Muon Tracking Meeting 13.06.2012. SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part.

Slides:



Advertisements
Similar presentations
Status of the CTP O.Villalobos Baillie University of Birmingham April 23rd 2009.
Advertisements

HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MICE Target Electronics & DAQ Update P J Smith University of Sheffield 2 nd December 2009.
Walls crates cables gas chambers electronics CERN adb.
LKr readout: present and future R. Fantechi 30/8/2012.
PP2 Status F. Bellina. Problem solved.. Problem with inhibit and reading temperature and many crazy behavior Solved with a new FPGA firmware: the hardware.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Web Based Monitoring DT online shifter tutorial Jesús Puerta-Pelayo CIEMAT Muon_Barrel_Workshop_07/July/10.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
Group Electronique Csnsm AGATA SLOW CONTROL MEETING 19th fev AGATA PROJECT PREPROCESSING MEZZANINE SLOW CONTROL GUI FOR THE SEGMENT AND THE CORE.
Dimuon Forward Spectrometer May 2008 Cosmic Run Day by Day report Interesting runs.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
DAQ & ECS for TPC commissioning A few statements about what has been done and what is still in front of us F.Carena.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Evaporative Heater Design, qualification and planning M.Olcese PRR SCT off-detector cooling PRR SCT off-detector cooling March March 2005.
TB Peter Glässel, Heidelberg1 TPC Progress.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
André Augustinus 21 June 2004 DCS Workshop Detector DCS overview Status and Progress.
11 SSD Power and Cooling on the Cone STAR Integration Workshop Howard Matis May 16, 2008 STAR Integration Workshop Howard Matis May 16, 2008.
R. Fantechi. TDAQ commissioning Status report on Infrastructure at the experiment PC farm Run control Network …
18 July 2006A.Ciocio -SCTSG1 SCT Services Installation ID week full report (July 4) SCT Cables Web page
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
Calo Piquet Training Session - Xvc1 DCS and DSS Cuvée 2015 – RUN2 Xavier Vilasís-Cardona.
Neil JacksonUK-V RAL 8th September Module to Disc Assembly Infrastructure –Services and test box –Evaporative cooling system –Disc Handling Tests.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Status of NA62 straw electronics Webs Covers Services Readout.
IDE DCS development overview Ewa Stanecka, ID Week, CERN
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
PHENIX WEEKLY PLANNING 11/2/06 Don Lynch. 11/2/06 Weekly Planning Meeting 2 New Detectors TOF West HBD RXNP MPC North.
FNAL All Experimenters Meeting January 7, Leslie Groer Columbia UniversityDØ Status 1 DØ Status and Progress Dec 17, 2001 – Jan 7, 2002  Reasonably.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
8 June 2006A.Ciocio - SCTSG1 Status of Type IV Cables Cables production –resumed in February after 3 months stop –See ID week February ‘06 Delivery of.
H. MatisSTAR Inner Silicon Tracking Detector Review – July 8, SSD software and hardware maintainability Howard Matis.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
R. Fantechi. Shutdown work Refurbishment of transceiver power supplies Work almost finished in Orsay Small crisis 20 days ago due to late delivery of.
LAV thresholds requirements Paolo Valente. LAV answers for Valeri’s questions (old) 1.List of hardware to control (HV, LV, crates, temperatures, pressure,
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
1 4 July 2006 Alan Barr - SCT DAQ Experience and plans from running the (SCT) DAQ at SR1 HEP Cosmics setup Running modes Problems Future.
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
1 Drift Tubes TC activities up to LS2 1.Implement remaining Phase 1 upgrades :  in USC ⁻ TwinMux ⁻ microROS 2.Refurbish HV & LV Power Supply Systems ⁻
1 Top Level of CSC DCS UI 2nd PRIORITY ERRORS 3rd PRIORITY ERRORS LV Primary - MaratonsHV Primary 1 st PRIORITY ERRORS CSC_COOLING CSC_GAS CSC – Any Single.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
TC meeting P2 planning wks 3&4 A.Tauro
for-windows-10
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
Pre-Processing electronics Maintenance Hardware - Firmware
CLAS12 DAQ & Trigger Status
ALICE Muon Tracking Upgrade
Enrico Gamberini for the GTK WG TDAQ WG Meeting June 01, 2016
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
ALICE Muon Tracking Upgrade EDR Answers
DT Infrastructure: LV, HV, Gas
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
November technical stop activities:
Pierluigi Paolucci & Giovanni Polese
The Troubleshooting theory
Presentation transcript:

Muon Tracking Meeting

SOR issue First priority Diagnostic: MCH DetectorScriptError Arriving at the initialization stage: the whole or part of a Crocus is in error Not coming from a particular Crocus During last TS, stabilization of SOR in Standalone runs by increasing the timeout of the script sequence and adding a second try for init => timeout and second init try also set for global partition runs but without success => In any case the origin of the problem is not completely identified => Problems with TCL encapsulated script in global mode: => solve the very large majority of SOR stops (several hours in TEST_3 partition without problems – 100 runs + technical runs..) => the origin of “real” SOR problems not solved …. But rare => In parallel, one suspects a not complete reset at one fpga level: => check at Orsay

EOR issue: busy during run Second priority (second cause of run stop due to MCH) Diagnostic: MCH DetectorBusy Arriving during a run: One (or several) Crocus is(are) stuck; cannot control it => run is stopped; decrease data taking efficiency Origin not yet found Not too much impact on data taking efficiency if we can Pause/Configure(Reset)/ Resume => PAC (Pause And Configure) has been tested successfully on ldc (locally) by Orsay and Filippo => during their stay, Orsay team will test PAC at P2 in global mode, with the help of Franco (includes some ECS commands like ttcinit…): sucessfully done but still little things to look on Franco’s side SYNC is an automatization procedure for the PAC, with (re-)synchronization of detectors Part of SYNC can be tested in local mode: => during their stay, Orsay team will contact Anton: successfully done in local mode Origin ?: at least need probes on DSP => probes and the whole setup (PC, probes power supplies, software..) have been fixed on one Crocus => we would like to see if the busy during run is coming from SEU (?) Setup tested successfully in B OFF Connection lost when switching ON the magnet => try to move a little more the transformer away from the magnet : can be done during short access => if it does not solve the problem of connection, a detailed inspection is needed: in this case we must enter FASS and we have to wait the next TS (end of June)

L1r issue Conflict when running with EmCal L1r Increase of deadtime as a function of rate Causes token loss error MCH can run in another configuration …. but has to be investigated => Test will be done soon at Orsay -Anton provided the sequence giving problem - a special fiber (between LTU and Fan out of Trigger Dispatcher) has been ordered and is now at Orsay: test can start

« New » issues SIU old product to be changed during next TS. It does not impact data taking in the meantime => Change done LV power supply has too high temperature on CH6L: switched OFF Will be changed during next TS or before during access Can be also flushed ? Last news: attempt to replace LVPS yesterday during access but: - problem with new LVPS : USB port not working - new problem on LVPS Crocus: one dead channel => 1 crocus not readable => 1 half-chamber CH9L => Need a new access (2h) to replace 2 LVPS (we have spares)

Long Shutdown LS1: 2013 – mid 2014

Work on slats Occupancy / busbar connections Large occupancy mainly due to bad busbar connections  Soldering bypass wire on -2.5 V line on each link between two busbar sections  During each winter shutdown (2 – 3 months), about 25 slats repaired ( 3 had been repaired during the previous winter shutdown) Winter : 24; Winter : 28 => Total 52 slats repaired; Total slats: 140 => ~ 90 remaining slats  at least 8 – 10 months of work ( year 2013)  Probably more: - station 3 more difficult and to be opened - more tests  each week : a team of 3 -4 people ( among them, ~ 2-3 » technical » people; at least 1 physicist knowing daq running)  Groups have to plan manpower and budget for this LS1  Manpower: technical + physicists  Budget: - mission budget for physicists - M&O B (and mission budget) for Technical staff  Discussion on M&O B during Muon IB

Work on slats ? Occupancy / MANU connections How to improve MANU / Translator connections ? Think about => Suggestions ? Parity errors (mainly on stations 3, 4, 5 but not only) Origin ? How to improve ? Suggestions ? Discussions with Orsay (Sylvain…) Tests in laboratories on spares ? Gas leakage Mainly due to not tight connections => be careful and check during mounting of slats (Improving slats leakage ?) => need gas during shutdown for check (Ar-CO2 not mandatory for a long period; but needed at some point for tests)

Work on quadrants Change / repair of quadrant => dismount quadrant Quad / PCB repair: problems on PCB ? MANU change Mechanical positioning of quadrants of station 2 Difficulties to position correctly Quadrants inclined => difficult to align => need to think and prepare new procedure, tools (Kolkata) Photogrammetry / survey Need to think how, where to add « mires » on quadrant: to improve alignment

Answers Rate limits: HV trips during B OFF run (very high background) – till only few trips Test of rates can be done now (?) Cooling system: no upgrade, improvement Gas system: no upgrade; we can reduce the flux but need gas to check leakage during slats/quadrant repairing Cables: no new cable to add Hardware intervention: see LS1 plans above Extension: no DCS, no network outlets, no rack Interlocks: OK