Fabio Formenti - Feb. 25th, 20091 LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009.

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
LHC UPS Systems and Configurations: Changes during the LS1 V. Chareyre / EN-EL LHC Beam Operation Committee 11 February 2014 EDMS No /02/2014.
11 T Dipole informal coil and assembly readiness review Long coil and fabrication tooling development status and plans September 22 nd, 2013 – F. Savary.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
TE-MPE-EP, VF, 11-Oct-2012 Update on the DQLPU type A design and general progress. TE-MPE Technical Meeting.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
LHC ACCESS SYSTEM 1Authors: P, Ninin, S. Grau & LHC access team EDMS: Access System during the LHC Injection tests P. Ninin, S. Grau - TS/CSE Workshop.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 LBDS Testing Before Operation Jan Uythoven (AB/BT) Based on the work of many people in the KSL, EC and TL sections.
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
A. Siemko and N. Catalan Lasheras Insulation vacuum and beam vacuum overpressure release – V. Parma Bus bar joints stability and protection – A. Verweij.
LHC Access System August 2006 LHC Access System – Status and Planning August 2006 Elena Manola-Poggioli Eva Sanchez-Corral TS-CSE on behalf of the LHC.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Project management.  To explain the main tasks undertaken by project managers  To introduce software project management and to describe its distinctive.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Progress report Collaboration meeting 23-SEP-2009
The Stripping Foil Test Stand in the Linac4 Transfer Line
MTF – Manufacturing and Test Folder Large Scale Deployment of MTF Sonia Mallón Amérigo Elena Manola-Poggioli on behalf of the EDMS Team, TS-CSE.
Reliability Applied to KM3NET
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
G. Carboni - Muon Meeting – Muon Meeting 12/ Agenda IntroductionGiovanni (30’) GEM and TDR AddendumWalter (20’) Update on M1 ratesAlessia.
LHC Enhanced Quench Protection System Review 24 – 26 February 2009.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
State of Georgia Release Management Training
TE-MPE-EP New DQLPU type A Production of 1300 new protection units TE-MPE-EP, VF, 23-Nov-2012.
Nikolaos TRIKOUPIS, TE-CRG-CI LS1 projects review: feedback on projects and lessons learnt 01/JUN/2015, Indico
TE/MPE activities currently planed for YETS Reiner Denz, Knud Dalherup-Petersen, Markus Zerlauth & Bruno Puccio YETS coordination meeting.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
TE-MPE-CP, RD, LHC Performance Workshop - Chamonix Feb R. Denz TE-MPE-CP on behalf of the QPS team QPS Upgrade and Re-commissioning.
Quench Detection System R. Denz TE-MPE-EP on behalf of the QPS team.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
LINAC4 COMMISSIONING 1 LESSONS LEARNT DURING MY VISIT AT LINAC4 COMMISSIONING Evangelia Vaena, 02/02/2016.
MPE activities within MP3 Arjan Verweij A. Verweij, MPE review, 2 June 2015 The questions: 1. Define the scope of work for your activity 2. Structure of.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
TE-MPE participation on the GSI-CERN Collaboration for Testing Super-FRS's Superconducting Magnets (aka FAIR project) Daniel Calcoen Acknowledgements:
B.Puccio MPE Workshop for LS1 / 22 & 23 Nov Logistics for DYPB activities Bruno PUCCIO (TE/MPE)
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Quality Assurance for LHC Gas Systems Stefan Haider / EP-TA1.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
CDR for the ESS Linac Magnets for LWUs (pulsed quadrupoles and DC correctors) Closeout May 4, 2016 J.G. Weisend II, Chairman CDR.
LMC 1 (Pre Chamonix) DN200 relief valve position DN200 relief valve position On top wherever possible. Open W bellows for MLI protection. On top wherever.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
Cold mass procurement, status and plan, QA-QC H. Prin With contribution from S. Becle, O. Housiaux, R. Principe, J.-L. Rudeiros Fernandez, F. Savary 3.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
The Large Hadron Collider The 19 th Sep 2008 incident [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] NIKHEF Seminar ( )
S TANDARDS, CERTIFICATION AND ASSESSMENT C HAPTER 23 Dr. Ahmad F. Shubita.
ELENA installation progress F. Butin / ELENA collaboration.
Main MPE Activities during YETS/EYETS/LS2 and the Provision of Resources Andrzej Siemko Andrzej Siemko TE-MPE1.
LHC Enhanced Quench Protection System Review
The HL-LHC Circuits: Global View and Open Questions
12 October 2009 RRB Plenary R.-D. Heuer
MPE main activities planned for LS2
Circuits description and requirements - Closed Session-
Disabling Rules.
TEST PLANS for HL LHC IT STRING
Review of hardware commissioning
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Fabio Formenti - Feb. 25th, LHC enhanced Quench Protection System project Review committee meeting February 24 th –26 th 2009

