GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel

Slides:



Advertisements
Similar presentations
Mostly by Gwyn Williams and the JLab Team, Presented by D. Douglas Working Group 4 Diagnostics & Synchronization Requirements Where we are and what needs.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
Operations and Availability GG3. Key decisions Summary of Key Decisions for the Baseline Design The linac will have two parallel tunnels so that the support.
Nick Walker – GDE meeting Frascati Discussion and Approval of the BCD Nick Walker ILC-GDE Frascati –
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Nick Walker KEK-DESY meeting 7 th March 2005.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
SLAC ILC Accelerator: Luminosity Production Peter Tenenbaum HEP Program Review June 15, 2005.
BDSIM simulations/results: Synchrotron Radiation and Muons Motivation and History Tracking results Synchrotron Radiation Tracking of Halo Muons News from.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
1 Q3 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions.
Summary of AWG4: Beam Dynamics A. Latina (CERN), N. Solyak (FNAL) LCWS13 – Nov 11-15, 2013 – The University of Tokyo, Japan.
Gek 16/6/041 ITRP Comments on Question 19 GEK 9/06/04 19) For the X-band (warm) technology, detail the status of the tests of the full rf delivery system.
UK/EU Plans for ATF2 G.A. Blair ATF2-IN2P3-KEK kick-0ff meeting, Annecy, 8 th October 2006 Overview EUROTeV UK.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Introduction to availability modelling in ELMAS Arto Niemi.
Summary of WG1 K. Kubo, D. Schulte, P. Tenenbaum.
Discussion for Keep Alive Source /Auxiliary Positron Source KURIKI Masao Hiroshima U. /KEK 10/25/2011 ILC Technical Baseline Review, 2011, DESY 1.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Date Event Global Design Effort 1 ILC UPDATE Vancouver to Valencia Ewan Paterson Personal Report to SiD Collaboration Oct 27, 2006.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Global Design Effort 1 Possible Minimum Machine Studies of Central Region for 2009 Reference, ILC Minimum Machine Study Proposal V1, January 2009 ILC-EDMS.
1 Tunnel implementations (laser straight) Central Injector complex.
ILC Beam Delivery System / MDI Issues for LCC-phase (~
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
1 Availability and Controls Tom Himel SLAC Controls GG meeting January 20, 2006.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Status Report on ILC Project in Japan Seiichi SHIMASAKI Director, Office for Particle and Nuclear Research Promotion June 19, 2015.
BDS Andrei Seryi, Deepa Angal-Kalinin, Emmannual Tsesmelis, Rogelio Tomas, Andrea Latina, Daniel Schulte Detectors Civil engineering.
CLIC Workshop, CERN 1 CLIC/ILC Collaboration Report: Marc Ross (Fermilab); for Nick Walker, Akira Yamamoto Project Managers International Linear.
Nick Walker AD&I WebEx Meeting TeV Upgrade Study AD&I WebEx Meeting Nick Walker 1 Brief summary of ALCPG’11 discussions.
1 Update on Q2 Main linac starting gradient, upgrade gradient, and upgrade path Results of WG5 discussions after feedback from plenary on Tuesday New Option.
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
Introduction and Charge Barry Barish GDE Meeting Frascati 7-Dec-05.
CLIC Energy Stages D. Schulte1 D. Schulte for the CLIC team.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
LUCX FACILITY INTRODUCTION : PRESENT STATUS AND FUTURE PLANS A. Aryshev On behalf of QB group and THz collaboration Mini-workshop for advanced THz and.
Low Emittance Generation and Preservation K. Yokoya, D. Schulte.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
Introduction D. Schulte for K. Kubo and P. Tenenbaum.
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
WebEx meeting November 17, 2009 ILC Damping Ring Working Group on Electron Cloud LC e- cloud Working Group November 17, 2009.
1 Positron Source AD & I Report Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
15-August-2005Peter Tenenbaum for WG1 Convenors 1 Low Emittance Transport and Beam Dynamics (WG1) Snowmass Meeting “I hear the roar of the big machine,
WG1: Overall Design personal highlights report by Nick Walker First project meeting 2/12/2004 conveners: Kiyoshi Kubo (KEK) Tor Raubenheimer (SLAC)
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
ILC - Upgrades Nick Walker – 100th meeting
Staging in the TDR.
M.Jonker CTC MPO-WG status
What Should We Do?.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
Accelerator Layout and Parameters
Advanced Research Electron Accelerator Laboratory
Commissioning, Operations, and Reliability Status
Barry Barish Paris ICHEP 24-July-10
High Level Physics Applications for LCLS Commissioning
Instrumentation, Controls and MPS
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

