GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011.

Slides:



Advertisements
Similar presentations
Page 1 ERCOT Project Status 1 ERCOT Dynamic Ratings METF March 29, 2012.
Advertisements

QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
SCED Power Balance Penalty Curve
Unresolved Issues in NPRR 555 Texas Steel Companies July 9, 2013.
Raine Cotton  Registered DG settlement is in accordance with Protocol Section as Real-Time Energy Imbalance at a Load.
Real-Time Transmission Congestion Management & Market Effects
SAWG Update to WMS February 4 th, 2015 Brandon Whittle.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
MISUG Meeting Materials ERCOT 10/16/ Agenda 10/16/ Antitrust AdmonitionJ. Lavas 9:30 a.m. 2.Introduction/Agenda OverviewJ. Lavas 9:35 a.m.
October 22, 2007 TPTF Meeting Early Delivery Systems Status Update and Forecast Daryl Cote/John Webb/John Hall.
QSE Managers Working Group Meeting Notes 3 February, 2010 Report to WMS 17 February, 2010 David Detelich - Chairperson.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Requirement Documents November 7, 2006 Sai Moorty MMS Project.
December 2, 2011 QMWG Summary of Potential Issues with NPRR385 Price Floor ERCOT.
COMMUNICATIONS AND SETTLEMENTS WORKING GROUP (CSWG) April 2015 Update to COPS.
Lead from the front Texas Nodal 1 External Web Services Update Nodal Implementation Team Presentation July 7, 2009.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
Wholesale Market Subcommittee April 12, 2012 ERCOT Dynamic Ratings Application.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
ROS Meeting – 12/06/071Texas Nodal Program - TPTF Update Texas Nodal Transition Plan Task Force ROS Meeting Stacy Bridges, ERCOT Thursday, 12/06/2007.
Lead from the front Texas Nodal 1 Private Use Networks SIG Paper Review TPTF Meeting (version :15)
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
1 Impact Assessment of Parking Deck NPRRs/SCRs/NOGRRs Phase 1 March 2011.
1 Impact Assessment of Parking Deck and New NPRRs/SCRs Phase 1 February 2011.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Nodal ATF 1 Nodal Advisory Task Force Update for TAC November 4 th, 2010.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
1 Market Trials Open Market Participant Call Weekly Kick Off March 01, 2010.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
January 21, 2008 TPTF 168 Hour Test Initial Approach Discussion.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
MISUG Meeting Materials ERCOT 4/28/ MISUG4/28/2011 Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3.Market Data.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Impact Analysis and Feasibility Study Review – NPRR164, NPRR169 and SCR752 Troy Anderson ERCOT Program Management Office January 15, 2009.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
SAWG Update to WMS April 6 th, 2015 Brandon Whittle.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
1. Non-Dispatchable Resources and EIS Market Carrie Simpson May 30,
1 ERCOT Pricing and Dashboard Updates NATF Sept 30, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Load Frequency Control (LFC) Business Requirements Energy.
QMWG Update to WMS S. Looney October 9, WMS Assignments NPRR564, Thirty-Minute Emergency Response Service – Discuss concerns expressed at last WMS.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
Business Case NPRR 351 Floyd Trefny Amtec Consulting Brenda Crockett Champion Energy Services.
QSE Managers Working Group Report to WMS, April 8, 2011 S. Looney, Luminant.
QSE Managers Working Group November 7 th 2011 NPRR 334 – Additional Analysis.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
1 WMS Report TO TAC April 2007 (which is in March)
MISUG TAC Update Jackie Ashbaugh ERCOT 3/7/ TAC3/7/ /22/2011 Meeting Focus on the high priority items from MISUG: Review task list prioritization.
1 ORDC Curve Discussion ERCOT QSE Managers Working Group 9/4/2015.
DSWG Update to WMS 2/9/2011. EILS Procurement Results from 1/31 Business Hours 1 HE 0900 through 1300, Monday thru Friday except ERCOT Holidays; 425 hours.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 Nodal Stabilization Market Call December 27, 2010.
NPRR680 background concept Carrie Bivens Manager, Day-Ahead Market PRS February 12, 2015.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
TAC December 3, 2009 Meeting Update 1. TX Nodal Implementation 2 PhaseWhenScopeStatus 2.1: Market Connectivity MILESTONE COMPLETE Oct. 28MP interface.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
RDTF June 1, Purpose “The effect of the Shadow Price cap for the Power Balance Constraint is to limit the cost calculated by the SCED optimization.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Protocol Revision Subcommittee Sandy Morris August 4, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Market Management System Update on TPTF Comments on MMS Clarification Notes May 21,
Multi-Interval Real-Time Market (MIRTM) Updates SAWG Sean Chang Market Analysis February 22, 2016 ERCOT Public Version
EDS 3 Release 5 SCED Testing Update - TPTF Daryl Cote August 28, 2007.
IMM alternate framework for Look-Ahead SCED November 21, 2011.
Lead from the front Texas Nodal 1 Texas Nodal Energy & Market Management System EMS/MMS Projects Requirement Documents November.
“Look Ahead SCED” Sai Moorty ERCOT November 28, 2011.
RTDF Overview of Data Analysis & Status of “Consesus Items”
Principles of Participation in Real-Time Co-optimization
Paul Wattles, Sai Moorty ERCOT Market Design & Development
Presentation transcript:

GTBD Forecasting Using SCED to Produce Projections of Future LMPs Floyd J. Trefny February 17, 2011

Topics ERCOT System Load Examples  Sunday, January 30, 2011  Thursday, February 3, 2011 GTBD Forecasting Methodology Analysis of Forecasting Errors Implementation in SCED Next Steps

Average Mw Change in Mw/Min over 15-minute SCED interval

GTBD Forecasting Methodology GTBD (Generation To Be Dispatched) is the sum of the Base Points dispatched in SCED Typically, calculated by summing up the current actual generation from all the Generation Resources that are going to be dispatched by SCED SCED LMPs are based on this amount of total power A reasonable forecast of future GTBD can be calculated from:  System ramp rate sampled over the last fifteen minutes Ramp rate may be positive or negative  Add: Real-Time SCED GTBD + (Ramp Rate*15) gives the “Forecasted GTBD”

Implementation in SCED In addition to the existing SCED, execute the same SCED algorithm once at the top of each 15-Minute period, but using the Forecasted GTBD Use same offer curves, Resource Limits and Status that were available to SCED for the actual dispatch of generation Assume that the same transmission constraints that are active in real time SCED are also active in the Forecast SCED calculation Provide via ICCP and post on MIS, the LPM’s generated for:  Resource Nodes  Hubs  Load Zones (LMPZ)

Next Steps Get Comments from ERCOT Staff Draft NPRR WMS Discussion Seek expedited implementation to support Quick Start objectives and demand response

Discussion

Appendix

SCED UP and SCED Down