SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011.

Slides:



Advertisements
Similar presentations
APT progress and resource discussion HS; 9 th March 2012.
Advertisements

SLAC Accelerator Research and Introduction to SAREC Tor Raubenheimer FACET Users Meeting August 29 th - 30 th, 2011.
Accelerator Research at SLAC for Future HEP Programs Tor Raubenheimer SLUO Annual Meeting September 18, 2008.
February 19, 2008 FACET Review 1 Lab Overview and Future Onsite Facilities Persis S. Drell DirectorSLAC.
This is the last message in this gathering of North American PI’s with an interest in the INFN hosted SuperB project. I will try to deal with issues on.
PPA Budget Roll-Out Meeting October 22, 2008 Page 1 FY2009 Budget Roll-Out Steve Kahn PPA Director.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
A Possible Strategy Towards a Future Lepton Collider Tor Raubenheimer SLUO Annual Meeting September 17, 2009.
View from the NSF: Later Years J. Whitmore (EPP-PNA) M. Pripstein (LHC) M. Goldberg, J. Reidy (EPP) LEPP – CLEO CESR Symposium at Cornell, May 31, 2008.
Future Planning for SLAC Persis S. Drell. December 5, 2003SLAC Scenarios2 Scenarios Study 2003: Process  Started early in 2003  Inclusive of SLAC faculty,
SLAC Accelerator Department The PEP-II Accelerator John T. Seeman Assistant Director of the Technical Division Head of the Accelerator Department SLUO.
July 23, 2008PPA All-HandsPage 1 PPA All-Hands: Debrief from the SLAC Program Review Steven M. Kahn Associate Laboratory Director and Director of Particle.
Budget Briefing with OHEP Staff: March 3, 2009 Page 1 SLAC HEP Budget Meeting Summary Discussion Charts S. M. Kahn, D. B. MacFarlane, R. Alva SLAC Rev.
Performance Evaluations: PPA InterpretationsPage 1 Interpretations on Performance Evaluation Process D. MacFarlane June 4 th, 2009.
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Working Group 3 Summary M. Sullivan / Y. Funakoshi.
Particle accelerator and Advanced accelerator technologies Advanced Instrumentation and Detector technologies Advanced Light Source Application of Accelerator.
1 Albrecht Wagner, Snowmass 0805 Albrecht Wagner DESY and Hamburg University Challenges for Realising the ILC.
AS Diagnostic Collaboration Mark Boland
Accelerator R&D status in cooperation with CERN and KEK 1.BSM, BHM (T. Mitsuhashi) 2. Crab Cavity (Y. Morita) 3. X-band Acc. Structure (T. Higo) 10 th.
CLIC ACAS Collaboration CERN, 12 April 2011 Mark Boland Principal Scientist Accelerator Physics Australian Synchrotron ACAS Deputy Director.
Future Accelerators at the High Energy Frontier
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Introduction to FACET & Test Facilities and charge to SAREC committee Vitaly Yakimenko June 25, 2013.
R&D, Collaborations and Closeout Fulvia Pilat MEIC Collaboration Meeting March
“Linear collider studies: This heading includes the total funding for CTF3, the CLIC study and the CLIC/ILC collaboration as well as the CERN’s participation.
Tor Raubenheimer CLIC and Other Options for Multi-TeV Lepton Physics Tor Raubenheimer Accelerator Research Division Head, SLAC P5 Meeting Fermilab February.
ARD All-Hands Tor Raubenheimer November 22 nd, 2010.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
January 25, 2002David Finley to FARDOG using Harry Carter’s Slides Slide 1 Update to FARDOG: Technical Division Xband Activities Fermilab NLC Activities.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Activities and news Last meeting: 2015 CERN budget allocations as expected, now distributed on accounts Annual report done, and MTP (Medium Term Plan)
SLAC Accelerator Development Program: X-Band Applications Chris Adolphsen OHEP Accelerator Development Review January 24-26, 2011.
Office of Science U.S. Department of Energy 1 ILC R&D Program Dr. David Sutter, Senior Program Manager Office of High Energy Physics Office of Science.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
Leveraging the SLAC Expertise Outlook and Strategy Tor Raubenheimer May 4, 2011.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
Muon Collider R&D Plans & New Initiative 1.Introduction 2.Muon Collider Schematic 3.Conceptual Breakthrough 4.Ongoing R&D 5.Muon Collider Task Force 6.Muon.
FNAL efforts on LHC Crab Cavity R&D (Proposals for R&D sub-tasks, resources and schedule) Nikolay Solyak.
Department of Energy Office of Science  FY 2007 Request for Office of Science is 14% above FY 2006 Appropriation  FY 2007 Request for HEP is 8% above.
SLAC Accelerator Development Program: X-Band RF Power Sources Michael V. Fazio OHEP Accelerator Development Review January 24-26, 2011.
B Factory D&D Review: March 23, 2009 Page 1 Overview of re-use requests and related issues D. MacFarlane Deputy Director, PPA.
Eric Prebys LARP Program Director January 14, 2009.
CLIC project 2012 The Conceptual Design Report for CLIC completed – presented in SPC, ECFA and numerous meetings and conferences, also providing basis.
SLAC and ILC Jonathan Dorfan, Director LCFOA, SLAC May 1, 2006 Particle & Particle Astrophysics.
DESY. Status and Perspectives in Particle Physics Albrecht Wagner Chair of the DESY Directorate.
Office of Science January 28, 2008J.Blazey / SiD Workshop / SLAC1 The View from DOE Moving ForwardMoving Forward HEPAPHEPAP FY08 “in review”FY08 “in review”
Summary of XFEL uses for CALIFES Erik Adli (University of Oslo, Norway)
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
SLAC Accelerator Research Program Tor Raubenheimer SLUO Meeting, July 17, 2009.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ART and the SLAC program Nan Phinney SLAC. DOE/NSF ART Program Review April 29/30, 2009 Page 2 Linear Collider R&D SLAC has been working towards a Linear.
CPM 2012, Fermilab D. MacFarlane & N. Holtkamp The Snowmass process and SLAC plans for HEP.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
Present and Future Program for Accelerator Research at SLAC
CALIFES A proposed electron beam test facility at CERN
LHC Science Goals & Objectives
LCC L. Evans, Santander, 2nd June 2016
CLIC Klystron based. Updates 2017.
The Accelerator Directorate The Organization, Priorities and Accelerator R&D April 12, 2011 Norbert Holtkamp.
Yasuhiro Okada, Executive Director, KEK
LINAC OPS Budget Review
Accelerator R&D Results from the B-factory
Closing Remarks May 5, 2011 Norbert Holtkamp.
The Laboratori Nazionali di Frascati of the
Presentation transcript:

SLAC Accelerator Development Program Tor Raubenheimer OHEP Accelerator Development Review January 24-26, 2011

SLAC Accelerator Development SLAC GAD program supports developing accelerator concepts before project funding is available –Accelerator design: FACET, End Station Test Beam, Super-B, … –LHC acc. research: LLRF, e-cloud feedback, crab cavity, … –X-band rf development: power sources, CLIC collaboration, … Funding of roughly 4M$ per year –Excellent program with quantifiable results Highly leveraged effort attracting additional funding –FACET and ESTB became OHEP funded projects –Many SLAC LHC GAD proposals now funded by LARP –Substantial SLAC LDRD and WFO funding –Attracting many collaborators ~70 papers over the last two years SLAC Accelerator Development Program Page 2

Ongoing SLAC GAD Programs Reports on main ongoing programs during GAD review: –LHC accelerator research Tom Markiewicz –Super-B accelerator design Michael Sullivan –X-band power source development Michael Fazio –X-band applications Chris Adolphsen –High performance rf modeling Arno Candel Future plans –Transitions are happening in LHC and Super-B programs  have reduced FY11 budgets while developing future plans –X-band rf technology program is increased to commercialize components and complete additional testing beamline –Developing separate more expansive X-band rf technology development proposal in support of linear colliders and FELs SLAC Accelerator Development Program Page 3

