1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.

Slides:



Advertisements
Similar presentations
Roadmap for Sourcing Decision Review Board (DRB)
Advertisements

State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
CFS TIME SCHEDULE EDR - CFS Europe – Kick-Off Meetings Kick-Off Meetings, CERN, 3, 4, 5 September ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe.
1 DOE Annual Review -June 15,2005 An Overview of Conventional Facilities (Civil Construction) U. S. ILC Civil studies and cost issues for Snowmass Fred.
Fundamentals of Information Systems, Second Edition
Iterative development and The Unified process
Chapter 3: The Project Management Process Groups
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
@ Industrial Engineering by Bopaya Bidanda David I. Cleland.
Optimism R&D to be resumed! Three beam tests planned at Kek, –Hybrid target (KEKB Linac) –Liquid target (ATF Linac) –Boron-Nitride Window (KEKB) –(Starting.
Global Design Effort - CFS TILC09 and GDE AAP Review Meeting - Tsukuba, Japan 1 GDE ACCELERATOR ADVISORY PANEL REVIEW CONVENTIONAL FACILITIES.
Project Management Process Overview
S/W Project Management
1 Framework Programme 7 Guide for Applicants
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc. All rights reserved. BUSINESS DRIVEN TECHNOLOGY Business Plug-In B10 Project Management.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
NIST Special Publication Revision 1
NCSX Management Overview Hutch Neilson, NCSX Project Manager NCSX Conceptual Design Review Princeton, NJ May 23, 2002.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Controls & LLRF ILC Controls Telecon September 20, 2006 John Carwardine 1.Reports from ESRF Meetings 2.Misc. Items 3.Participant “Radar” Items.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
Apply Project Scope Management Techniques Project Scope Processes – Part 2 Certificate IV in Project Management Qualification Code BSB41507 Unit.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
Operations, Test facilities, CF&S Tom Himel SLAC.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
Develop Project Charter
DESY_ILCW07 Global Design Effort-CF&S 1 Beam Delivery System & Interaction Region Fred Asiri CF&S Point of Contact.
Fundamentals of Information Systems, Second Edition 1 Systems Development.
24-Aug-11 ILCSC -Mumbai Global Design Effort 1 ILC: Future after 2012 preserving GDE assets post-TDR pre-construction program.
1 Global Design Effort Beijing GDE Meeting, February 2007 Controls for Linac Parallel Session 2/6/07 John Carwardine ANL.
Chapter 3 Strategic Information Systems Planning.
Introducing Project Management Update December 2011.
The fourth Baseline Technical Review (BTR) - Conventional Facilities and Siting March 2012 All changes made to the CFS 2007 Reference Design during.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
Business Analysis. Business Analysis Concepts Enterprise Analysis ► Identify business opportunities ► Understand the business strategy ► Identify Business.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
1 Global Design Effort: Control System Vancouver GDE Meeting, July 2006 Controls Global System Review John Carwardine, ANL (For Controls Global Group Team)
Global Design Effort Introduction and goals of the meeting Andrei Seryi, Toshiaki Tauchi Fifth ATF2 Project Meeting December 19-21, 2007.
Overview of RUP Lunch and Learn. Overview of RUP © 2008 Cardinal Solutions Group 2 Welcome  Introductions  What is your experience with RUP  What is.
Conventional Facilities and Siting GG Global Design Effort BILCW 07 - Beijing1 Conventional Facilities and Siting Global Group Summary Report.
1 The ILC Control Work Packages. ILC Control System Work Packages GDE Oct Who We Are Collaboration loosely formed at Snowmass which included SLAC,
DRWS07 KEK Global Design Effort ILC Damping Rings Mini-Workshop December, 2007 High Energy Accelerator Research Organization KEK,
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
U.S. Department of Agriculture eGovernment Program Smart Choice Pre-Select Phase Transition September 2002.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
Global Design Effort Accelerator Systems EDR Kick-Off Meetings Preparation Nick Walker.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
January 9, 2006 Margaret Votava 1 ILC – NI/FNAL/ANL Brief overview of Global Design Effort (GDE) plans, dates, and organization: –Changes since Industrial.
CFS / Global – 09 June, 2010 PM Report: SB2009: –4 two-day workshops form the core of ‘TOP LEVEL CHANGE CONTROL’ –  as advised by AAP, PAC and etc –Written.
Main Linac Technology (MLT) Meeting To be held through WebEx July 13, 2007.
IV&V Facility 7/28/20041 IV&V in NASA Pre-Solicitation Conference/ Industry Day NASA IV&V FACILITY July 28, 2004.
Global Design Effort RTML KOM Close-out Ross, Walker.
Adaptive Software Development Process Framework. Version / 21 / 2001Page Project Initiation 2.0 Adaptive Cycle Planning 5.0 Final Q/A and.
Global Design Effort Close-Out Points EDR time-scale (2010) –No demonstrations to ILC-like RF unit –3(?) CMs constructed at FNAL – not RDR baseline –2(?)
Camera PDR/CD1 Planning 19 September 2008
Systems Analysis and Design in a Changing World, 4th Edition
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
Oct 22 Group Leaders Planning meeting
Chapter 6: Database Project Management
The ILC Control Work Packages
EDR HLRF Work Packages Draft Summary
Report on plan to produce an Engineering Design Report
Business System Development
ILC PROJECT ENGINEERING DESIGN REPORT CFS Europe – KICK OFF MEETING
X-DIS/XBRL Phase 2 Kick-Off
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Principal Investigator ESTCP Selection Meeting
Principal Investigator ESTCP Selection Meeting
Presentation transcript:

