Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier,

Slides:



Advertisements
Similar presentations
Homogeneity of Small Chambers T4, T6, T7, T8 and Gas Gain Measurements of Frascati and Roma Chambers Emmanuel Angulo (CSU Fresno) Weekly Meeting ATLAS.
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
TMA-65 Workup Robin Lafever 30 April Detector geometry.
1 Short update Itzhak Tserruya HBD meeting BNL, April 11, 2006.
sTGC for ATLAS Small Wheel upgrade
Status of the ATLAS MM project
ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
Status Update on Mechanical Prototype in Rome November 6,
General needs at CERN for special PCB’s Philippe Farthouat CERN.
1 Peter Monaghan“Hall C January 2011 Users Meeting”15 th January 2011 SHMS Wire Chamber Update RECAP from August Review: Vendor price quote 5x larger than.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
Operational prototype work at CERN Status report MM Gen. Meeting, 06/11/2013 J. Wotschack1.
CERN PH/DT 12/05/13 Jordan Degrange / Francisco Perez Gomez CERN PH/DT.
CERN PH/DT 30/01/14 Francisco Perez Gomez CERN PH/DT.
Large-size micromegas for ATLAS (MAMMA) Status and prospects RD51 mini week, 17/01/2011Joerg Wotschack (CERN)1.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
June 8-th 2004W.Baldini1 Ferrara production center Ferrara production center Production Readiness Review OverviewOfOperations P R R.
INFN-LNF / D. Orecchini – S. Tomassini – 06/24-25/2015 CLAS12 – RICH MECHANICS REVIEW SLIDE 1 RICH MODULE INTEGRATION IN CLAS_12 – LAST LAYOUT RICH MODULE.
Chamber Construction QC at CIEMAT B. de la Cruz CIEMAT (Madrid) CMS Week June 2002.
Irfu.cea.fr ATLAS-NSW SACLAY MMM WORKSHOP SIMULATIONS OF THE MM WEDGES WITH THE LAYOUT OPTION #3B of April 2013 Patrick PONSOT & Patrick GRAFFIN.
SQXF Shell & Yoke Assembly Procedure
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
MM construction organization Some thoughts MMM Saclay, 18/04/2013J. Wotschack1.
Basic concept The NSW chambers are assemblies of Micromegas monolayers, TGC’s and spacer/stiffeners. In order to simplify the assembly procedures we propose.
M. Alfonsi LNF/INFN Cagliari 5 May 2006 M1R1 mechanical requirements  Space constraint Frame and pannel Pads readout and trigger sectors Gas inlet and.
T.Schneider/LHCb Muon EDR
New results from MMSW Micromegas quadruplet 20/03/2015Michele Bianco RD51 week M. Bianco a, H. Danielsson a, J. Degrange a, R. De Oliveira a, F. Perez.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
News from the lab Large size Micromegas chambers Saclay, April Givi Sekhniaidze / Joerg Wotschack.
Production of Forward RPC Gaps CMS Forward RPC EDR (10/10/2002 – 11/10/2002) Seong Jong Hong KODEL, Korea University.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
Magnet Measurement Device for MICE F. Garnier, P-A. Giudici, F.Bergsma CERN MICE Collaboration Meeting No. 29 RAL technical drawings by O.Jamet.
Resistive ….. I.Laktineh IPN-Lyon. Motivation Calorimeters are expected to play an important role in future experiments (ILC, CLIC…) based on PFA concepts.
Lesson No. 07 Week No. 04 Lesson Name Hacksaw Frame & Blade.
Chamber construction Construction Tools Production sites Assembly Sequence (“travelers”) Manpower P. Campana LNF – LHCb Muon EDR Cern April 16 th, 2003.
MICROMEGAS CONNECTICS Electronics Boards And Readout Panels 25 JUNE 2013.
Status of RICH mechanical design at PNPI E.Vznuzdaev for PNPI group: V.Dobyrn, A.Khanzadeev, E.Kormin, V.Lebedev, N.Miftakhov, V.Polyakov, V.Samsonov,
The Inclusive (Measurement ) FVTX aka iFVTX sponsored by LANL-DR in FY ‘06-08 FPIX Chip Module/Hybrid Testcard Pixel Plane Assembly/Integration.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
MM detector construction One or several modules per sector considerations.
M. Bianco On behalf of the ATLAS Collaboration
ATLAS micromegas activities (MAMMA)
Production Readiness Review at PNPI Chamber assembling: Main production and quality control steps 30 January 2004 – G.Alkhazov 1.Input components control.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
22/04/20011Wire Chamber Working Group Status on O-ring closed Prototype Foam panels from Frascati (size: 279mm*341mm) No pad structure 4 independent gas.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
30/09/2010Rui De Oliveira1.  GEM Single mask process  Micromegas  Bulk  Classical  resistive 30/09/2010Rui De Oliveira2.
Micromegas for the ATLAS upgrade (MAMMA) Status report
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
Six modules Micromegas TPC beam test & Test bench 12/4/2012W.Wang_RD51 mini week1 D. Attié, P. Colas, M. Dixit, P. Hayman, W. Wang.
Zaragoza, 5 Julyl Construction of and experience with a 2.4 x 1 m² micromegas chambers Givi Sekhniaidze On behalf of the Micromegas community.
SiD Hcal structure & 1m² Micromegas chamber prototype CALICE 2009 – LYON – 2009, septembre 17 th.
11/02/2005M. Alfonsi - LNF1 DETECTOR CONSTRUCTION M. Alfonsi - LNF.
Patrick PONSOT for the CEA-Saclay-Irfu group: F.Bauer, P.Daniel-Thomas, E.Ferrer-Ribas, Ch.Flouzat, J.Galan, W.Gamache, A.Giganon, P-F.Giraud, P.Graffin,
Proposal for the construction procedures for the NSW chambers Harry van der Graaf, Nikhef Frascati, Nov
Chambers to be installed in ATLAS MSW on Small Wheel MBT0 on front-face of end-cap electromagnetic calorimeter.
Stave Tooling & Plans for Future Stave-building (Tim)
15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.
Section meeting PH-DT-EM2 Agenda  Short presentation (tour de table)  General information news  Future projects  Discussion  Coffee and cake PEREZ.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
Emulsion Test Beam first results Annarita Buonaura, Valeri Tioukov On behalf of Napoli emulsion group This activity was supported by AIDA2020.
Straw Individual assembling device and the straw linearity preliminary measurements L.N.Glonti
NA 62 – straw detector Content Detector Specifications Chamber design Straw design and specifications Calculations and measurements Prototyping Plans Straw.
TPC for ILC and application to Fast Neutron Imaging L. An 2, D. Attié 1, Y. Chen 2, P. Colas 1, M. Riallot 1, H. Shen 2, W. Wang 1,2, X. Wang 2, C. Zhang.
Rui De Oliveira Vienna March 2014 Industrialisation of Micromegas detector for ATLAS Muon spectrometer upgrade 1.
Update on Pavia MM mechanical prototype
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
News from Saclay F. Bauer, M. Boyer, D. Desforges, E. Ferrer-Ribas, W. Gamache, A. Giganon, P.F. Giraud, P. Graffin, S. Herlant, S. Hervé, F. Jeanneau,
Mechanical analysis of Foam and plastic honeycomb panels
Simplified Procedure Draft
Presentation transcript:

Experience with 1 x 1m 2 and 2 x 1 m 2 MM assembly CERN/PH/DT Hans Danielsson, Francisco Perez Gomez, Philippe Lenoir, Pierre-Ange Giudici, Francois Garnier, Jerome Bendotti 29-30/11/12Small wheel MM, Frascati

Content Design Material Assembly Conclusion 29-30/11/12Small wheel MM, Frascati

Principle layout 29-30/11/12Small wheel MM, Frascati Jörk Wotschack

Stiffening panel Rohacell 29-30/11/12Small wheel MM, Frascati 5.00 PCB1 PCB2 Jörk Wotschack

Experience with the 1x1m 2 Photos 29-30/11/12Small wheel MM, Frascati 2 MM of 1m x 0.5m glued to the Rohacell panel Stiffening panel

Design 2x1m 2 4 Micromegas PCBs ~2 m ~1m 29-30/11/12Small wheel MM, Frascati

Material 2x1m 2 Aluminum honeycomb Alloy cell size 9mm - density dim. 1250x2500 mm T10 mm Alloy cell size 9mm - density dim. 1250x2500 mm T15 mm Aluminum in closeouts, gas distribution and spacer between drift and MM Glass-fiber reinforced plastics (GFRP)for the skins Araldite: gluing at room temperature 29-30/11/12Small wheel MM, Frascati

Assembly of a test panel ~0.2m x 2m Uniform thickness skins (10-20  m) Calibrated spacers 29-30/11/12Small wheel MM, Frascati

29-30/11/12Small wheel MM, Frascati

Validation Laser device mounted on an optical bench It measures the distance relative to a known reference 29-30/11/12Small wheel MM, Frascati

Results (example) X Distance (mm) 29-30/11/12Small wheel MM, Frascati

Conclusion A first attempt has been made to assembly flat panels using a flat table (flatness 15  m) The first results are promising and the next step is to make the first full size 2m x 1m panels (10 mm and 15 mm).The first panel this week and the second beginning of next week. The mounting of the mesh is planned for end of next week. Next steps: Complete the assembly of a single plane Evaluate the assembly procedures and tooling Study how to make a complete “multiplet” Look at alternative procedures and towards series production 29-30/11/12Small wheel MM, Frascati

Spares (discussion) 29-30/11/12Small wheel MM, Frascati