DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and.

Slides:



Advertisements
Similar presentations
Onsala Space Observatory Present status and technical directions of the EVN Michael Lindqvist Onsala Space Observatory, Sweden Arpad.
Advertisements

BOTU Features and Applications Copyright © Siemens Schweiz AG 2007.
The Mark 5B VLBI Data System Alan Whitney Will Aldrich John Ball Kevin Dudevoir Brian Fanous Dan Smythe MIT Haystack Observatory 24 March 2006 EVN TOG.
Mark 5C VLBI Data System Alan Whitney MIT Haystack Observatory 16 June 2008 e-VLBI workshop Shanghai, China.
Ionization Profile Monitor Project Current Status of IPM Buffer Board Project 10 February 2006 Rick Kwarciany.
DBBC3 Development - Digital Base-Band Converter 3
1 Tell10 Guido Haefeli, Lausanne Electronics upgrade meeting 10.February 2011.
Ongoing e-VLBI Developments with K5 VLBI System Hiroshi Takeuchi, Tetsuro Kondo, Yasuhiro Koyama, and Moritaka Kimura Kashima Space Research Center/NICT.
VLBI Report LBA Operations & eVLBI Tasso Tzioumis ATNF May 2008.
VLBI in Africa Michael Bietenholz Hartebeesthoek Radio Observatory.
Backend electronics for radioastronomy G. Comoretto.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
DBBC Stutus Report November 2007 G. Tuccari, W. Alef, S. Buttaccio, G. Nicotra, M. Wunderlich.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
The Mark 5B VLBI Data System Alan Whitney for the Mark 5 team MIT Haystack Observatory 20 September th e-VLBI Workshop Haystack Observatory.
Nov 29, 2006Dwingeloo, EVN CBD Meeting EVN D igital B ase B and C onverter Status Report Status Report G. Tuccari.
VDIF (VLBI Data Interchange Format) as a common data format in e-VLBI era. M. Sekido (NICT) M.Kettenis(ATNF), C.Phillips(JIVE), A.Whitney(MIT/Haystack),
DBBC - EVN CDR Meeting, Bologna May 2005 DBBC Project G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di Radioastronomia CNR, Sezione di Noto - Italy M.
University of Calcutta CBM 1 ROC Design Issues Dr. Amlan Chakrabarti, Dr. Sanatan Chattopadhyay & Mr. Suman Sau.
Station Board EVLA F2F Meeting: December Dave FortEVLA F2F Meeting: 11/12 December Outline Station Board Review Station Board Status Delay.
IVS-4th General Meeting, Concepción- Chile, Jan 2006 DBBC - A Flexible Platform for VLBI Data Process G. Tuccari, S. Buttaccio, G. Nicotra - Istituto di.
Yuri Velikzhanin NuTel TV meeting, June 13 (Friday), 2003 Status of electronics for NuTel prototype.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
Possible Engineering Support for Dual Polarization and Ultra Wide Band Observation with EAVN N. Kawaguchi National Astronomical Observatory East Asia VLBI.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
DiFX Performance Testing Chris Phillips eVLBI Project Scientist 25 June 2009.
ATLU for AIDA High Rate Synchronous as well as Asynchronous 21/11/2013David Cussans, AIDA WP9.3, DESY1.
FPGA firmware of DC5 FEE. Outline List of issue Data loss issue Command error issue (DCM to FEM) Command lost issue (PC with USB connection to GANDALF)
Brent CarlsonEVLA System PDR (Correlator V2) December 4-5, Correlator.
Bart Hommels (for Matthew Wing) EUDET ext. steering board JRA3 DAQ System DAQ System Availability updates: – DIF: Detector Interface – LDA:
The Mark 5B VLBI Data System Alan Whitney MIT Haystack Observatory 10 Jan 2006 IVS General Meeting Concepion, Chile.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Pulsar Status For Peter. L2 decision crate L1L1 TRACKTRACK SVTSVT CLUSTERCLUSTER PHOTONPHOTON MUONMUON Magic Bus α CPU Technical requirement: need a FAST.
Demonstrations of RDBE-PFB Data Flow. Review the original PFB Data Flow.
A commercially available digitization system Fotiou Andreas Andreas Fotiou.
BPM stripline acquisition in CLEX Sébastien Vilalte.
G. Tuccari 1, W. Alef 2, A. Bertarini 3, S. Buttaccio 1, D. Graham 2, A. Neidhardt 4, G. Nicotra 1, A. Roy 2, M. Wunderlich 2, R. Zeitlhoefler 4 1 Istituto.
Pulsar Hardware Status Burkard Reisert (FNAL) March, 14 th 2003.
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
NEXPReS Period 3 Overview WP8 FlexBuff High-Bandwidth, High-Capacity Networked Storage Ari Mujunen Aalto University Metsähovi Radio Observatory Finland.
New ATCA compute node Design for PXD Zhen-An Liu TrigLab, IHEP Beijing Feb , 6th International Workshop on DEPFET Detectors and Applications.
Broadband Interfacing eMerlin-JIVE (1-10Gbps) Onsala-Jodrell Bank (
TOW May 2011 DBBC2 G. Tuccari – INAF Istituto di Radioastronomia.
NEXPReS Period 3 Overview The hunt for 4Gbps fringes Or, may the fringe be with you Or, nothing like living on the edge Arpad Szomoru, JIVE.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
DHH Status Igor Konorov TUM, Physics Department, E18 PXD DAQ workshop Münzenberg –June 9-10, 2011.
ROD Activities at Dresden Andreas Glatte, Andreas Meyer, Andy Kielburg-Jeka, Arno Straessner LAr Electronics Upgrade Meeting – LAr Week September 2009.
TBD The Matrix Card Status and Plans Dr. John Jones Princeton University
1 Date Uniboard Application for Korean VLBI Network (KVN) Jae-Hwan Yeom, MiYoung Jung & Bong Won Sohn.
Title FABRIC Progress - Mark, Huib etc. T. Charles Yun Project Manager EXPReS/JIVE.
Status Report of the PC-Based PXD-DAQ Option Takeo Higuchi (KEK) 1Sep.25,2010PXD-DAQ Workshop.
What is FABRIC? Future Arrays of Broadband Radio-telescopes on Internet Computing Huib Jan van Langevelde, JIVE Dwingeloo.
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
FP7 Uniboard project Digital Receiver G. Comoretto, A. Russo, G. Tuccari, A Baudry, P. Camino, B. Quertier Dwingeloo, February 27, 2009.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.
E. Hazen -- HCAL Upgrade Workshop1 MicroTCA Common Platform For CMS Working Group E. Hazen - Boston University for the CMS Collaboration.
High Speed Optical Interconnect Project May08-06
AMC13 Project Status E. Hazen - Boston University
Initial check-out of Pulsar prototypes
Mark 5 / VLBA Correlator Topics
SA1: Production e-VLBI service
Multifunctional Digital Backend (MDBE) for "Quasar" VLBI-network
High Bandwidth Interface for Cameras and Digital Cinema
GBT-FPGA Interface Carson Teale.
Progress on EXPreS at JBO Ralph Spencer
Project of Direct Sampling Digital Backend for Quasar VLBI-network
DBBC Stutus Report November 2007
Title or label as appropriate Operational and Performance Capabilities
Presentation transcript:

