimum) on midline with clear access. Thermal growth is predictable and easy to compensate for. Midline mounts would induce large bending moments. Boss penetrations are simple and equivalent to port installations. WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Installation Concept Contin.

7 WBS HANDLING/SUPPORT UPDATE 7/23/03 STRESS ANALYSIS ASSUMPTIONS –Gravity load on 120 degree field period –Hung from two top hard points –Modeled without ports to save time –Equivalent weight with ports used in model(more flexible than real case) RESULTS –Stress in wall only 5 ksi REMAINING WORK –Model rerun with ports –Detailing mounts

8 VM Stress (Mechanica)

9 VM Stress Clevis #1 Clevis #2

10 Geometry 4 point mount to shell. –Two inboard upper hard points used for installation. –Two hard points outboard on top. 2 optional locations on bottom, outboard. WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Handling Concept

11 Top location for all 4 hard points permits lift with crane. Utilizing inboard points and all four outboard points (top/bottom) would give handling flexibility. –Lower mounts could take load off while adjusting upper mounts. –Lower mounts could be used to react vertical loads. WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Handling Concept Contin.

12 WBS HANDLING/SUPPORT UPDATE 7/23/03 Vessel Handling Concept Contin. Handling Procedure (abridged version) a. Mount vessel period to fixture using vertical ports, NB port. Install insulation, diagnostics, etc b. Manipulate coil/shell assys over vessel ends with handler and bolt up to each other. c. Install 4 vessel hangers and radial lugs at NB port to shell and align vessel. d. Install TF coils. e. Install port extensions. f. Release vessel from fixture, suspending it from shell. g. Perform field period testing, metrology. h. Transport assembly to site and mate to other period sectors. i. Remove two outboard vessel hangers.