1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich

Global Design Effort: Controls & LLRF 2 Outline Agenda for the afternoon Goals for the week Brief review of Controls conceptual design in RDR The EDR described (part 1) Beginning point for R&D goals list

Global Design Effort: Controls & LLRF 3 GDE Management’s goals for this week… To review current status of global ILC R&D and future plans, including S-task force findings both for BCD-related & ACD items, and activities in and around test facilities (existing and proposed). Identify and prioritize critical engineering milestones for EDR phase (cost driven), including integration (and relationship to) the critical R&D milestones. To promote and improve collaboration between groups working on ILC related R&D: –To encourage a broader participation from active groups around the world –To attract new researchers to the field. To define the scope of the EDR and consolidate EDR planning: –Review project WBS and ‘Work Package’ structure. –Refine proposed schedule, milestones, deliverables etc. –Begin process of WP allocation.

Global Design Effort: Controls & LLRF 4 Goals for this group Improve our collective understanding of work ongoing or planned in the three regions, especially on beam facilities. Begin to define work required during EDR phase on Controls and LLRF. Align ongoing and planned work, identify any areas where additional work is needed. Begin to establish a global R&D program for Controls & LLRF Develop an ‘official’ list of global R&D goals, begin defining the path… What resources are available for R&D and design phase? How do we coordinate on a global level?

Global Design Effort: Controls & LLRF 5 To create this week… A draft ‘official’ list of R&D goals and milestones. A draft list of work packages for global R&D program. A draft list of prototypes to be tested at beam facilities, and where they would be tested. A draft list of work packages for design phase of EDR. A draft table of ATCA & uTCA instrumentation electronics boards being developed, showing their ATCA features.

Global Design Effort: Controls & LLRF 6 Logistics Goal is to provide forum for working sessions and discussions, not primarily presentation sessions. Presentations are aimed at stimulating discussion. Rely on work being done by members of the group between the formal sessions. Will attempt to make open time-slots for short presentations. Requests should be made to Kay Rehlich.

Global Design Effort: Controls & LLRF 7 EDR (draft from EDR Task Force) Primary goal of GDE activities in the Engineering Design Phase of the ILC project will be to advance (i) the technology, (ii) the design and (iii) the construction plans for ILC, to the point where approval for construction can be sought. In ~2010, an Engineering Design Report (EDR) will be produced: the EDR will explain the capabilities of the technology at that time, will detail the design of the machine and the construction plans, and will present an updated value estimate. The purpose of the EDR will be to facilitate: –Formal international negotiations at government level on (a) siting, (b) funding, (c) organization and (d) ILC project execution –Preparations for construction on a timescale consistent with the start of construction in ~2012. Preparations for construction will include the production of final engineering designs of critical components, procurement, and (once the site is chosen) site preparation.

