FACILITIES MASTER PLAN FMP Review October 2015
TIME LINE 2014November 2015 February March April May October / November December Education / Facility Master Plan kick-off Review existing buildings with Maintenance & Operations Staff Survey Students, Faculty, Staff Review SWOT findings & solicit input Updated District Board CAC & President’s Cabinet – First Draft of Facilities Master Plan Facilities & Safety Committee SWOT Review & First Draft of Facilities Master Plan Review of Facilities Master Plan Open Forum Recommendation to Board DRAFT
OBJECTIVES Supporting student access to learning Balancing & supporting socialization & formal learning. Maintaining student safety Fostering environmental responsibility Highest & Best Use of Existing Facilities Building Upon your current planning documents Creating unique “places” DRAFT
San Jose City College campus edge / access ONE WAY Vehicular Access TWO WAY Vehicular Access Campus Entry Interior Vehicular Circulation Restricted Interior Vehicular Circulation Drop Off Plaza Signalized Intersection Moorpark Ave Parkmoor Ave S Bascom Ave Leigh Ave Change Access on Moorpark Ave Allow 3-WAY Leland Ave Traffic Light Allow Vehicle to exit campus directly onto Leland (North Bound) Improve Main Drop-Off Leleand Ave) Provide Science Building Provide Wellness Center Leland Ave Today FMP DRAFT
San Jose City College campus edge / access ONE WAY Vehicular Access TWO WAY Vehicular Access Campus Entry Interior Vehicular Circulation Restricted Interior Vehicular Circulation Drop Off Plaza Signalized Intersection Kingman Ave S Bascom Ave Leigh Ave Change Access on Kingman Ave Allow 4-WAY Kingman Ave Traffic Light On-Campus Road 2-way traffic (1 lane each) Multiple Access points for Parking Structure Allow loop connection East of Football field Today FMP Kingman Ave S Bascom Ave Leigh Ave DRAFT
San Jose City College parking count Kingman Ave Leigh Ave Parking Counts: Today: 1,775 Stalls 2014 Enroll. : 8,953 = 5 students / stall 2030 Enroll. : 13,699 = 7.7 students / stall FMP: 2,281 Stalls 2014 Enroll. : 8,953 = 3.4 students / stall 2030 Enroll. : 13,699 = 6 students / stall Increase = 506 Parking stalls = +28% Square Footage Today = 612,771 GSF FMP POW = 691,805 GSF = +13% FMP ALL = 808,805 GSF = +32% S Bascom Ave Leigh Ave Moorpark Ave Parkmoor Ave plates DRAFT
San Jose City College Moorpark Ave S Bascom Ave Leigh Ave SWOT Limited drop-off Restricted pedestrian circulation Limited purposeful outdoor student spaces Pedestrian Safety pedestrian access and open space T Public Transit Drop Off Plaza Activity Node Improved Pedestrian Circulation Campus Open Space Food Service (Existing and Potential) DRAFT
San Jose City College Moorpark Ave S Bascom Ave Leigh Ave Remove GE Buildings Allow for drop-off and vista into campus Ease E/W pedestrian circulation Create Campus Quad Repurpose Jaguar Gym into Student Activities Improve North / South pedestrian circulation Provide connection from parking to campus core pedestrian access and open space Drop Off Plaza Activity Node Improved Pedestrian Circulation Campus Open Space Food Service (Existing and Potential) DRAFT
San Jose City College Moorpark Ave S Bascom Ave Leigh Ave Service Perimeter Road M&O relocated to south of Kingman Maintain perimeter access to service buildings service DRAFT
San Jose City College Moorpark Ave S Bascom Ave Leigh Ave N facilities master plan Leland Ave Parkmoor Ave S T M A TH 6 X 5 C CT L SC 7 AW A AW C CT M L R S T TH SC Fine Arts Center Athletics / Wellness (Under Construction) Cosmetology / Esthetician Career Technology Multi-Disciplinary Building Library / Learning Resource Center Reprographics Science Complex Technology Center Theater Student Center X Relocate Softball Field CTE Building Maintenance & Operations / Reprographics GE / Business / Administration Cosmetology Expansion / Adaptive PE Drama / Theater Lobby Student Activities (Repurp. Jaguar Gym) Parking Structure Child Development Center Technology Center – Expansion of Current Future Building Pad X 8 Kingman Ave 3 6 Program of Work 1 DRAFT
SJCC M&O / Grounds / Reprographics Softball Field Relocation Student Activities Drama Building / Theater Renovation Adaptive PE / Esthetician Expansion CTE Building w/ Food Service GE / Business / Administration South Parking Structure / On-Campus Road: Kingman New Campus Drop Off (Moorpark) program of work: flow chart DRAFT
1. Adopt a Facilities Master Plan 2. Link Current Planning 3. Work with City / Community 4. Larger/ Multi-Story Buildings 5. Structured Parking DRAFT recommendations
D I S C U S S I O N : Q U E S T I O N S & A N S W E R S DRAFT