GG3 Operations & Reliability (Availability) Eckhard Elsen Tom Himel Nubuhiro Terunuma

Goals and Questions to be Addressed Goals and Plans of GG3 GG3 will cover operations issues including attaining a high availability, special needs for commissioning, and the machine and personnel protection systems. The spotlight will be on ways these requirements effect major machine design decisions. The output of the group should be a list of how operations is effected by some of the design choices and a list of features needed to attain an ILC that will efficiently integrate luminosity. In cases where we cannot answer the questions, we should describe the work needed to attain the answer and find someone to do that work. Picked up from the Snowmass 2005 Web

GG3 Operations & Reliability (1st week) Tuesday (8/16): Availability & Recovery 10 ~ 15 persons (~3 Asia) 16: :15 Benchmarking Availability code, S Schaetzel 16: :55 Availability simulations, T Himel 16: :30 Sources & Tunnels, Discussion --> Postponed to 2nd week Wednesday (8/17): ILC Commissioning minutes 10 ~ 20 persons (~5 Asia) 16: :30 ILC commissioning from a HERA perspective, F Willeke 16: :45 ILC commissioning Schedule, J Sheppard 16: :55 ILC commissioning ideas from the TESLA TDR, K Floettmann 16: :30 Requirements, Discussion Thursday(8/18): Protection Systems --> Postponed to 2nd week Schedule1

GG3 Operations & Reliability (2nd week) N.Terunuma did not stayed on 2nd week. Tuesday (8/16): Availability & Recovery Wednesday (8/17): ILC Commissioning minutes Tuesday(8/23): Protection Systems 16: :35 Fast MPS for ILC, P Tenenbaum 16: :55 Dump layout, Discussion 16: :20 Requirements for MPS & PPS, Discussion 17: :30 Other discussion and our assigned questions Wednesday(8/24): Pros/Cons and planning 16: :55 Generate lists of pros/cons for all questions involving GG3 16: :30 Make plans for future work Schedule2

Availability (Simulation Study) Benchmarking Availability Code with HERA, S.Schaetzel well reproduced failure numbers indicate that the failures are consistently generated in the program, i.e. a consistency test of the code Availability Simulations for ILC, T.Himel Key assumptions: MTBFs and MTTR Mean Time Between Failures Mean Time To Recovery Undulator requires availability of electron beam. two tunnel system achieves 78%, a single tunnel 64% availability. MTBF of several components have to be increased by factors up to 20 to yield an 85% uptime. Picked up from Notes by Eckhard Elsen; 8/18, Picked up from Notes by Eckhard Elsen; 8/18, Availability

Full list of Components

One vs Two Tunnels (cont.) Reliability studies favour 2 tunnel solution (recommendation from WG2/GG3 based on these studies) Nick Walker; 8/26, Status of the ILC Accelerator Design

People generally agreed with the above notes on the 3 talks. The control system must be able to record synchronized data of many time scales from many systems to allow fault analysis Need naming and numbering conventions that are followed. It would be nice to have DR not with linac to give more commissioning time of the DR while the linac is under construction. The effect of 1 vs 2 tunnel and DR location on phased commissioning are important and need further work in week 2. Tom Himel; 8/18, Tom Himel; 8/18, Notes from Commissioning Session of GG3 Commissioning Discussion -1/2-

Commissioning Discussion -2/2- The method of energy upgrade will effect commissioning. Needs further work in week 2 It would be nice to have a keep-alive type e+ source to commissioning the e+ system (in addition to the e- source) Diagnostics should function at 1% beam intensity for commissioning and MPS recovery. It is OK if wire scanners are replaced with profile monitors for this. An automated alignment system that runs on tracks and automatically surveys component positions would be very useful Tom Himel; 8/18, Tom Himel; 8/18, Notes from Commissioning Session of GG3

Running out of time…. Main accelerator beam dynamics (WG1) Bunch Compression (WG1) –Recommendation: 2 stage preferred (6mm→150  m or 9mm → 300  m) Instrumentation (GG2) –BPMs, wire scanners (laser-wire), MPS issues, etc. Machine Protection System (GG3+GG2+WG1) –Very high risk (US LC options study) Operations, reliability, commissioning (GG3) –Major issue for complex machine Cost & Engineering (GG4) –Cost is everything! Much much more…. An incredible amount of work has been done/presented at this workshop! Nick Walker; 8/26, Status of the ILC Accelerator Design

Eckhard Elsen is preparing a write-up of GG3 - a draft should soon be available. More Details See… am/accelerator/GG3