PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004.

Slides:



Advertisements
Similar presentations
1 Proprietary and Confidential New Jersey Clean Air Council Public Hearing April 1, 2009 Jeff Halfinger Babcock & Wilcox.
Advertisements

New Nuclear Plants in the United States
(1) Office of Nuclear Energy, Nuclear Energy – Advanced Fuel Cycles and the Global Nuclear Energy Partnership Buzz Savage Office of Nuclear Energy U.S.
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
New Nuclear Power Plant Project in Finland Veijo Ryhänen TVO Energy Conference Lisbon, 22 February 2006.
Slide 1 Doc.ppt 0144 NEW NUCLEAR POWER Ed Cummins Westinghouse Electric Company June 29, 2006.
GENERATION III AND III+ NUCLEAR POWER PLANT DESIGNS ACR-1000 (Advanced CANDU Reactor) Dr. Şule Ergün Hacettepe University Department of Nuclear Engineering.
PERMITTING CHALLENGES FOR THE NEW GENERATION OF NUCLEAR POWER PLANTS Ping Wan Bechtel Power Corporation Ninth Nuclear Utility Meteorological Data Users.
Acumen7 1 Accelerating UK Nuclear New Build Tony Roulstone July 2006.
Nuclear Power – Need and Future. Outline Economics of Nuclear Energy Basics of a Power Plant Heat From Fission History of Nuclear Power Current Commercial.
NRC Status and Plans for New and Advanced Reactors Michael A. Norato, PhD Chief, Component Integrity, Performance & Testing Branch 2 (BWRs) Division of.
The State of the Commercial Nuclear Industry Donald C. Hintz President, Entergy Corporation and Chairman, Nuclear Energy Institute IFPA Energy Conference.
New Reactors Bill Borchardt Director, Office of New Reactors.
Clear Thinking on Nuclear: New Plant Construction Nuclear energy is dependable, affordable, and environmentally sound. Nuclear energy is needed to meet.
February 19th, 2005 Non-CO 2 -emitting Energy Sources for the Future NUCLEAR POWER: SECURE ENERGY for the 21 st CENTURY Mike Corradini Nuclear Engineering.
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
ELECTRICITY MARKET RESTRUCTURING AND INVESTMENT IN NUCLEAR POWER GENERATION Evidence From Power Uprates In U.S. Nuclear Industry Chen-Hao Tsai Advisor:
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
New Nuclear Power and Climate Change: Issues and Opportunities Mary Quillian Director – Business and Environmental Policy Nuclear Energy Institute.
Mary Alice Hayward Vice President, Strategy, Government and International Affairs AREVA, Inc. Williams Mullen Alternative Energy Forum May 26, 2011 Nuclear.
Ralph L. Andersen, CHP Director – Health Physics & LLRW Nuclear Energy Institute May 15, 2008 The Resurgence of Nuclear Power Health Physics Society Baltimore-Washington.
NUCLEAR POWER: PAST ACCOMPLISHMENTS, FUTURE CHALLENGES E. Gail de Planque Strategy Matters, Inc.
New Nuclear Power Plants Need and Status ASQ-EED 31 st Energy & Environmental Division Conference September 12, 2004 Adrian Heymer, NEI
WALL STREET UTILITY GROUP The Energy Policy Act of 2005: The Implications for Nuclear Energy 22 September 2005.
Ashley Finan, 2006 Page 1 Nuclear Energy and Oil Sands? Ashley Finan Massachusetts Institute of Technology Department of Nuclear Science & Engineering.
Resource Planning Georgia Power’s Diverse Plan to Meet Georgia’s Energy Needs AWMA Fall 2010 Conference October 7, 2010 Jeff Burleson Director of Resource.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
CANDU Fuel Options: Practical Adaptability Jerry Hopwood Vice President, Marketing & Product Development World Nuclear Association, Annual Symposium September.
Westinghouse Operational Experience and Prospects for New Build
1 The Future of Nuclear Energy Hydrogen and Electricity Production Charles W. Forsberg Oak Ridge National Laboratory Oak Ridge, Tennessee Tel: (865)
7671-9/06- 1 Nuclear Power Poised for Expansion /06- 1 Jimmy Wang Vice President Bechtel Nuclear.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Nuclear Power Plant New Build Activity: A Market Overview
