As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever.

Slides:



Advertisements
Similar presentations
First pass study 3 scenarios of possible locations of PSA storage cabinets in the CUORE hut Prepared for
Advertisements

Mr C Johnston ICT Teacher
Innovative New Technologies in Building & Construction.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
TMA-65 Workup Robin Lafever 30 April Detector geometry.
ASPHALT & CONCRETE FOR INDOOR FACILITIES Presented by Tom DeRosa.
October 3, 2006 PARAPET TERMINALS 1 This slide series addresses post spacing and barrier terminal issues. Bright coloration of the following slides is.
The Home of the Future By: Kevin Myers Exterior Solar Panels
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
7 Set of Floor Plans Primary Considerations
Primary Residential Design Considerations
Site Plans.
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
Superstructure Replacement Substructure Repair Rehabilitation of I-95 Bridges 11 Bridges Along I-95 Corridor
Construction and Installation of the CLIC Experimental Area
CUORE Clean Room Robin Lafever LBNL LNGS 9/18/2015Robin Lafever LBNL, LNGS1.
TGC Big wheel Sector assembly plan Tatsuo Kawamoto ATLAS workshop 2005.
DesignWorks Berkeley Lamp LightFair Exhibit April 10, 2001 Display Booth workup Requirement, goals and constraints for LightFair 2001 The essential requirements,
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Door seal test set-up concepts 10/10/2015Robin Lafever LBNL1 Generic Door seal concepts for personnel access and feed-through applications in the CUORE.
1 What is Precast Concrete? Precast concrete consists of a mixture of cement, water, aggregates and admixtures. This mixture is cast into a specific shape.
Outstanding Issues on Infrastructure and Development Fraser Duncan SNOLAB/Queen’s University 4 th SNOLAB Workshop 15 August 2005.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
11/30/20151Robin Lafever The existing 300 K Flange This is certainly an older version but is useful to illustrate The proposed modifications.
Robin Lafever For Russell wilcox Fiber Synch System Basic Box Fit-up 25mm and 50mm deep boxes installed in 17” chassis 12/1/20151Robin Lafever LBNL.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
Typical PSA cabinet used in these layouts is based on a Type A, Series 400 Stainless Steel unit from Terra Universal. Catalog cut is shown below. CAD Models.
Chapter 22 Introduction to Elevations. 2 Links for Chapter 22 Elevation Basics Surface Materials Related Web Sites.
Orthographic Drawings
A 128 fiber Slit-Plate assembly, Kinematic mount
Condition Testing. Condition testing is a test case design method that exercises the logical conditions contained in a program module. A simple condition.
DesignWorks Berkeley Lamp LightFair Exhibit April 2, 2001 Display Booth workup The Basic Floorplan The essential features of the design are:  Two different.
The Report Menu Form Selecting and running reports.
Greenfaulds High School
Planometric Views.
Physics 2170 – Spring Quantum tunneling:  -decay Exam 2 is done. Please check to make sure I added your.
WFIRST Large-cell structure concept design Preview Work in progress 3/4/2016Robin Lafever1.
Multilayer Microfluidics ENMA490 Fall 2003 Brought to you by: S. Beatty, C. Brooks, S. Dean, M. Hanna, D. Janiak, C. Kung, J. Ni, B. Sadowski, A. Samuel,
PSA Layout studies-2 6/12/2016Robin Lafever LBNL1 In mid April 2008, a series of studies was conducted to attempt to accommodate the desire to place the.
Fiber Cable/Spectrograph Interface: The Slit-Plate Slit-Plate models are coming together. Who will fab and assemble the parts, and how, will be integral.
BIM in Structural Design October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Floor Plans Floor plans are the central or core drawings of any set of CD’s. They not only contain a tremendous amount of information for consultants and.
Diffusion ‏ This animation illustrates the process of diffusion in which particles move from a region of higher concentration to a region of lower concentration.
Spacecraft Mockups Applied to SNAP M-21 Baseline Mockup.
3D Model in Autodesk.
Experimental Hall in Mountain Regions
Upcoming Activities Fun Fact Click here to view the live WEBCAM
Condition Testing.
INSTALLATION SEQUENCE
THE DEVON ENERGY AUDITORIUM
Drawing & Building Names
Part 14: Lands Collides - External References.
RADON IN CANADA Your Name Here Your Title Here Your logo here
Test box for ProtoDUNE SP – Integration Test
Pressure Washing Services, Alexandria VA BY: ANNA D. NOLAND.
Soudan Installation: Fermilab
DrawING exterior elevations
VINYL SIDING / CARPENTRY SECTION EXISTING CONDITION PHOTOS
RADON IN CANADA Tina Szewczyk RRT FCSRT CAE
Minuteman Vocational Technical Regional High School Progress
Florafree is a dedicated range of products for the Food Industry
  30 A 30 B 30 C 30 D 30 E 77 TOTALS ORIGINAL COUNT CURRENT COUNT
Scaled Drawings 7.07 Execute Scaled Drawings
Scaled Drawings 7.07 Execute Scaled Drawings
Minuteman Vocational Technical Regional High School Progress
GC H SQA 2016 Sectioning Question
Groups and Periods.
Keystone Library Deliverables
SNS PPU Cryomodule Magnetic Shields
Presentation transcript:

As-built 09 April 2008 Cuore concrete support structure with jack screws in place Cuore site with elevator deck ready for installation 1 Robin Lafever CUORE Structure assembly sequence RIGHT NOW, the Cuore experimental area is under construction. Many construction details are still being designed, Including clean room and Radon mitigation strategies. Timing may well limit the options being considered for the installation of a Radon barrier and clean room modificatios.

Superimposing the CAD model illustrates how the build-up sequence (TBD) may influence the choices for an appropriate Radon barrier because of access and installation constraints Build-up sequence Support structure with major structural elements in place, including the elevator deck 2 Robin Lafever CUORE Structure assembly sequence

Build-up sequence The current clean room geometry is shown here as an ‘ideal’ layout with no interfering structure around it. Assuming a Radon barrier is applied to the outer surfaces of the clean room, this is the time to do it. However, this is not a real possibility. Therefore, we must consider methods for installing a barrier before the clean room construction. Or, modifying the clean room panels such that they ARE the Radon barrier. 3 Robin Lafever CUORE Structure assembly sequence

Build-up sequence The electronics bay currently has no requirement for either particle count or Radon exclusion, but, further restrict access to the clean room roof. 4 Robin Lafever CUORE Structure assembly sequence

Hut carpentry will probably precede clean room installation, But access to the clean room exterior is clearly restricted 5 Robin Lafever CUORE Structure assembly sequence

At this point, the only options for installing a Radon barrier will be limited to the INSIDE surfaces of the clean room. 6 Robin Lafever CUORE Structure assembly sequence