Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at.

Slides:



Advertisements
Similar presentations
Tracker Subsystem1 GLAST LAT Project FM15 PSR, Oct. 14, 2005 GLAST LAT Tracker Tower15 Pre-Ship Review INFN-Pisa.
Advertisements

Tracker Subsystem1 GLAST LAT Project FM8/14 PSR, Oct. 5, 2005 GLAST LAT Tracker Towers 8/14 Pre-Ship Review INFN-Pisa.
2005 LAT-COLLABORATION MEETING Gamma-ray Large Area Space Telescope A walk through the LAT Tracker towers alignment Nicola Omodei INFN-Pisa.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectF-to-F, March, TrackerR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face March Meeting Robert Johnson.
GLAST LAT ProjectMonthly Review, September 1, Tracker SubsystemR. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S August Status Meeting.
GLAST LAT ProjectOctober 14, 2002 Tracker, WBS GLAST Large Area Telescope: Tracker Subsystem WBS Engineering Meeting Tracker Engineering-Model.
Tracker Subsystem1 GLAST LAT Project FM7/9 PSR, Sept. 9, 2005 GLAST LAT Tracker Tower7/9 Pre-Ship Review INFN-Pisa.
Tracker Subsystem1 GLAST LAT Project FM4/5 PSR, May 31, 2005 GLAST LAT Tracker Tower-4/5 Pre-Ship Review INFN-Pisa.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT Readout Electronics Marcus ZieglerIEEE SCIPP The Silicon Tracker Readout Electronics of the Gamma-ray Large Area Space Telescope Marcus.
GLAST LAT ProjectOctober 1st, 2004 GLAST LAT Tracker Anomaly Resolution Team 1 TMCM connector stay clear problem Alessandro Brez INFN - Pisa
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
MRB on SLAC NCR 226 MCM Encapsulation Delamination R.P. Johnson January 3, 2005.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
Tracker Subsystem1 GLAST LAT Project FM-B PSR, 10 Feb, 2005 GLAST LAT Tracker Tower-B Pre-Ship Review Luca Latronico INFN-Pisa
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
GLAST LAT ProjectSubsystem Managers Meeting May 12, GLAST Large Area Telescope: Lowell A. Klaisner Stanford Linear Accelerator Center Project Manager.
Tracker Subsystem1 GLAST LAT Project FM6 PSR, July 21, 2005 GLAST LAT Tracker Tower6 Pre-Ship Review INFN-Pisa.
GLAST LAT ProjectLadder wirebonds break - MRB 03 Dec 2004 L. Latronico1 Ladder Wirebonds break MRB Meeting – 3 december 2004.
GLAST LAT ProjectF-to-F, June 15, TrackerR.P. Johnson 1 GLAST Large Area Telescope: Tracker, W.B.S Face-To-Face June Meeting Robert Johnson.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 GLAST Large Area Telescope: Tracker Subsystem MCM Production Readiness.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Robert P. Johnson 1 GLAST Large Area Telescope: Silicon-Strip Tracker/Converter.
INFN-Pisa Glast Database in Pisa A practical solution based on MSAccess Luca Latronico INFN Pisa.
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
INFN-Pisa Glast Database in Pisa A practical solution based on MSAccess Luca Latronico INFN Pisa.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 8 NCRs were generated during TMCM preproduction NCR #00029, CLOSED.