A NUCLEAR RENAISSANCE Ping Wan The Tenth Nuclear Utility Meteorological Data Users Group Meeting June 2005.
Nuclear Power Plants Emission-Free Stability in a Volatile Market LSU Energy Conference October 21-22, 2004 Adrian Heymer, NEI, ,
Configuration Management in New Reactor Construction Tom Kozak, NRO/DCIP/CAEB
4/2003 Rev 2 I.4.7 – slide 1 of 48 Session I.4.7 Part I Review of Fundamentals Module 4Sources of Radiation Session 7Nuclear Reactors IAEA Post Graduate.
Atoms for Peace +50 Andy White – President & CEO, GE Nuclear Energy.
Sustained Reliability U.S. Nuclear Plant Average Capacity Factor 91.1% in % in % in % in % in % in %
Nuclear Industry QA Initiatives and Opportunities ASQ Southern Jersey Section October 22, 2008 Dinner Meeting October 22, 2008 Dinner Meeting Tom Mudge.
Plant Parameter Envelope for Early Site Permits
Reiner W. Kuhr Executive Consultant University of Calgary November 2, 2006 PBMR Oil Sands Applications.
1 Nuclear Energy Division MIT Report on the Future of Nuclear Power in the United-States : review and discussion Eric Proust Director, Industrial Affairs.
U.S. Energy Policy Legislation Thelma L. Wiggins Manager, Media Relations Nuclear Energy Institute ENS PIME 2004 Barcelona, Spain Feb. 9, 2004.
New Reactors: Licensing Basis and Configuration Mgmt Challenges June 22, 2010 David B. Matthews Director Division of New Reactor Licensing Office of New.
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
Westinghouse Non-Proprietary Class 3© 2015 Westinghouse Electric Company LLC. All Rights Reserved. 1 Graham Cable Vice President, New Plant Development.
Briefing on the Pebble Bed Modular Reactor Portfolio Committee on Public Enterprises 18 February Top Secret - 1.
1 NRC Update R. Brad Harvey, Leta Brown US Nuclear Regulatory Commission th NUMUG Meeting, Wilmington, NC.
Adding Nuclear Power to the Grid ASQ Energy and Environmental Conference August 28, 2006.
Nuclear Power Reactors
© 2008 Dominion Building New Nuclear Plants: Are Utilities Ready? Wisconsin Public Utility Institute Advances in Nuclear March 26, 2008 Eugene S. Grecheck.
Nuclear Energy 2016: Status and Outlook
Greening the Grid with America’s Nuclear Power Plants.
LOW PRESSURE REACTORS. Muhammad Umair Bukhari
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
Nuclear Energy in 2013: Status and Outlook Paul Genoa Senior Director, Policy Development Nuclear Energy Institute Florida Senate Committee on Communications,
Enhancing Safety at America’s Nuclear Energy Facilities U.S. Industry’s Fukushima Response Joseph Pollock, Nuclear Energy Institute Christopher H. Mudrick,
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
IAEA International Conference on Fifty Years of Nuclear Power – The next Fifty Years Moscow - Obninsk, Russian Federation - June 28, 2004 Nuclear.
Janet R. Schlueter Senior Director, Radiation and Materials Safety
Collaborative Research in
Nuclear Power Update for The Society of American Military Engineers
NEI Perspectives on Small Modular Reactors
Dr. Nils J. Diaz 28th Annual Bonbright Center
Adding Nuclear Power to the Grid
Plant Parameter Envelope for Early Site Permits
Current Market & Industry’s Path Forward
NuScale Micro-Reactor Technology
Presentation transcript:

PP571.1 The Prospects for New Nuclear Construction Eugene S. Grecheck Vice President Nuclear Support Services ANS Virginia Section Meeting March 16, 2004

PP571.2 What You May Have Heard (or what happened to the predictions of 1000 reactors by 2000?)  No new nuclear plant orders since 1978  Licensing and construction takes too long  Last new plant began operation in 1996  Construction and operations and maintenance costs are too high  Licensing is unpredictable

PP571.3 If That’s True, Then…………...  Many existing units will shut down prematurely  Licenses will not be renewed  No new units will ever be built  Nuclear will fade from the nation’s energy portfolio So…… IS IT TRUE????

