PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.

Slides:



Advertisements
Similar presentations
PHENIX WEEKLY PLANNING 2/8/2007 Don Lynch. 2/8/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress Pink.
Advertisements

PHENIX WEEKLY PLANNING 1/4/2007 Don Lynch. 1/4/207 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 2/15/2007 Don Lynch. 2/15/207 Weekly Planning Meeting 2 Remaining Schedule StartComplete Cosmic Ray Run (Run 6.9)In Progress All.
2/9/20121 PHENIX WEEKLY PLANNING 2/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 5/17/2007 Don Lynch. 5/17/2007 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 9/7/06 Don Lynch. 9/7/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 11/30/06 Don Lynch. 11/16/06 Weekly Planning Meeting 2 PHENIX END OF SHUTDOWN PARTY Celebrating the successful installation of.
PHENIX WEEKLY PLANNING 2/21/2008 Don Lynch. 2/21/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 1/13/2011 PHENIX WEEKLY PLANNING 1/13/2011 Don Lynch No Meeting Today Due to snow shortened work week, today’s planning meeting has been cancelled. Slides.
1/5/20121 PHENIX WEEKLY PLANNING 1/5/2012 Don Lynch.
8/9/20121 PHENIX WEEKLY PLANNING 8/9/2012 Don Lynch.
PHENIX WEEKLY PLANNING 10/05/06 Don Lynch. 10/05/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
12/26/2013-1/2/ PHENIX WEEKLY PLANNING Dec. 26, Jan. 2, 2014 Don Lynch.
12/5/ PHENIX WEEKLY PLANNING Dec. 5, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 3/8/2007 Don Lynch. 3/8/207 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Continues…. All Up Commissioning In Progress.
Progress Completed Order/Fabricate SS Piping for HBD Purge gas from all detectors DAQ tests Prep. for Shutdown work (open doors, move carriages, etc. Pave.
12/29/20121 PHENIX WEEKLY PLANNING 12/29/2011 Don Lynch.
1/9/ PHENIX WEEKLY PLANNING Jan. 9, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 1/31/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 7/31/06 Don Lynch. 7/31/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 10/11/2007 Don Lynch. 10/11/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
PHENIX WEEKLY PLANNING 3/6/2008 Don Lynch. 3/6/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
1 PHENIX WEEKLY PLANNING December 3, 2015 Carter Biggs.
PHENIX WEEKLY PLANNING 6/29/06 Don Lynch. 6/29/2006 Weekly Planning Meeting 2 This Week TOF W tests continue, modification decisions made? New HV connector.
PHENIX WEEKLY PLANNING 3/27/2008 Don Lynch. 3/27/2008 Weekly Planning Meeting2 Shutdown ’08 Schedule CM Crane ReviewMar Purge Flammable Gas, Magnet.
5/1/ PHENIX WEEKLY PLANNING May 1, 2014 Don Lynch.
11/8/20121 PHENIX WEEKLY PLANNING 11/8/12 Don Lynch.
PHENIX WEEKLY PLANNING 2/2/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 3/22/2007 Don Lynch. 3/22/2007 Weekly Planning Meeting 2 Schedule Re-Start 5 man shifts 3/20/07 Beam: blue ring 3/8/07, in yellow.
PHENIX WEEKLY PLANNING 1/10/2008 Don Lynch. 1/10/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going1/18 Gas.
PHENIX WEEKLY PLANNING 2/9/06 Don Lynch. Prep Schedule for Run 6 BBC N&S dried, tested re-installed, final tested [DONE] MuTr FEE and anode purge lines.
PHENIX WEEKLY PLANNING 9/14/06 Don Lynch. 9/14/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown '065/1/200612/8/2006.
PHENIX WEEKLY PLANNING 3/09/06 Don Lynch. BLM Test BLM Test Installation He Bags.