GLAST LAT ProjectMarch 24, D Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS D: Composite Panel Fabrication.
Tracker Subsystem1 GLAST LAT Project Production Readiness Review, 25 August, 2004 GLAST LAT Tracker TOWER-A PRR TKR Tower Electrical Test Plan Luca Latronico.
Tracker Production Overview Readout Cables UCSC, SLAC (Parlex) SSD Procurement, Testing SLAC,Japan, Italy (HPK) Electronics Fabrication, burn-in, & Test.
GLAST LAT ProjectHV-short risk evaluation from bubbles cut - 12 Nov, 2004 L. Latronico1 from ANNEX 02 to NCR/FM/INFN/RM2/ cm/tile 4.24 m/layer.
GLAST LAT ProjectMonthly Review, November 3, 2004 Tracker SubsystemP. S. Drell 1 GLAST Large Area Telescope: Tracker Subsystem WBS Persis S. Drell.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Ladder Fabrication A. Brez.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Schedule Summary; Critical.
GLAST LAT ProjectMarch 24, G Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS G: Tower module assembly A.
GLAST LAT ProjectSLAC, May 14, 2003 A.Brez 1 Honeycomb grounding of the GLAST trays Tray electrical conductivity: Carbon Carbon, carbon fiber and Al core.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, F Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS F: Tray assembly A. Brez I.N.F.N.
MRB on SLAC NCR 226 Excess of Disconnected MCM Channels R.P. Johnson November 9, 2004.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
GLAST LAT ProjectMonthly Status Review – Nov 3, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
Tower A software alignment GLAST LAT Project Tower A software alignment 28 Jan 2005 M.Kuss, A.Brez1 Tower A software alignment 28 january 2005.
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: Silicon Strip Detector.
PS Module Ron Lipton, Feb A bit of History During much of the conceptual design phase of the outer tracker we had focused on the “long barrel”
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
Cable MRB July 13, 2005 R.P. Johnson. July 13, 2005R.P. Johnson2 Cable Status Needed in Italy to support Tower 8,9 Environmental Testing July 19.
GLAST LAT Project R.Bellazzini GLAST-LAT International Collaboration Meeting, Roma, Sept GLAST-LAT International Collaboration Meeting Roma,
Trigger efficicency on double tracks Trigger efficiency on isolated tracks Final results of the Trigger Test on the 25ns beam Bx NUMBER Fraction of Triggers.
Gamma-ray Large Area Space Telescope Tower 1 TVAC tests Bad ladders issues.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
GLAST LAT ProjectMRB 09/14/2005 L. Latronico1 Tower 14 – Layer Y0 malfunction MRB Meeting – 14 September 2005.
Procedure for MCM rework on tray MID 070
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
GLAST Large Area Telescope:
Mini-Tower test results
We have no new trays for tower 4!!
Investigation on tray MID 063 Back
Preproduction Status & Results
FNAL Production Experience
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
The encapsulation problem of the LAT heavy trays
GLAST Large Area Telescope:
GLAST Large Area Telescope:
Presentation transcript:

Tracker Subsystem1 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 GLAST LAT Tracker Delta Manufacturer Readiness Review for Tray Assembly and Test at G&A Luca Latronico INFN-Pisa

Tracker Subsystem2 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Relevant Documents LAT-PS-01801Integration of TMCM and SSD Ladders onto Tracker Trays released LAT-PS-03534Single Tray Electrical Test Plan released Production company: G&A Engineering, Carsoli-Oricola (AQ)

Tracker Subsystem3 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 alignment jig Assembly and test flow-chart INFN provides G&A with tray panels, TMCMs, ladders, (and their relative locations on the tray) + Nusil adhesives Alignment jig (WS-B1) provides: –TMCM planarity –Pitch adapter planarity –Bonding pads alignment (HV and shield pads) –Dry assembly test to check TMCM connectors clearance Adhesive distribution (WS-B2) Assembly of TMCM onto tray (WS-B3) Metrology (WS-B4) Current production rate ramping up: –need to match CC pocket and MCM connector depth –extra screening on TMCM pitch adapter (missing connections on signal strips and HV lines – PA debondings) WS-A Material receiving and inspection WS-B TMCM Integration

Tracker Subsystem4 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Assembly and test flow-chart Ladder test (WS-C1) Tray Z positioning under CMM (WS-C2) –  50  m wrt nominal position Ladder positioning on the bridges (WS-C3) –Alignment from bridge itself used as reference and excellent alignment of SSD inside ladder (~2  m RMS) Glue deposition (WS-C4) –19 spots of siliconic glue/SSD –4 spots conductive glue + 1 unbroken line across ladders Ladder assembly (WS-C5) Ladder metrology (WS-C6) –Ladder height 0.25  0.1 mm –Ladders relative parallelism of 0.1 mm Wire bonding (WS-C6) –Destructive pull tests on coupons (>5g each) –Visual inspection Functional test by INFN with tray inside box –LAT-PS DRB and shipping to INFN WS-C Ladders integration WS-D Final disposition Ladder assembly tools

Tracker Subsystem5 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Availability of components and tools Bare panel trays after TVAC test in Roma2 –27 trays available – planned supply is 4trays/day SSD Ladders from G&A and Mipot –~1400 ladders available more from G&A (200 to test, 200 being built) – 900 will be built from Mipot asap MCM from SLAC through quick functional verification at INFN-Pisa –Currently –Could match 14 trays (26 TMCMs) from first lot of 38 because of connector stick-out issue –6 TMCMs sent back to SLAC for PA debondings Nusil at G&A for ~3/4 of tray production G&A tools –TMCM alignment tools: 5 –Ladder integration tools (tray alignment + ladder bridges): 6 –CMM: 2 (1 for alignments, 1 for metrology) –Glue dispenser: 2 –wire-bonder: 2 –2 working shifts per day to grant production rate of 4 trays/day EGSE for functional tests –1 full EGSE system installed at G&A and operated by INFN

Tracker Subsystem6 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 From INFN to GA: –List of subparts (ladders and TMCM) from INFN-Pisa From GA to INFN: –List of subparts with G&A reference SNs (neede for tray box) –Progress of assembly (weekly) Quality Assurance –Rely on G&A certified QA program for internal activity –Handle major NCR notified from G&A (MARECO) with Pisa system Data exchange with INFN-Pisa

Tracker Subsystem7 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Tower 0 tray production 14 complete trays assembled (27 TMCMs and SSD Ladder planes) –23 Si layers were within specs –4 Si layers had short for problems related to bias circuit delamination All went through thermal tests –4 Si layers (bottom side of heavy trays) had many disconnected channels because of CTE mismatch impact on wire-bond encapsulation  MRB on wire-bond encapsulation 23 SSD layers operated successfully up to now

Tracker Subsystem8 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Metrology: with a CMM with interchangeable mechanical-optical heads, the positions of 12 “C” markers, 3 for each ladders, and the positions of the MCM alignment pins are measured on both sides of the tray. Metrology of ladders alignment

Tracker Subsystem9 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Results – ladders alignment

Tracker Subsystem10 GLAST LAT Project TRAY DELTA MRR, 18 Nov., MID front: V079MID back: V 050MID front: V050MID back: V Functional test results – leakge current

Tracker Subsystem11 GLAST LAT Project TRAY DELTA MRR, 18 Nov., MID front050MID back 079MID back 079MID front Functional test results – trigger rates vs threshold

Tracker Subsystem12 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 MCMDisconected at SLACDisconnected at G&A 365 (079 MID Front)Total 8 – ch1227 false positive at PA test 1222, 1224, 1226, 1227, 1228, 1229, 1231, Total , 1224, 1226, 1228, 1229, 1231, (079 MID Back)Total (050 MID Front)Total 0Total 1 – ch0 false negative? (050 MID Back)Total 3 49, 50, 1031 Total 4 – ch1031 false positive, ch51 false negative? 49, 50, 51, Functional tests results – bad channels Total number of bad channels well within specs (16 max) High reliability of PA screening test on TMCM High yield of wire-bonding

Tracker Subsystem13 GLAST LAT Project TRAY DELTA MRR, 18 Nov., 2004 Conclusions Assembly and test procedures well tuned and tested on EM trays and tower 0 G&A moving rapidly to planned production rate High yield of assembly so far –> 100 ladders glued and wire-bonded with no failures and well within specs Tower A production well within specs –Leakage current –Noise and thresholds performance –Bad channels