Global Design Effort: Controls & LLRF 8 “Successful EDR requires…” (1) Basic R&D is needed to demonstrate that all major accelerator components can be engineered to meet the ILC performance specifications. R&D is needed into alternative solutions that will mitigate remaining technical risks. Any proposal to adopt an alternative solution as a new baseline must include costs information and a plan for the necessary technical development. An overall design must be produced, with sufficient completeness and detail to allow machine construction to start within 3 years, given project approval and funding. Where several options exist for high-technology components needed in large quantities, a selection between the options must be made to allow focused industrialization efforts. Comprehensive value-engineering exercise must be conducted, aimed at reducing cost and achieving design consistency.

Global Design Effort: Controls & LLRF 9 “Successful EDR requires…” (2) A complete value cost estimate for the machine must be provided, including a funding profile consistent with the project schedule. (Site-specific details will not be decided on the timescale of the EDR, and may be excluded or handled separately from other items in the value cost estimate). A project execution plan must be produced, including a realistic schedule. The project plan must include plans for industrialization of high-volume components in each of the participating regions. Designs must be produced for facilities shared between different “area systems”, and for site-specific infrastructure. The designs must include the level of detail needed for regions to estimate the cost to host the machine, taking into account local impact, infrastructure needs, and surface and underground footprints. Regions will require information to evaluate project technical and financial risks in support of a bid to host the machine. All necessary information must be provided.

Global Design Effort: Controls & LLRF 10 Controls Functional Diagram from RDR

Global Design Effort: Controls & LLRF 11 Controls Architecture from RDR…(1)

Global Design Effort: Controls & LLRF 12 Controls Architecture from RDR…(2)

Global Design Effort: Controls & LLRF 13 LLRF Block Diagram from RDR

Global Design Effort: Controls & LLRF 14 LLRF Control Diagram from RDR

Global Design Effort: Controls & LLRF 15 Starting point for R&D Goals List… Meet LLRF goals from R&D Board S2 Task Force Gain experience using ATCA + uTCA as a platform for ILC front- end electronics applications –Performance as Instrumentation platform. –Integration with Control system. –High Availability features. High Availability integrated control system implementation –Integrated hardware and software environments –Gain experience with tools & techniques. –Be able to make value based judgments of cost vs benefit of implementation for different applications. Control System as a tool for implementing HA at system level –Integrated Diagnostic tools to detect and pre-empt impending failures in technical equipment –Managing redundancy at Technical System level.

Global Design Effort: Controls & LLRF 16 Starting point for R&D Goals list…(2) Questions to answer –Is this the right list of R&D goals? –Are there items missing on R&D goals list? Descriptions of goals should address two contrary views… –Shouldn’t make technology decision so early (ATCA) –Does the Control System really have to be HA?

Global Design Effort: Controls & LLRF 17 Electronic Systems in general… There is benefit in making this effort a focal point for low- level electronic systems in general (not just Controls, LLRF) –Significant overlap with other ‘electronics’ technical groups (PS, HLRF, Instrumentation, …) –Common lessons to be learnt, opportunity for testing integrated systems (HA, ATCA,…) Should initiate contact with technical groups…

18 Global Design Effort: Controls & LLRF -- stop here for now --

Global Design Effort: Controls & LLRF 19 Starting point for R&D Work Package List (Americas Region Team WPs for FY08/09)

Global Design Effort: Controls & LLRF 20 To be done between now and Thursday’s session Assess top-level R&D Goals: –Local groups work on ‘starting point’ between now and Thursday session: Fermi/Argonne + DESY –Consolidate at start of Thursday session.

Global Design Effort: Controls & LLRF 21 Agenda for Thursday & Friday… Thursday –Summary of Tues Controls session –Summary of GDE plenary session (what did we learn about EDR) –Consolidate local groups’ work on R&D goals list. –Meeting wth EDR Task Force representative (4-5pm) –GAN/GDN discussion proposed for 5pm Friday –HA Control system software discussion Claude –Begin EDR task list