PHENIX WEEKLY PLANNING 3/23/06 Don Lynch. MPC Electronics MPC rack installed without cards. Cards to be installed As available and as access time is available.
1 3/10/2011 PHENIX WEEKLY PLANNING 3/10/2011 Don Lynch.
9/27/20121 PHENIX WEEKLY PLANNING 9/27/2012 Don Lynch.
1 PHENIX WEEKLY PLANNING January 21, 2016 Carter Biggs.
PHENIX WEEKLY PLANNING 10/4/2007 Don Lynch. 10/4/2007 Weekly Planning Meeting 2007 PHENIX Shutdown October 2007: Finish MPC South Installation, replace.
PHENIX WEEKLY PLANNING 12/7/06 Don Lynch. 12/7/06 Weekly Planning Meeting 2.
PHENIX WEEKLY PLANNING 10/20/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
1 12/30/2010 PHENIX WEEKLY PLANNING 12/30/2010 Don Lynch.
8/31/05DR Lynch1 HBD Preparations in the IR Don Lynch.
PHENIX WEEKLY PLANNING 10/18/2007 Don Lynch. 10/18/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish MPC South InstallationDoneDone Elec.
12/6/20121 PHENIX WEEKLY PLANNING 12/6/12 Don Lynch.
PHENIX WEEKLY PLANNING 10/12/06 Don Lynch. 10/12/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 11/15/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC Tent preparationOn Going11/30.
PHENIX WEEKLY PLANNING 3/15/2007 Don Lynch. 3/15/2007 Weekly Planning Meeting 2 Schedule Cosmic Ray Run (Run 6.9) Done All Up Commissioning On Going Re-Start.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
5/24/20121 PHENIX WEEKLY PLANNING 5/24/2012 Don Lynch.
12/19/ PHENIX WEEKLY PLANNING Dec. 19, 2013 Don Lynch.
PHENIX WEEKLY PLANNING 5/7/2007 Don Lynch (Thursday is Monday this week)
12/20/20121 PHENIX WEEKLY PLANNING 12/20/12 Don Lynch.
Preparations for Run 6 Don Lynch February 13, 2006.
PHENIX WEEKLY PLANNING 10/26/06 Don Lynch. 10/20/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 5/3/2007 Don Lynch. 5/3/2007 Weekly Planning Meeting 2 Schedule HyTec CM vibration modes test5/23/07 End of Run Party 6/29/07 Next.
1 1/29/2009 PHENIX WEEKLY PLANNING 1/29/2009 Don Lynch.
Technical Support /16/08 PHENIX WEEKLY PLANNING 10/16/2008 Don Lynch.
PHENIX WEEKLY PLANNING 3/1/2007 Don Lynch March: in like a lion Out like a lamb.
2/27/ PHENIX WEEKLY PLANNING Feb. 27, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 11/8/2007 Don Lynch. 11/8/2007 Weekly Planning Meeting2 Run 8 Prep Schedule ItemStartFinish Elec. Cooling Water upgrade(CA) (under.
12/6/20121 PHENIX WEEKLY PLANNING 12/13/12 Don Lynch.
PHENIX WEEKLY PLANNING 6/8/06 Don Lynch. 6/8/2006 Weekly Planning Meeting 2 This Week Rec’d TOF West Access: move HBD to Dead Turtle Position Sec’y of.
PHENIX WEEKLY PLANNING 3/30/06 Don Lynch. This Week MPC air flow started BLM source test HBD transparency monitor hutch work and cable tray 1 st MPC Card.
1 11/25/2010 PHENIX WEEKLY PLANNING 11/25/2010 Don Lynch.
2/20/ PHENIX WEEKLY PLANNING Feb. 20, 2014 Don Lynch.
PHENIX WEEKLY PLANNING 8/31/06 Don Lynch. 8/31/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
PHENIX WEEKLY PLANNING 8/24/06 Don Lynch. 8/24/06 Weekly Planning Meeting 2 PHENIX Shutdown Overview Task_NameDurationStart_DateFinish_Date PHENIX Shutdown.
1 2/19/2009 PHENIX WEEKLY PLANNING 2/19/2009 Don Lynch.
PHENIX WEEKLY PLANNING 2/14/2008 Don Lynch. 2/14/2008 Weekly Planning Meeting2 Run 8 Task Schedule ItemStartFinish RPC supportOn GoingOn Going CM Crane.
PHENIX WEEKLY PLANNING 2/16/06 Don Lynch. Prep for Run 6 Completed.
Presentation transcript:

PHENIX WEEKLY PLANNING 11/2/06 Don Lynch

11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North

11/2/06 Weekly Planning Meeting 3 New Detectors Services

11/2/06 Weekly Planning Meeting 4 HBD Signal Rack Cutouts Done Mounting Brackets Done “Chimney” Done Cable Cover waiting for material

11/2/06 Weekly Planning Meeting 5 Still Needed for Approval to Operate: Where will fan(s) be mounted? – CM base “cubby hole” fan model and specs to be forwarded to Safety Written design and operation description and– To be forwarded to Safety Order for 5 blowers & drivers (4 +1 spare) is in the works HBD (Hadron Blow Drier) Electronics Cooling Blower requirements: 5 cfm (142 5 in WC (1245 Pa) Order delayed Again ! ?

11/2/06 Weekly Planning Meeting 6 HBD “EBO” Heaters Initial Start up complete !!

11/2/06 Weekly Planning Meeting 7 Subsystem Maintenance & Repairs EMCal West & East Done DC HV/LV patch panel upgrade & wire repair Done MPC South repaired BBC South & North repairs done MuTr grounding problems Fixed MuTr North and South HV/FEE troubleshooting ~ Done..Dry air distribution balancing ongoing RICH light leak ~ PC HV module/cable maintenance done TEC upgrades done MuID survey/commissioning later this month

11/2/06 Weekly Planning Meeting 8 Infrastructure Work CAD/RHIC PHENIX infrastucture related mechanical and electrical support Roof leak repairs ? MuID survey Nov 06 LN2 Tank markings Done Door Latch maintenance for security Requested EC roll in support Nov. 1 Run 7 prep support Nov-Dec

11/2/06 Weekly Planning Meeting 9 StartComplete TOF West, RXNP, MPC N Electronics Installation/Commissioningin progress11/30/06 HBD HBD drying heater system commissioning10/25/0611/15/06 HBD preamp cooling system10/1/0611/15/06 (temporary LN2 system in-place) Electronics Installation/Commissioning11/1/0611/30/06 MuID survey10/23/0611/30/06 MuID commissioning 12/11/0612/18/06 Remaining Schedule

11/2/06 Weekly Planning Meeting 10 Remaining Schedule (cont’d) StartComplete East carriage roll in & setup Prepare IR & EC for move to IR/move cart, manlifts, collars 1-Nov3-Nov EC Roll in 6-Nov Connect EC services 6-Nov10-Nov Install EC Ladder 13-Nov14-Nov Install EC rear access & ext. 15-Nov17-Nov Pink Sheeting & Blue Sheeting 13-Nov1-Dec Move MMS full North/Install beam pipe collar 20-Nov21-Nov Rebuild Rolling door 27-Nov30-Nov RHIC Cooldown Begins 1-Dec Close rolling door 1-Dec Start Flammable Gas Flow 5-Dec All Up Commissioning 5-Dec18-Dec Beam in yellow ring 18-Dec Beam in blue ring 25-Dec RHIC beam conditioning 25-Dec31-Dec Shutdown Concluded/Start of Physics Run 1-Jan

11/2/06 Weekly Planning Meeting 11 Looking Ahead What’s up for next year and beyond New CM Crane New Beam pipe design Muon RPC trigger design VTX/FVTX design NCC design MuTr upgrade ? Infrastructure improvements

11/2/06 Weekly Planning Meeting 12 SEU Test John Lajoie Iowa State Experimental Impact Statement The box dimensions are: 17” x 10” x 3.5”. The only services required by the box in order to function are AC power and a Cat5 cable connected to the USB interface. The FPGA devices will be programmed and monitored over an external USB connection, which is run over a USB -> Cat5 extender box. This extender has a maximum range of 150 feet of Cat5 cable, which should be sufficient to reach from the PHENIX IR to the rack room, where it will connect to a laptop containing the analysis and configuration software. (The laptop will require network access, and will comply fully with all BNL cybersecurity requirements.) Because SEU events are relatively rare, it would be best to expose the apparatus to as high a particle flux as possible. However, the box represents a substantial amount of material and it would be unacceptable to place the box within the acceptance of the central arms. Placement within one of the muon arms, near or on the central magnet pole, would be optimal.

11/2/06 Weekly Planning Meeting 13 SEU Test John Lajoie Iowa State Current proposed location for test box. To be oriented with long side of box perpendicular to ebeam orbit direction (z).

11/2/06 Weekly Planning Meeting 14 Next Week EC Roll in PHENIX Annual Safety Review HBD, TOF W, RXNP, MPC N electronics commissioning HBD signal rack chimney HBD & TOF W mixing house gas control systems MuID survey ?

11/2/06 Weekly Planning Meeting 15 Links for the weekly planning meeting slides, long term planning, pictures, videos and other technical info can be found on the web site: Where To Find PHENIX Technical Info