MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Progress of Riga and Pieriga Mobility Plan (RRMP) Andulis Židkovs Deputy State Secretary, Head of Responsible Authority
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Procurement Plan and Implementation of RPMP NDJFMAMJJLASONDJFMAMJ ASOND Technical Assistance contract execution € Prep TD Procur 52dTD eval Reporting to Steering Commette x x X X X X RPMP elaboration contract execution €
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA RPMP management structure Steering Committee (MoT, Riga City, Municipalities, “Latvian Railway”, “Passenger Train”, “Riga Traffic” and other stakeholders Working group (MoT, Riga City) Project coordinator of Ministry of Transport Contractor for RPMP
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Structure of RPMP (content) Assessment of existing situation Setting up and approval of goals to be reached Development of modelling system (based on existing EMME/2) Elaboration of various scenarios for development of transport system Detailed elaboration of recommended scenario Elaboration of Working program for implementation of selected scenario
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Development of major infrastructure projects in Riga Transfer of port activities out from city centre to the Krievu sala (CF): Construction Transfer of activities after 2013 Modernization of infrastructure of Riga airport and access roads (CF): Construction Construction of new passenger terminal in airport Riga– (PPP project)
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA Other important infrastructure projects Reconstruction of Riga railway junction – partly enssure access to the port terminals on the left bank of Daugava– (CF) Construction of railway access road to the Riga airport (Rail Baltica branch) – (CF)
MINISTRY OF TRANSPORT AND COMMUNICATIONS OF THE REPUBLIC OF LATVIA
Feasibility studies on the left bank of Daugava Supporting feasibility studies before implementation these projects: “Feasibility Study on Railway Routes to the Port Terminals on the left bank of the Daugava River and to the International Airport “Riga”” - need to be prolonged until 2010! (2004/LV/16/C/PA/001) “Technical Assistance Project “Renovation of Riga Railway Network” -need to be prolonged until 2010! (2004/LV/16/C/PA/001) Connection of Riga airport to the main road network and Riga city – 2009 – 2010 All activities above are included in ToR of RPMP and must be considered within elaboration process!