County Commission: Preliminary Design Aerial Photo GRACE Marketplace One Stop Homeless Assistance Center Phase-1.

Slides:



Advertisements
Similar presentations
Site Plan Turner, Hickey and Associates 1st Level Floor Plan Administration 6 th Grade 7 th Grade 8 th Grade Special Classrooms Teacher Lounge Multi Purpose.
Advertisements

WETASKIWIN REGIONAL AQUATICS CENTRE October 24, 2011 F.H. Collins Secondary School Replacement Whitehorse, Yukon BARR RYDER ARCHITECTS & INTERIOR DESIGNERS.
SSM St Anthony Hospital Shawnee West MacArthur Campus Expansion and Renovation Shawnee, Oklahoma Design Development February 7, 2013.
F. A. Day Middle School Newton, MA Site Plan & Entry Plaza 1 st, 2 nd & 3 rd Floor Classrooms Cafeteria Administration and Student Services Suites West.
Commercial Building Project Portfolio
SHEPHERD ELEMENTARY SCHOOL PHASE I SHEPHERD ELEMENTARY SCHOOL PHASE I SITE PLAN.
Phase Difference = Phase Difference = 0.05.
Planning & Community Development Department Villa Esperanza Services Master Plan September 29, 2014 City Council.
Transportation Center Rolling Forward Into Phase 2 October, 2008.
John F. Kennedy High School – Science Wing, Richmond, CA Progress Report POWELL & PARTNERS, ARCHITECTS WCCUSD FACILITY SUB-COMMITTEE MEETING March 12,
DCCCD Brookhaven College City Council Presentation October 16, 2007.
AF SHCR Smoky Lake, Alberta PROPOSED SITE PLAN Office Entrance Formal Entrance Primary Entrance Youth & Wheelchair Entrance.
Williamson County Expo Center: Site Plan Warmup Arena Renovated Arena Expo Hall and Space.
Parent Presentation February 3, 2015
Abacoa Property Owners Assembly Annual Meeting November 17, 2010.
INSERT IMAGE TO ILLUSTRATE THE PROJECT OVERVIEW Project Description: Include a short narrative to explain the background to the project including any information.
Drawings ACT Objective Realize the organization and intent of construction drawings 2.
Design Development Review
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
FINALIZATION OF MASTER PLAN STEGE ELEMENTARY SCHOOL PRESENTATION MAY 14, 2013 POWELL & PARTNERS, ARCHITECTS.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Bbsc 303 elaina hong team sigma voutalo cultural center helsinki, finland komonen architects photo of voutalo cultural center from a journal.
Objective 7.07: EXECUTE scaled drawings. Beginning on page 159 in Housing Decisions, define these terms.  Architectural drawings  Prints  Plan view.
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
Site Plan Site Plan Overall Plan Old School Bldg. Classroom Bldg.
BUILD READY PROGRAM. Benefits of Build Ready Drastically Reduce Construction Time Companies can build sooner on Build Ready sites Reduces the amount of.
SEDONA RED ROCK HIGH SCHOOL October 9, 2008 SCHEMATIC DESIGN – PHASE 2.
AHS+Associates Final Project Name Here Final Project Architect – Your Name Put your favorite drawing, sketch, photo, etc. of your project here.
Amendment 1 Sorority Expansion Master Plan. The University of Alabama / Sorority Expansion Master Plan 2010 Photo Before Redevelopment Began.
JUDGING IS ANONYMOUS - NO DESIGNER NAMES TO BE DISCLOSED Please insert Category.
Faculty Assembly Area Student Assembly Area Central Texas College Graduation May 15, :00AM Stage Party Assembl y Area Bell County Expo Center 1.
New Somersworth Idlehurst Park Elementary School Presented By: Team Design Inc. Architectural and Consulting Services.
Convocation of Governments January 15, Sarabeth Kalajian, Director Libraries and Historical Resources Sarasota County Todd Bowden, Executive Director.
3:00. 2:59 2:58 2:57 2:56 2:55 2:54 2:53 2:52.
Construction + Materials IV: Construction Documents What are they? How can I do them too?
The New Leavelle McCampbell Middle School Design Development Presentation.
UNIVERSITY OF KENTUCKY ALUMNI CENTER STUDY 10 March 2015.
Drawing Title CAD Model Drawn By Mr Watson Drawing Number TW001 Site Location Land Adjacent to 66 Sidbury Street Fulham SW6 6SN Proposal Exterior - Smooth.
MONICA FRANCO. REI FLOOR PLAN Since the space was very huge, it was impossible for me to actually plan the interior space of it. Therefore I decided to.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
Central Texas College Graduation
The Plaza at Santa Monica Project PUBLIC SCOPING MEETING
Huntington Convention Center of Cleveland &
Modern Home Design in Orange County
A how-to guide for creating site mapping using the ERIP system
3d Architectural Visualization Company
Broker Material for REC Deck
Penn Medicine Chester County Hospital
Drawing & Building Names
Tacoma Narrows Airport TACOMA NARROWS AVIATION LLC GROUND LEASE
Oliva The New Home Company
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Top Fire Protection Services Ottawa available on Dubinskyconstruction
WHAT IS THAT??.
Client Requirements (review) Bubble Diagrams
Available for Lease 18,407 sq. ft. Zoned: General Commercial/Service Industrial Up to 4.1 Acres Available 1601 Hwy 395, Minden, Nevada Building.
Township Board Meeting
Following withdrawals by some marketplace insurers, more counties could have one exchange insurer in counties 225 counties Source: Kaiser Family.
Roslin Primary School.
Scaled Drawings 7.07 Execute Scaled Drawings
North Augusta High School – Phase 2A and 2B
Keystone Library Deliverables
Final Project Total 100 points possible.
FIVE PROJECT PHASES.
PRELIMINARY UNIT. PRELIMINARY UNIT UNIDAD 1 ETAPA 1/ UNIT 1 SECTION 1.
The New Leavelle McCampbell Middle School
Royal Palms Royal Palms Fire Station #25 And Prototype Concept
Residential Architecture poster design
Presentation transcript:

County Commission: Preliminary Design Aerial Photo GRACE Marketplace One Stop Homeless Assistance Center Phase-1

County Commission: Preliminary Design Site Plan GRACE Marketplace One Stop Homeless Assistance Center Phase-1

County Commission: Preliminary Design Enlarged: Site Plan GRACE Marketplace One Stop Homeless Assistance Center Phase-1

County Commission: Preliminary Design Floor Plan GRACE Marketplace One Stop Homeless Assistance Center Phase-1

County Commission: Preliminary Design Exterior Elevations GRACE Marketplace One Stop Homeless Assistance Center Phase-1

County Commission: Preliminary Design Building Section GRACE Marketplace One Stop Homeless Assistance Center Phase-1 1

County Commission: Preliminary Design Conceptual Rendering GRACE Marketplace One Stop Homeless Assistance Center Phase-1