Industry Capacity Factor Continues at Record Level 86.8% in % in % in % in 2002 Nuclear Energy Institute

Production Costs Show Steady, Sustained Improvement 2.09 cents/kWh in cents/kWh in cents/kWh in cents/kWh in 2001 (production cost in cents per kilowatt-hour)

PP571.6 US Electricity Production Costs ( ) in 2002 cents per kilowatt-hour Source: RDI /EUCG. Converted to 2002 dollars by NEI.

PP571.7 Industry Safety Performance shows steady Improvement……………………… Number of Unusual Events Reported to NRC ( ) Source: NRC Note: A Notification of Unusual Event for power and non-power reactor licensees is a condition involving potential degradation of the level of plant safety that does not represent an immediate threat to public health and safety.

Nuclear Plant Output: Growth During the 1990s Equivalent to 26 new 1,000-megawatt power plants Year Billion kWh

PP571.9 License Renewal: Unlocking Additional Value Already filed Catawba 1,2 McGuire 1,2 Fort Calhoun Announced 2003 Arkansas Nuclear One Unit 2 Cook 1,2 Browns Ferry 1,2,3 Announced 2004 Millstone 2,3 Nine Mile Point 1,2 Brunswick 1,2 Beaver Valley 1,2 Davis-Besse Pilgrim Approved Calvert Cliffs 1,2 Oconee 1,2,3 Arkansas Nuclear One Unit 1 Hatch 1,2 Turkey Point 3,4 North Anna 1,2 Surry 1,2 Peach Bottom 2,3 St. Lucie 1,2 Already filed (cont’d) Robinson 2 V.C. Summer Ginna Dresden 2,3 Quad Cities 1,2 Farley 1,2 Source: NRC Updated : October 2003 Announced 2005 Entergy Plant Announced 2006 Susquehanna 1,2 Entergy Plant Wolf Creek

PP Today’s State of the Nuclear Industry  440 commercial reactors in 31 countries  103 commercial reactors in the U.S.  Overall, 16% of the world’s electricity  15 countries: Over 25%, some over 70%  31 new reactors under construction in other countries - but none in the U.S. …….yet!

PP Projected U.S. Energy Growth

PP Capacity Brought on Line by Fuel Type ( ) Source: RDI PowerDat database. Last updated 9/15/03.

PP Current U.S. Electricity Generation Fuel Diversity (2002) Source: NEI Emission-free sources

50,000 MWe of New Nuclear! 30% non- emitting 30% non- emitting Oil, Gas & Coal Hydro & Renewables New Nuclear Capability (50,000 MWe) Enhanced Nuclear Capability (10,000 MWe) Existing Nuclear Capability Billion kWh

PP What Has Changed---and Is It Enough?  New licensing process  New plant designs  More reliable and efficient operation

PP New NRC Licensing Process  NRC revised its regulations--Part 52--for new nuclear plants over a decade ago  Part 52 has three elements: – Design certification – Early site permitting – Combined license

Early Site Permit Design Certification Combined License Issued ConstructionITAACOperation Apply for Construction Permit Construction Apply for Operating License Operating License Issued Operations OLD LICENSING PROCESS NEW LICENSING PROCESS NRC Licensing Process License Issued BEFORE Large Capital Investment License Issued AFTER Large Capital Investment Construction Permit Issued

What this Process Changes  Licensing decisions will be made BEFORE large capital investments are made. – Safety and environmental issues will be resolved before construction starts – NSSS and BOP design will be well developed before COL application is submitted – Plants will be almost fully designed before construction starts  Result: High confidence in construction schedule and cost control

PP Design Certification  Design Certification addresses design issues early in the process  Plants are designed to be constructed in less than 48 months  Each manufacturer’s plants will be a standard certified design  3 Design Certificates have been issued, 1 active application in review

PP Early Site Permits (ESP)  Obtaining an ESP allows a company like Dominion to “bank” a site for 20 years, with an option to renew  If and when market conditions warrant, nuclear may then be considered among a variety of generation options  Dominion has no plans to build another nuclear plant yet.

