The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim.

Slides:



Advertisements
Similar presentations
Building Information Management (BIM)
Advertisements

Scope Seismic Retrofit of Building Replacement of three, 40 MW Generating Units Replacement of all Mechanical and Electrical Systems Rehabilitation of.
© 2012 Autodesk BIM Collaboration Siva Koppula Technical Consultant.
© 2011 Autodesk The e-SPECS® BIM Process Peter Marchese Microdesk, Senior Consultant.
What's in Your Structural Model? Understanding Detail-Level Requirements Using Revit® Structure Derek J. Gilbert, P.E. Senior Structural Engineer Foley.
EMPA Forum 2015 Workshop 3 - Endeavour BIM (Building Information Modelling) (2nd Lesson) & Using Augmented Reality February 2015.
BIM Management – A Strategic Approach
With LMG Secretariat Future Processing in the London Market Tim Carroll, Canopius LMG Forum, 29th January 2010 With London Market Group.
BIM Me Up, Scottie! The Next Generation in Construction Technology.
Chapter 18 Working Drawings.
The BIM Concept Drawings, building views, visualizations, calculations and quantity take-offs are automatically derived from the 3D model. BIM= Building.
Multimedia & Website Design Working in Teams. This week Look at team work issues in web design Plan file and directory conventions Introduce formal software.
ECM Project Roles and Responsibilities
Types of Drawings University of Palestine Eng. Nagham Ali Hasan
Design, Implementation and Maintenance
Remedy, a BMC Software company Storyboarding the User Interface: Blueprint for an Application Shanaz Kanga | Michele Sarko Sr. UI Design Engineer | Manager,
January 2013 BIM the cost of sustainability BIM And the cost of sustainability Delivering sustainability.
Database Administration Chapter 16. Need for Databases  Data is used by different people, in different departments, for different reasons  Interpretation.
BIM Overview. B uilding I nformation M odeling What does BIM Stand For?
CONSTRUCTION IT ALLIANCE CITA: ADDRESSING THE ICT CHALLENGES OF THE IRISH CONSTRUCTION INDUSTRY IN IRELAND Dr.Alan V. Hore Lecturer in Dublin Institute.
The BIM Project Execution Planning Procedure
Introduction to BIM BIM Curriculum 01.
Emerging Trends in Electronic Design and Construction April 2013.
Course Number Course Name Faculty Name University Logo T. Sulbaran & M. Shiratuddin - BIM for Construction Using ArchiCAD – Thomas Delmar Learning – ASC.
Pipeline Qra Seminar Title slide Title slide.
Complete and Integrated Lifecycle Management. Challenges 1.
Introduction to Information System Development.
Environmental Impact Assessment (EIA): Overview
Constructing the “Price” of the Technology in IP Licensing Negotiations Sub Regional Training Program on IP Valuation Maribor November 5 to 7, 2012.
Calculation BIM Curriculum 07. Topics  Calculation with BIM  List Types  Output.
Improving Design Workflow in Architectural Design Applications Presentation Doctoral Seminar 16/06/2006 Leuven (Belgium)
Roles and Responsibilities
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
Lecture 31 Introduction to System Development Life Cycle - Part 2.
LIANZA Sept Getting it together for libraries : Designing a collaborative learning centre Karen Kealy, Manager, Planning and Projects Information.
Software Project Documentation. Types of Project Documents  Project Charter  Requirements  Mockups and Prototypes  Test Cases  Architecture / Design.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Use of Administrative Data Seminar on Developing a Programme on Integrated Statistics in support of the Implementation of the SNA for CARICOM countries.
Database Administration
Chapter 6 CASE Tools Software Engineering Chapter 6-- CASE TOOLS
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
© 2013, published by Flat World Knowledge Chapter 10 Understanding Software: A Primer for Managers 10-1.
Construction Coordination BIM Curriculum 06. Topics  Problems of the Construction Industry  Objectives  The Virtual Construction Model  Benefits.
Indoor Reality Mapping the indoors, one step at a time
Overview of Building Information Modeling What does it mean for Civil Engineering?
(Winter 2016) Instructor: Craig Duckett Lecture 13: Thursday, February 18 th Mere Mortals: Chap. 9 Summary, Team Work 1.
Why BS 1192:2007? It’s the British Standard and code of practice for “Collaborative production of architectural, engineering and construction information”.
Copyright 2008, Open Geospatial Consortium Making Location Count The Quantity Take-off Thread Early Design Quantity Take-off.
BIM (Building Information Modeling) Revit Services - By Revit Modeling India
© 2009 Bentley Systems, Incorporated Intermediate Status Dec 8, 2009 FM Handover Aquarium (COBie2)
BIM October-2014Dr. Walid Al-Awad 1 Building Information Modelling.
Page 1 / DI Martin Moesl, M.A. Univ. Prof. DI Dr. Arnold Tautschnig Determining and controlling of the Life-Cycle-Yield in an early planning.
Chapter 12 Building Information Modeling. Chapter 12 Building Information Modeling.
BIM - a key to risk reduction or building and remodelling legal and insurance risks? 30 April 2015
DESIGN TOOLS UPDATE.
Design – BIM – Build – Operate
Management Information Systems
LIFE CYCLE COSTING IN BIM MANAGEMENT
IEEE Std 1074: Standard for Software Lifecycle
Project proposal for ISO 27001:2013 implementation
BIM - Building Information Modeling A well-structured BIM is a key to achieve success in the Building Design and Construction process. Qatar Green Leaders.
MEP CoordinationMEP Coordination and Clash Detection is Extremely Significant for BIM-Know Why.
The Challenges of Building Information Modeling (BIM)
Top Benefits of a BIM Consulting Firm for BIM Construction and the AEC industry Building Information ModelingBuilding Information Modeling or BIM Construction.
Add Engineering Value to your Project through BIM Preconstruction Services Preconstruction Services BIM Engineering U.S., L.L.C. – Best Preconstruction.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Dominant Improvements of BIM Modeling Services and Building Information Modeling Firms BIM Modeling Services Building Information Modeling Firms.
Lecture 23 CS 507.
Implementation Business Case
Presentation transcript:

The Influence of BIM on Quantity Surveyors Presented by: Syukri Zulkipli Alex Lim

Table of Content 1.BIM Introduction 2.Benefits of BIM 3.Barriers and Challenges of BIM 4.Current BIM Practice 5.Impact on QS Profession 6.Future of QS

BIM Introduction What is BIM? 3D BIM, 4D BIM, 5D BIM, 6D BIM, etc? Common misconception: – BIM is just a Software – BIM will replace Quantity Surveyors – BIM can do measurement with a single click – BIM can generate BQ with a single click Building Information Modelling (BIM) is the process of generating and managing the data of a building throughout its lifecycle

Benefits of BIM Collaboration – Shared single building model or several coordinated model – Effective communication of ideas and actions – Faster decision making process Visualization of Architect’s Design – Easier to establish client’s requirements – Clients can virtually walk around their building – Generate multiple “what if” scenarios – Identify potential on-site problems/critical areas earlier

Benefits of BIM (cont…) Accurate Estimations – Quantity takeoff directly from the model – BIM requires high quality, reliable and integrated information about the project – Reduction of human error

Barriers and Challenges of BIM High Initial Cost – Training, software and hardware upgrade – Especially for smaller firms – Firms are not willing to make an investment Lack of Standards – Interoperability issue due to different software – Important due to the large data exchange – Required to ensure efficient implementation

Barriers and Challenges of BIM (cont…) Resistance to Change – Individuals and firms have their own preferred system, software application and processes – Companies assume that their existing system are adequate Legal and Contractual Issue – Issue of ownership of the building model and intellectual property rights – Lack of clear understanding about the roles and responsibilities

Current BIM Practice a.BIM Applications b.5D BIM– Quantity take off c.5D BIM– Take off labelling d.5D BIM– Cost certainty e.Golden rules of 5D BIM Sources of information: 5D BIM Seminar at Kuala Lumpur on 22 nd ~ 23 rd January 2015

a. BIM Application Clash detection and report Design visualisation & study Construction coordination modelling Construction phased schedule Quantity take off Cost planning Documentation/ specification management Design analysis – Energy, Solar, Wind, CFDs.. Facility Management X Quantity Production Rate + Location = Schedule Quantity X Cost/Unit + Markup = Cost

b. 5D BIM– Quantity Take Off Third party 5D BIM software: – Glodon – Vico – Buildsoft – Autodesk Revit – Cost X

b. 5D BIM – Quantity Take Off

5D BIM – Quantity Take off labelling Take off the Primary quantity from BIM (e.g. Length of Beam, Length of Walls, Height of column Extract primary quantity into work sheet Convert primary quantity to secondary quantity for use of BQ

5D BIM – Quantity Take off labelling Walls: Qs Tag: Lvl1-IW-C = 7m LocationElementTypeThicknessPrimary Qty Input height Secondary Qty (BQ) Level 1Internal Wall Con. Grade mm thick 7m3m21m2 Columns: Qs Tag: Grd~1st-C30-300x300 = 3m LocationElementTypePrimary Qty (Height) LengthWidthSecondary Qty (BQ) Ground to 1st ColumnCon. Grade 30 3m0.3m 0.27m3

5D BIM – Quantity Take off labelling LocationElementTypeSlab thickness Primary Qty Girth = Width + (Height- slab)x2 Secondary Qty (BQ) Level 2Upper floor beam Con. Grade mm thick 10m (0.5 – 0.15)x2 8.5m2 Beams (Formwork): Beams (Concrete): Qs Tag: Lvl2-UP-C30-150X = 10m LocationElementTypeSlab thickness Primary Qty Input width x (depth-slab) Secondary Qty (BQ) Level 2Upper floor beam Con. Grade mm thick 10m0.15 x (0.5 – 0.15) 0.525m3

d. 5D BIM - Cost Certainty Quantity Take off Supplier/ Manufacturer Fabricated and install on site Lower the risk of redesign Creating cost certainty

d. 5D - Cost Certainty

e. Golden rules of 5D BIM i ) Accurate geometry ii) Model the way it’s built iii) Define rooms and departments correctly iv) Give the 5D QS an early look at your model

e. Golden rules of 5D BIM Nice to have: i)Correct model base point ii)Define objects with correct level / storey iii)Use proper object tool (i.e. column tool) iv)Checking for objects within objects v)Consistent naming conventions – resist editing vi)Include a classification code

Current BIM Practice Other consultants provide the model? – Willingness to provide the file – Do we trust the model? – Is the model made in accordance to SMM? QS to produce the model? – Takes more time? – Modelling and measurement at the same time – Can be used for valuations – Can be used for future purposes

Impact of BIM on QS Are QSs still required? – Automated quantity takeoff and BQ Production – Other profession to undertake QS role? – BIM does not produce BQ with a single click – Assist the cost estimating process – Would other profession want to take responsibility?

Future of QS The role of QS will continue to evolve BIM and ICT will have a great impact Important to understand our core competencies How much of the changes can we influence It is not “Why should we use BIM” The question should be “How do we use BIM”

Questions?