Other SLAC GAD Programs End Station Test Beam project –Funded in FY11 from Detector R&D B&R: 1.6M$ construction plus 0.4M$/year operation FACET project –Funded in FY10 from ARRA and AIP: ~20M$ construction plus 6M$/year operation from Accelerator Science B&R CLIC R&D –R&D largely being supported with CERN funds in FY11 Project-X R&D –R&D directly supported by direct Fermilab funding in FY11 Feedback and LLRF R&D –Ongoing support of 0.5 FTE to consider next generation technology SLAC Accelerator Development Program Page 4

Spending for SLAC GAD Program FY08FY09FY10FY11 Notes GAD Funding11,2324,0523,3333,538 LHC Accelerator Research1, *A INFN Super-B design *B X-band Klystron Development ,806 *C X-band rf technology ,022 *D High Performance rf modeling End Station Test Beam design *E FACET design *F CLIC R&D *G Project-X collaboration *H Feedback and LLRF program Spending Totals9,6464,8884,2863,544 SLAC Accelerator Development Program Page 5 FY08 data not shown due to transition after December 2007 Omnibus Bill *A LHC funding in FY11 is primarily supporting students *B Additional support for Super-B design from LDRD funds in FY09-FY10; additional funding in FY11 possible from INFN and/or KEK. *C Klystron funding includes construction of an XL-4 and 1500k$ for commercial XL-4’s in FY11 *D Additional support for X-band program (rf gun) from LDRD funds and WFO from LLNL *E End Station Test Beam construction and operation are funded separately in FY11 *F FACET was funded by ARRA and OHEP AIP funds in FY10 and FY11 *G CLIC efforts supported through WFO funding from CERN in FY11 *H Project-X R&D is funded directly by Fermilab in part of FY10 and all of FY11

LHC Accelerator Research Future SLAC has contributed many projects to LHC and LARP –Presently 5 main programs: Present program is largely funded by LARP SLAC may contribute to EU program on High Luminosity Large Hadron Collider Design Study (HL-LHC-DS) –Focus on: storage ring nonlinear dynamics and collective effects crab cavity design –Would maintain core competency in storage ring design and rf design –Uncertainty due to Super-B program and crab cavity specifications SLAC Accelerator Development Program Page 6

Super B-factory Future SLAC contributed strongly to INFN B-factory design INFN Super-B project was approved by the Italian gov. However, OHEP had decided not to support the INFN project –Funds are available to transfer PEP-II hardware to INFN –Further studies or development could be supported by INFN –Decision may be revisited once INFN project team is formed OHEP will support the Super-KEKB project –Opportunities for collaboration with KEK Super-B program at SLAC is on hold while we decide on a path forward with either KEK or INFN –Project funding might begin in FY13 –Expect minimal GAD funding in FY11 but possible restart in FY12 SLAC Accelerator Development Program Page 7

X-band RF Technology Development SLAC pioneered the X-band rf technology in 1990’s & 2000’s –Option for high gradient, compact linacs –High rf frequency and field gradients useful for beam manipulation Long-term goal  provide an option for a linear collider –Collaborating with CERN on staged approach to CLIC Short-term goal  wider use of technology –Near-term applications will facilitate technology adoption Biggest obstacle to adoption is lack of vendors –Working with users & vendors to commercialize klystrons & structures X-band rf technology GAD program bridges ‘valley of death’ –Develop and commercialize the best components from the existing technology suite and results from the US High Gradient Collaboration SLAC Accelerator Development Program Page 8

SLAC Accelerator Directorate SLAC Accelerator Development Program Page 9 GAD activities are in ARD and AED managed by Norbert Holtkamp

Summary SLAC GAD program was has been focused since FY09 –Aimed at near-term development (5-10 years) and proto-projects –Many design efforts have become funded projects –Developing and commercializing X-band rf technology SLAC GAD program has been very successful –Highly leveraged effort attracting additional funding and collaborators –Developed a number of proto-projects until funded –Produced ~70 papers in last two years Program is focused on X-band rf in FY11 while LHC and Super-B plans are developed –Commercialize rf power source and work with collaborators to establish technology base SLAC Accelerator Development Program Page 10