Using Project Portfolio Tool ‘PMFolio’ by AlNik Solutions, LLC Copyright 2011 ©

Slides:



Advertisements
Similar presentations
Training Course: Task List. Agenda Overview of the Task List Screen Icons across the top Making Appointments Viewing Appointments & Filters Working Your.
Advertisements

Chapter 10 Excel: Data Handling or What do we do with all that data?
Database Basics. What is Access? Database management system Computer-based equivalent of a manual database Makes it easy to organize and update information.
Module 2 Navigation.     Homepage Homepage  Navigation pane that holds the Applications and Modules  Click the double down arrow on the right of.
Home This training presentation is designed to introduce the Residency Management Suite to new users. This presentation covers the following topics: Login.
© Paradigm Publishing, Inc Access 2010 Level 1 Unit 2Creating Forms and Reports Chapter 6Creating Reports and Mailing Labels.
Advanced Order Copy with Online Availability Checking An Enhancement For iSeries 400 DMAS from  Copyright I/O International, 2005 Skip Intro.
Using LMPlan - Version 1.6 by AlNik Solutions, LLC Copyright 2011 ©
Building Your Project Work Plan in March 2, 2007 HP Project & Portfolio Management by Dan Gallagher See NOTES page for Presentation Discussion, Tips &
® Microsoft Office 2010 Word Tutorial 3 Creating a Multiple-Page Report.
Management Reporter By Zara Beckstein/Matt Saad. Basic Navigation Similar to GP 2013 R2 windows, there is a Navigation Pane in the lower left. This will.
Project Development Using PMPlan by AlNik Solutions Copyright ©
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 5 1 Microsoft Office Excel 2003 Tutorial 5 – Working With Excel Lists.
The Find Tab. Please select a button to learn more. Welcome to the Find Tab. Here is where you can look for funding opportunities.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Microsoft Excel 2010 Chapter 8
Copyright 2003, Paradigm Publishing Inc. CHAPTER 4 BACKNEXTEND 4-1 LINKS TO OBJECTIVES Headers and Footers Margins Center a Worksheet Page Breaks Gridlines.
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
USSF North Carolina Arbiter Referee Assignment Site An Introduction & Guide for Use by Referees © Copyright June 2005 by Paul James, all rights reserved.
Tutorial 5: Working with Excel Tables, PivotTables, and PivotCharts
XP 1 Microsoft Office Excel 2003 Tutorial 3 – Working With Excel Lists.
Chapter 3 Maintaining a Database
1 DESKTOP TIPS Presented by: Doug Bonebrake Senior Project Manager Global Project Office FrontRange Solutions Inc.
Open Workbench By Wilmer Arellano Spring Statement Of Work (SOW) A statement of work (SOW) is a document used in the Project Development Life Cycle.
Financial Perspectives
Chapter 6 Advanced Report Techniques
AESuniversity User Tips & Tricks. Session Outline  Working with your Caseload Customers  Recording Services  Snapshot Tips  Searching Tips  Working.
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
A Tutorial about the PPD Reform Tracking Tool on FileMaker Public-Private Dialogue.
Demographic Profiles of Agency Clients - Part 2 Next, we will create a table and a column chart for the conservator field in my database. Because we are.
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Access Project 7 Advanced Report and Form Techniques.
Introduction to Enterprise Guide Jennifer Schmidt Rhonda Ellis Cassandra Hall.
The Next Generation. Parent Access Grade History and Attendance.
Course ILT Forms and queries Unit objectives Create forms by using AutoForm and the Form Wizard, and add or modify form headers and footers Open and enter.
Unpublished Work © 2003 Treb Gatte Program Management Using MS Project Server Treb Gatte Wachovia Corporation Permission granted to MPUG-Charlotte for.
CFM S4 Cloud iQ Guide THE FUTURE OF CASH AUTOMATION.
CERTIPORT EXCEL PRACTICE. EDITING SORT/FILTER/FIND & REPLACE In the Summary worksheet, sort the data in descending order by Order Number, and then in.
Using Purview Advanced Features Tuesday 10/30/2007 Breakout Session 5C Wednesday 10/31/2007 Breakout Session 3C.
NextGen Dataviewer Local Government Corporation. Dataviewer Dataviewer is a tool used to create spreadsheet style reports exportable to Excel, HTML and.
Electronic Proposal Development and Submission Module 7 Proposal Budgets Research Suite Product Support m.
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
Project Setup and Execution For PMPlan Enterprise Presented by AlNik Solutions Copyright ©
Copyright 2007, Paradigm Publishing Inc. ACCESS 2007 Chapter 6 BACKNEXTEND 6-1 LINKS TO OBJECTIVES Using the Report Button Using the Report Button Print.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
Excel part 5 Working with Excel Tables, PivotTables, and PivotCharts.
Introduction to Technology. Parts of MSWord Screen Title Bar Quick Access Toolbar Button Ribbon Status Bar (views and zoom)
Granite School District ESD Gradebook
Extracting Information from an Excel List The purpose of creating a database, or list in Excel, is to be able to manipulate the data elements in ways that.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
Education And Training CTC IT DIVISION PivotLink User Training April 2010.
Customize Your View of Data Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
Orders – View and Print Boeing Supply Chain Platform (BSCP) Detailed Training January 2015.
SOW / Open Workbench By Wilmer Arellano Spring 2008.
Open Workbench By Wilmer Arellano Spring This is just an example, you can customize as you like.
Chapter 8 Working with Trendlines, PivotTable Reports, PivotChart Reports, and Slicers Microsoft Excel 2013.
Orders – Create Responses Boeing Supply Chain Platform (BSCP) Detailed Training July 2016.
Course Objectives After completing this course, you should be able to:
Analyzing Data with Excel
Boeing Supply Chain Platform (BSCP) Detailed Training
SSI Toolbox Status Workbook Overview
Managing Rosters Screener Training Module Module 5
AGILENT TECHNOLOGIES RESTRICTED
All Right Reserved © JiJi Technologies Pvt Ltd
Approving Time in Kronos Manager/Supervisor Reference Guide
Shelly Cashman: Microsoft Excel 2016
All Right Reserved © JiJi Technologies Pvt Ltd
Presentation transcript:

Using Project Portfolio Tool ‘PMFolio’ by AlNik Solutions, LLC Copyright 2011 ©

Agenda ‘Using PMFolio’ Introduction Selecting Projects for Reports Reports Selecting Projects for PMFolio Custom Fields Preview/Printing/Exporting

Introduction Sr. Management Revenue Analysis and Portfolio tool for analyzing all projects within the organizations common server database and provides summary reports showing the status and health of all of the projects, or projects of interest. PMFolio is a complementary module to PMPlan.

Custom Reports Standard Reports anDbManager (Database Administration) PMPlan Enterprise Tool Suite PMPlanDB (Project Management) Basis-Of-Estimate Labor Loading Other Direct Costs Budgets Company Accounting Data Company Rate Data Company Roster Data Work Breakdown Structure Objectives Deliverables Scheduling Importing Actual Estimate-To-Complete Earned Value Methodology Jobs CategoriesJobs RatesBurden RatesRosterActual Standard Reports Custom Reports LMPlanDB (Line Management) Planned Monthly Loading Data Assigned Monthly Loading Data Standard Reports Custom Reports PMFolio (Portfolio Reports) Balance Remaining Workforce Requirements Deliverables Milestones Revenues Cash Flow

PMFolio opens with Project Listing These checks controls which projects will be used in reports. This is the latest accounting closing date. This indicates that the project has been updated in PMPlan since last import. This indicates that status of that project is not current.

Project Listing (continued) Clicking on a header will sort on that column. Clicking a second time will reverse the order.

Project Listing (Continued) Clicking on the funnel icon will allow the data to be filtered.

PMFolio Reports Except for the Summary Balance Remaining report, the projects selected in the project listing will be used in each of these reports.

Report - Summary Balance Remaining The Row Background is Green when the BAC/EAC > 1.1 Or Variance > +$50,000 The Row Background is Red when the BAC/EAC < 0.95 Or Variance < -$20,000 Clicking here will display details of selected project at the control account level (see next slide.

Balance Remaining Details of a Project End of the Incurred To Date (ITC)

Report – Summary Workforce Requirements Red when < 40% Goal Orange when 40% to 59 % Goal Yellow when 60% to 79 % Goal Light-Green when 80% to 99 % Goal Dark-Green when Over Goal Blue when Over Head Count Clicking here will display bar chart for that category (see next slide)

Forecast for Specific Category Backlog (Active Projects) Proposals

Report - Detail Workforce Requirements Default is to group by Account/Title, then Category

Detail Workforce Requirements (Continued) Dragging the Column Header will change the grouping. Result

Detail Workforce Requirements (Continued) Clicking these buttons control monthly or yearly views

Report - Deliverables Red background indicates overdue Green background indicates due in more than 3 months Yellow background indicates due in the next three months

Report - Activities Default order is expected finish date Can filter activities based specific Resource Category.

Report - Milestones Red background indicates overdue Green background indicates due in more than 3 months Yellow background indicates due in the next three months

Report – Total Revenue

Report – Revenues by Project Order of these columns determines the grouping

Revenues of Projects (Continued) Dragging Manager Column to far left changed the groupings

Report – Total Cash Flow

Report – Cash Flow Status by Project Clicking this will show details of that project (see next slide)

Report – Cash Flow for Specific Project Current Status

Tools for Administrators Refreshes the Project Listing Controls which projects from PMPlan are imported into PMFolio Allows editing of custom fields used for filtering project list Allows editing of Project Kinds Listing If a check mark is displayed the application will import all the selected projects nightly at 1 AM.

Custom Fields for Filtering and Sorting This indicates that this field will not be used. Click this to clear field A lookup list should be used to control what is entered in field cell. Can have up to ten fields If a value is removed, it will be necessary to edit values in the ‘Import Projects Table’

Project Kinds Listing The ID determines the order, but you must not change an ID value. If you want to insert a title, replace the titles of all items greater than the ‘insertion’ point. To delete an item, click in the row header left of the 5, then press Delete. After that re-titled as desired. To insert an item, click in the ID cell next to the *, enter 6. After that re-titled as desired.

Projects to Import This indicates that this PMPlan project should be imported The green cells for sorting and filtering Grey background is not selected.

Projects to Import (Continued) When you select a white cell a drop down list usually will be displayed. If a project is checked, make sure each of the white cells are set as desired. This should be 100 for active project, and less for Proposal based on expected chance of getting the work.

Manually Importing Projects This will import all of the select projects This will import all projects that have been updated in PMPlan, since last import.

Previewing/Printing/Exporting Can export to all these formats Add Water Mark to foreground or background Can control Page Setup Can edit Header and Footer Can attach report to

Using PMFolio Thank you, any questions?