PP ESP Application Status  Dominion’s ESP Application was submitted on 9/25/03  Exelon submitted on 9/25/03  Entergy submitted on 10/21/03

PP Combined License  Combines the Early Site Permit and the Design Certification into a site and technology specific document  When approved, provides authorization to build and operate  Resolves operational and construction issues before construction begins  Process has yet to be tested

PP New Nuclear Technologies  Innovative new reactor technologies are being developed for deployment  Passive and active safety system designs  Some based on existing light and heavy water designs; some on new gas-cooled technologies  Bases in existing technology expected to yield reliable operation  Designed for short construction periods and reduced construction costs  All can be economically attractive

PP General Electric Advanced Boiling Water Reactor  Net plant output, 1356 Mwe, 3926 MWth, with uprate to 1500 Mwe, 4300 MWth  Single, stand-alone unit  Licensed in three countries  Improved safety systems  Engineered in detail, except for site engineering  Has been constructed in 48 months  Next ABWR unit will be the 5th in the series  Design Certification has been issued

PP Westinghouse AP1000  3400 MWth, 1200 MWe  2 steam generators, 4 canned reactor coolant pumps  Based on much existing technology  Passive Design Features  Modular construction – 36 Month Construction, First Concrete to Fuel Load  Design Certification application has been filed. Approval expected in 2005

PP Atomic Energy Canada, LTD ACR-700  739 MWe, 1983 MWth  Designed for simultaneous LOCA and Loss of ECCS  On-Power Refueling  Robust, safe, economical Fuel Design  Compact, smaller Calandria  Horizontal fuel channels  Reduced Heavy Water Inventory  Design Certification application expected in 2004

PP General Electric ESBWR  1380MWe, 4000MWth  Passive Safety Systems to Simplify Plant Design  Natural Circulation Reactor Vessel  Designed for Improved Reliability and Maintainability  Design Certification application expected in 2005

PP Other Plant Designs  Framatome SWR-1000 – 1250 MWe BWR, active and passive safety systems  Framatome EPR – 1600 MWe advanced PWR, improved thermal performance  Westinghouse IRIS – 330 MWe PWR, single pressure vessel houses all major components  Pebble Bed Modular Reactor – 160 MWe Gas cooled, single cycle  General Atomics GT-MHR – 285 MWe Gas cooled, single cycle

PP DOE Nuclear Power 2010  Objectives: – Develop new technologies – Demonstrate licensing process – Encourage new nuclear development  Cost-sharing approach  Also supports advanced research and critical education pipeline

PP Barriers to the Decision to Build  Licensing uncertainties with untested processes  High initial unit costs  Financing risks  Earnings dilution during construction  High level waste disposal  Price-Anderson renewal

PP What’s Next?  Energy Bill – Still stalled in Congress – Potential for incentives to assist development of the first new plants – Gas Reactor Demonstration Project at INEEL  NP2010 – DOE solicitation to develop COL application to test next step in licensing process – Includes DOE match for FOAKE

PP Hypothetical Timeline for First Plant  Develop COL Application, complete necessary first of a kind engineering (FOAKE) – 24 months  NRC Review and Approval of COL Application – months – Complete remainder of FOAKE  Construction of new plant – months, start of construction to commercial operation IT CAN ALL HAPPEN AS SOON AS 2013

PP Can it Really Happen?  Price stability  Energy diversity  Emission-free generation It Can… and Must!

PP “The best way to predict the future is to create it.” -- Peter F. Drucker

PP571.35