Fabio Formenti - Feb. 25th, Presentation outline  Upgrade motivations  Main requirements for the project  Previous internal review of new electronics for QPS  Project organization  Project planning  Outsourcing  Project management: main follow up meetings  Quality assurance: main points  Conclusions

Fabio Formenti - Feb. 25th, Upgrade motivations  Top priorities before next machine startup improved coverage of quench detection due to: - Abnormal splice joint resistance (from Sept. 19 th 2008 task force incident analysis) - Heat, beam loss, …etc…, induced symmetric quench (decision at Chamonix meeting, Feb. 2 nd -6 th, to run from day 1 at high energy) improved fault reliability of 230V UPS system (decision at Chamonix meeting, Feb. 2 nd -6 th )  Optional need for later machine startup: capability to monitor magnet ground voltage variations (this case is not treated now)

Fabio Formenti - Feb. 25th, Main goals for the project 1.Avoid changing the present magnet quench protection system It is proven to perform as expected Avoid re-commissioning 2.Add more electronics and infrastructure for bus bar joints and symmetric quench protections: ~500 DQAMG type S controller boards ~2500 DQQBS bus detection boards ~2000 DQQDS symmetric quench detection boards ~450 DQLPUS power supply units ~450 Crates with backplanes ~4400 Cables to dipoles and quadrupoles, total length ~230 km ~1600 Interlock patch panel 3.Duplicate UPS power distribution system ~900 Power packs ~1600 Distribution patch panels (may be two different types) ~1600 New power cables to QPS racks ~1600 QPS racks to update cable layout ~80 Protection units for the insertion region magnets (triplets) Total ~5900 boards Another ~900 boards

Fabio Formenti - Feb. 25th, Internal review of new electronics for QPS Held on Jan. 13 th Mainly aimed at production readiness Report available on INDICO ( Note: it needs NICE login) Main recommendations concerned: – Management, planning and resources – Radiation Tolerance – Technical issues for electronics (EMC, cabling, power, electronics reliability, electronics implementation, documentation) – Production and its follow up – Quality assurance 22 recommendations in total that are being applied according to project progression => a meeting with referees will be organized for providing status <=

Fabio Formenti - Feb. 25th, Project breakdown structure has been defined (started beginning January) Project leader: Knud Dahlerup-Petersen Project technical coordinator: Fabio Formenti 17 upgrade Work Packages it reflects today’s understanding, however trend seems pointing to a growth e.g. protection of insertion regions, more routine activities, other new priorities (maybe this review recommendations?) 10 different responsibles of Work Packages Go to working document => Project organization

Fabio Formenti - Feb. 25th, Project planning (PRELIMINARY ESTIMATE!) Chosen MS Project as project management tool to implement resource planning (as part of QA) Detailed dates, milestones and resource assignment (ongoing process) -> The document is now being revised because of new defined priorities (symm. quench & UPS) Included: all upgrade WPs and most urgent M&O tasks impacting on resource sharing Timescale of QPS Electronics Upgrade Project: started Sept. 1 st 08 – ending milestone Aug. 31 st 09 Planning based on: 40h/w working time not included (yet?) other holidays than week-ends and official holidays contingency cannot simply apply -> rescheduling and adding resources Go to working document =>

