Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz.

Slides:



Advertisements
Similar presentations
Flavio Dal Corso - INFN Padova1 OPERA coll. meeting - Hamburg 3 July 2004 RPC & XPC Electronics Status Front End Boards (FEBs) Controllers HV system Crates.
Advertisements

Efficiency of the L1 Trigger for SUSY Study performed by L. Boldizsár, P. Hidas KFKI Budapest J. Erö, M. Fierro, A. Jeitler, N. Neumeister, P. Porth, H.

CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
TDC in ACTEL FPGA Tom Sluijk Wilco Vink Albert Zwart Fabian Jansen.
CMS Annual Review 2003 PACT - the RPC Muon Trigger Bari-Helsinki-Laapperanta-Warsaw Jan Królikowski Warsaw University.
Alice EMCAL Meeting, July 2nd EMCAL global trigger status: STU design progress Olivier BOURRION LPSC, Grenoble.
US Test Beam Results Of Front End Timing T. Ferguson, N. Terentiev* (Carnegie Mellon University) CMS EMU Meeting University of California, Davis Feb 25.
July 10, 2008 PHENIX RPC review C.Y. Chi 1 RPC Front End Electronics On chamber discriminator  The strips  The CMS discriminator chips  The discriminator.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
RPC Trigger ESR Warsaw 08 July 2003 F. Loddo I.N.F.N. Bari Status report on RPC FEB production Status report on RPC Distribution Board Interfaces RPC-LB.
Vienna Group Trigger Meeting CERN, 6 Dec Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
LECC 2004 – Boston – September 13 th L.Guiducci – INFN Bologna 1 The Muon Sorter in the CMS Drift Tubes Regional Trigger G.M. Dallavalle, Luigi Guiducci,
Vienna Group Trigger Meeting CERN, 18 July 2006 Presented by Claudia-Elisabeth Wulz Global Muon Trigger Global.
Claudia-Elisabeth Wulz Institute for High Energy Physics Vienna Level-1 Trigger Menu Working Group CERN, 9 November 2000 Global Trigger Overview.
DT Track Finder, Global Muon Trigger, Global Trigger H. Bergauer, L. Boldizsar, M. Dallavalle, Ch. Deldicque, J. Erö, L. Guiducci, A. Jeitler, I. Jimenez.
Status of the CSC Track-Finder Darin Acosta University of Florida.
M. Lo Vetere 1,2, S. Minutoli 1, E. Robutti 1 1 I.N.F.N Genova, via Dodecaneso, GENOVA (Italy); 2 University of GENOVA (Italy) The TOTEM T1.
Some features of V1495 Shiuan-Hal,Shiu Everything in this document is not final decision!
On-line Software Requirements for the Global Trigger, the Global Muon Trigger and the Barrel Muon Trigger Track Finder Claudia-Elisabeth Wulz & HEPHY Vienna.
STGC Trigger Demonstrator sTGC Trigger Demonstrator ATLAS Israel Annual Meeting 30 December 2012 Lorne Levinson, Julia Narevicius, Alex Roich, Meir Shoa,
HBD FEM the block diagram preamp – FEM cable Status Stuffs need to be decided….
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
Global Trigger H. Bergauer, L. Boldizsár, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J.
FADC progress in Vienna Reported by H.Ishino for Vienna FADC group M.Pernicka and H.Steininger.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Trigger Internal Review CERN, 6 Nov GLOBAL TRIGGER.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
Claudia-Elisabeth Wulz Anton Taurok Institute for High Energy Physics, Vienna Hannes Sakulin CERN Annual Review CERN, 24 Sep Global Trigger Global.
March 9, 2005 HBD CDR Review 1 HBD Electronics Preamp/cable driver on the detector. –Specification –Schematics –Test result Rest of the electronics chain.
Implementation and Test of the First- Level Global Muon Trigger of the CMS Experiment Hannes Sakulin 1), 2), Anton Taurok 2) 1) CERN 2) Institute for High.
US CMS DOE/NSF Review, May Cal. Trig. 4 Gbaud Copper Link Cards & Serial Link Test Card - U. Wisconsin Compact Mezzanine Cards for each Receiver.
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
CSC Muon Sorter M. Matveev Rice University January 7, 2003.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
Global Trigger, Global Muon Trigger H. Bergauer, L. Boldizsar, A. Jeitler, P. Hidas, K. Kastner, S. Kostner, N. Neumeister, M. Padrta, P. Porth, H. Rohringer,
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
Peter LICHARD CERN (NA62)1 NA62 Straw tracker electronics Study of different readout schemes Readout electronics frontend backend Plans.
US CMS DOE/NSF Review, May Trigger Plenary - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF.
1J. Gu CERN CSC Meeting July 2008 DAQMB/FEBs Readiness for First Beam Jianui Gu The Ohio State University.
Vienna Group Discussion Meeting on Luminosity CERN, 9 May 2006 Presented by Claudia-Elisabeth Wulz Luminosity.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
Trigger Group of the Institute for High Energy Physics, Vienna presented by Claudia-Elisabeth Wulz CPT Week, Plenary Session CERN, 18 April 2002 GLOBAL.
L1 Global Muon Trigger Simulation Status URL of this presentation:
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
Global Trigger, Global Muon Trigger H. Bergauer, Ch. Deldicque, J. Erö, A. Jeitler, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
PSL APA Update May 3, 2016 UW Physical Sciences Lab.
CMS EMU TRIGGER ELECTRONICS
Jan Królikowski Warsaw University
Regional Cal. Trigger Milestone: Major Production Complete
Darin Acosta University of Florida
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Muon Port Card & Sector Processor in production
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Sector Processor Status Report
Global Trigger and Global Muon Trigger Latency
Global Muon Trigger Update
Presentation transcript:

Global Muon Trigger / RPC Interface Warsaw and Vienna Groups RPC Electronics System Review Warsaw, 8 July 2003 presented by Claudia-Elisabeth Wulz

RPC ESR, Warsaw, July 2003 C. - E. Wulz2 Global Muon Trigger Overview Output: 8 bit , 6 bit , 5 bit p T, 2 bits charge/synch, 3 bit quality, 1 bit MIP, 1 bit Isolation Inputs: 8 bit , 6 bit , 5 bit p T, 2 bits charge, 3 bit quality, 1 bit halo/eta fine-coarse Best 4  4  RPC brl 4  DT 4  CSC 4  RPC fwd 252 MIP bits 252 Quiet bits

RPC ESR, Warsaw, July 2003 C. - E. Wulz3 Input from RPC to GMT 8 bit  :2.5 0 steps, bin 0 at interval OK 5 bit p T :Non-linear scale, must be indentical for RPC and GMT. p T =0 means no muon.OK 3 bit quality:New definition since 6-plane algorithm.OK ORCA to be updated. 6 bit  :Tower number for positive side. For negative side to be decided.? Halo bit / fine eta bit: Not relevant for RPC‘s. 1 bit charge: 1 - negative, 0 - positiveOK 1 bit charge validation: now computed by RPCOK 3 bits bunch counter:B2 B1 B0OK 1 bit bunch crossing zero: BC0OK 1 bit synchronization error: SEOK 1 bit clock:CLKOK

RPC ESR, Warsaw, July 2003 C. - E. Wulz4 Bit Assignment and Hardware Assignment of input bits LVDS drivers and receivers Suggested: SN75LVDS bit LVDS driver SN75LVDT bit LVDS receiver Cables for parallel transfer Suggested: Madison cable: 34 pairs, 28 AWG, halogen free (order together with Wisconsin group)

RPC ESR, Warsaw, July 2003 C. - E. Wulz5 Assignment of LVDS Signals

RPC ESR, Warsaw, July 2003 C. - E. Wulz6 Connectors SCSI-3 type connector Wire pairs: w1-w2 = pin 35-1, w3-w4 = pin 36-2etc.

RPC ESR, Warsaw, July 2003 C. - E. Wulz7 GMT in Underground Counting Room

RPC ESR, Warsaw, July 2003 C. - E. Wulz8 Global Trigger / Global Muon Trigger Crate

RPC ESR, Warsaw, July 2003 C. - E. Wulz9 Layout of USC55 Counting Room Racks Lower Floor Links ( ~5ns/m) + LVDS driver/receiver stages should not contribute more than 2-3 bx to latency. Need estimate of cable length.

RPC ESR, Warsaw, July 2003 C. - E. Wulz10 GMT Hardware Status  GMT consists of  3 pipeline synchronizing boards (PSBs)… prototype available  1 GMT logic board… logic design completed  FPGA design for GMT logic board in progress  Milestones  Dec 2002: logic design completed… completed  Dec 2003: FPGA design done… progress as planned  Jun 2004: GMT available  Oct 2004: GMT tested

RPC ESR, Warsaw, July 2003 C. - E. Wulz11 URL’s and Documentation This talk can be found at: GMT_RPC_warsaw.ppt Detailed information about the Global Muon Trigger and the Global Trigger is available on the HEPHY Vienna web sites: Draft interface document Regional Muon Trigger / GMT to be finalized: Reg_to_GMT_Note_0.91.pdf

RPC ESR, Warsaw, July 2003 C. - E. Wulz12 Conclusions and Acknowledgements Most of the issues of the RPC/GMT interface are settled. To be done: - Choice of cables and connectors - Coding of  - Update RPC and GMT codes in ORCA - Update documentation Special thanks to M. Kudla, H. Sakulin and A. Taurok.