DBBC Status Report 1) Summary of firmware development and results of tests and Haystack comparison 2) Status of FiLa 10 GE board (needed for Mark 5C and e-VLBI) 3) Status of DBBC company "HAT-Lab"

All the hardware completed Firmware Team (IRA, MPI, Arcetri) New firmware for Core2 in down conversion configuration: - xx.99 problem solved - fringe amplitude with still dependence on the IF amplitude levels: improvement under development by a dedicated working team New firmware for Core2 in fixed tuned wide band: - Fully developed - Successful compatibility test with Haystack DBE on May 5

Autocorrelation DBBC Autocorrelation DBE

Cross-Correlation DBBC/DBE MHz 16x32 MHz ch

FILA 10 G Ethernet Interface Hardware complete (2 XFP + 2 SFP) Firmware Working Team (IRA, MPI, Metsahovi, SHAO) Firmaware on prototype now running in one board 2 x Gbps bidirectional (with std VLBI clock) 2 x Gbps bidirectional (with std VLBI clock) protocol UDP/IP with VDIF Output on 2 optical fibers and 2 copper (1 Gbps ea.) Developed additional interface Optical-CX4 (copper ) for MK5C

HAT-LAB Spin-off company approved by INAF on April 30 Agreement between HAT-Lab / INAF / MPI Bonn Additional bureaucracy still running, the spin-off not still operational until completion of all the procedures Requests can be addressed also now to the contact: Dr. Danilo Arena, Orders already pending for AuScope Production capability is about 4 systems / 4 months EVN production scheduling required

General DBBC very flexible in number of IF input and output Input and output can be copper and/or optical fibers Examples: 2 IF (512 MHz ea.) 8 BBC Tot K€ 2 IF (1024 MHz ea.) 8 BBC Tot K€ FILA10G 5.5 K€ 1 XFP (optical) 0.8 K€ 4 IF (512 MHz ea.) 16 BBC Tot K€ 2 IF (1024 MHz ea.) 16 BBC Tot K€ FILA10G 5.5 K€ 1 XFP (optical) 0.8 K€

DBBC VSI 1 -> 8 10G 1 -> 8 GENERIC DBBC SYSTEM FS PC or terminal 1 0G 1 -> MHz 1PPS 1 –> 32 tunable bbcs (U&L) 1 –> 8 polyphase (15 U/L ea.) to MK5B/+ to MK5C

DBBC Rx Coax Bwd 512/1024 MHz 2 VSI 1 10G 1 VLBA(analog)-like System FS PC or terminal 10 MHz 1PPS 8 tunable bbcs (U&L) to MK5B/+ to MK5C Base 9.5 K€ 2 CoMo4.2 K€ 2 ADB14.4 K€ 2 Core29.0 K€ Tot K€ Base 9.5 K€ 2 CoMo4.2 K€ 2 ADB28.0 K€ 2 Core29.0 K€ Tot K€ FILA10G5.5 K€ 1 XFP (optical)0.8 K€

DBBC Rx Coax Bwd 512/1024 MHz 4/2 VSI 1 10G 1 GEO-like System FS PC or terminal 10 MHz 1PPS 16 tunable bbcs (U&L) to MK5B/+ to MK5C Base 9.5 K€ 4 CoMo8.4 K€ 4ADB18.8 K€ 4 Core K€ Tot K€ Base 9.5 K€ 2 CoMo4.2 K€ 2ADB28.8 K€ 4 Core K€ Tot K€ FILA10G5.5 K€ 1 XFP (optical)0.8 K€

DBBC Rx Coax Bwd 512/1024 MHz 8/4 VSI 4 10G 2 FS PC or terminal 10 MHz 1PPS 1 –> 8 polyphase (15 U/L ea.) to MK5B/+ to MK5C VLBI2010 GEO-like System