Fabio Formenti - Feb. 25th, Outsourcing  Sharing of responsibilities: specifications, supervision, follow up and commissioning -> MPE group specific competences -> support from TE, BE, EN, PH and external institutes production -> industry  Detailed Work Package definition for activities to be outsourced is in final editing Outsourcing is the only flexibility for this project planning To be effective, large WPs should be released to well selected competent teams  Go to working document =>

Fabio Formenti - Feb. 25th, Project management: follow up meetings Observation: many meetings and discussions are organized… … but this also takes time to the ongoing activities => Carefully attendance to most relevant meetings and when agenda is highly pertaining <= Project status report meetings (Siemko) When:every Friday, since January 1 st Who: MPE management and engineering staff What:major technical issues, outsourcing coordination, planning & project management status Technical report meetings (Dahlerup Petersen) When:every Monday, since 13/02/09 Who:all MPE-CP section people and collaborators involved in the QPS project What:detailed technical issues, activity status, incoming week work planning, supplier follow up, component procurement, logistics Hardware commissioning meeting (Schmidt) Starting soon (March 19 th )

Fabio Formenti - Feb. 25th, Project management: contribution to other meetings CCC machine re-commissioning meetings When:every Monday Who:management, project responsibles, coordinators What:activity status of magnet repair and new protection system (basically information meeting) Shut down planning meeting When:every Thursday Who:CERN activity responsibles, external work contractors What:global upgrade planning coordination … this is not surely fully exhaustive list …

Fabio Formenti - Feb. 25th, Quality assurance  Not trying to compromise on this issue  Main points being implemented: 1.Maximum availability of technical documentation (drawings, procedures, testers, s/w, etc.) on public domain (e.g. EDMS, DFS/public) 2.Thorough prototype verification in house by designers 3.Radiation tests of all key electronics components 4.Careful industry selection to conform to international quality standards (ISO9000) 5.Maximum of system component traceability, use of manufacturing and installation databases 6.Rigorous pre-production qualification and production acceptance tests with standardized procedures 7.Full system pre-commissioning in QPS lab and test result database 8.Installation with trained operators and verification tests by different team 9.Final commissioning supervised by QPS team engineers

Fabio Formenti - Feb. 25th, Conclusions  Bus bar quench detection  Symmetric quench detection (new priority)Motivate upgrade of QPS system  UPS improved redundancy (new priority) => Some new 6800 electronics cards to build and commission in tight time schedule <= => Some 1600 QPS racks to update <=  Work breakdown structure has been defined for all main upgrade activities => Routine activities, e.g. related to s34 reparation, compete for resource sharing <=  Schedule follow up and resource management have been introduced in planning tool => It is under revision for complying with new added priorities <=  Outsourcing becomes a necessity and is being implemented => We are editing tasks to define precise competences <=

Fabio Formenti - Feb. 25th, Extras Example: cable installation test

Fabio Formenti - Feb. 25th, HV test (500V)

Fabio Formenti - Feb. 25th, The automated HV tester system Power taken from QPS crate or tunnel blue power boxes Safe ground connection

Fabio Formenti - Feb. 25th, Analog cables (blue) and interlock cables (white) are only connected to the tester at its near end (the other end is left open)

Fabio Formenti - Feb. 25th, Automatic testing (it takes about 8 minutes) Testing … … and storing test report Temperature and humidity shall be verified

Fabio Formenti - Feb. 25th, Continuity test

Fabio Formenti - Feb. 25th, Coming in front of QPS crate (below B dipole) Identification of right location in cable database Connecting tester to power (taken from QPS crate)

Fabio Formenti - Feb. 25th, Connecting cables to tester Analog cables (blue) and interlock cables (white) have to be connected to good tester port following the database First check done with other cable side open (tester lights must be OFF)

Fabio Formenti - Feb. 25th, Putting diode taps at other ends of cables HV check mark must already be present

Fabio Formenti - Feb. 25th, The two cable ends could be up to a few 100 meters away

Fabio Formenti - Feb. 25th, Testing and labelling Tester lights ON if diode tap is connected to a good cable end Put barcode labels at two cable ends and annotate cable database