I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.

Slides:



Advertisements
Similar presentations
Some things cant wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Advertisements

I-805 Southbound Auxiliary Lanes I-805 Transit Only Lanes South Bay Bus Rapid Transit I-805 North Project I-805 Middle Project I-805 South Project SR-94.
Managed Lanes Development Strategy Phase I District Four October 17, 2012.
Getting Started with Congestion Pricing A Workshop for Local Partners Federal Highway Administration Office of Operations.
THE 2012 FINANCIALLY CONSTRAINED LONG-RANGE TRANSPORTATION PLAN (CLRP) AND THE FY TRANSPORTATION IMPROVEMENT PROGRAM (TIP) Transportation Planning.
San Diego I-15 Integrated Corridor Management Project Update Caltrans External Advisory Liaison (CEAL) July 16, 2014.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
I-15 MANAGED LANES Building on Success Institute of Transportation Studies’ Center for Urban Infrastructure March 7, 2003.
NCTD/SANDAG Project Update Capital Improvement Program Bill Prey, P.E., LOSSAN Corridor Director San Diego Association of Governments RELATED TO AGENDA.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
January 31 st, 2012 North Coast Corridor A Better Environment for the Future.
CFEE Conference March 23 rd, 2007 By: Jim Madaffer State & Local Authority What We Have, and What We Need.
I-15 Managed Lanes: Building on Success And Lessons Learned I-15 Managed Lanes: Building on Success And Lessons Learned.
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 San Diego’s.
February 26, 2012 Managed Lanes Overview Dr. Adrian Moore Vice President Reason Foundation
1 Interstate 405 Update. 2 Presentation Overview  Share public perceptions and provide information  Answer frequently asked questions related to express.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
TRB Lianyu Chu *, K S Nesamani +, Hamed Benouar* Priority Based High Occupancy Vehicle Lanes Operation * California Center for Innovative Transportation.
Jeffrey F. Paniati Associate Administrator for Operations Federal Highway Administration Department of Transportation Enabling Congestion Pricing in the.
75 Express Lanes Segments A&B Construction From NW 170 Street to South of Miramar Parkway Community Meeting Presentation Tuesday April 28, 2015.
Externalities on highways Today: We apply externalities to a real-life example.
1 1 Providing New Transportation Choices through Transit Prioritization Strategies BRT ON MANAGED LANES or PARK & RIDE on HOV LANES.
Freedom to work Freedom to text Freedom to read.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Tolling and Congestion Pricing Patrick DeCorla-Souza Office of Innovative Program Delivery Federal Highway Administration Presentation to Transportation.
National Road Pricing Conference June 4, 2010 Mark Burris, Texas Transportation Institute Jessie Yung, Federal Highway Administration.
Orange County Business Council Infrastructure Committee December 14, 2010 Draft Long-Range Transportation Plan Destination 2035.
Performance Analysis Presentation to the National Capital Region Transportation Planning Board (NCR-TPB) November 28, 2012 Adopted: July 18, 2012 Item.
I-680 Value Pricing: A “Smart Carpool “ Lane Demonstration Project June 2004.
Pat Bursaw, Minnesota DOT International Partnership Meeting Washington D.C. January 26, 2012.
What are Managed Lanes What are Express Lanes What are HOT Lanes Regional Express Lanes Network I-95 Express I-595 Express I-75 Express.
Center on Tolling Research Technology for Managed Lanes Christopher Poe, Ph.D., P.E. Assistant Agency Director Director, Center on Tolling Research Texas.
Urban Road Pricing: US DOT Congestion Initiative and Urban Partnerships 14 th World Congress on ITS IBEC Special Session October 10, 2007 Beijing Exhibition.
Route 1 Project Study Report Overview. A report that describes the transportation problem and identifies the project scope, schedule and estimated cost.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Some things can’t wait for traffic Capital Beltway HOT Lanes Project New Travel Choices Ahead.
Managed Lanes CE 550: Advanced Highway Design Damion Pregitzer.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Transportation leadership you can trust. presented to 12 th Annual TRB Transportation Planning Application Conference presented by Dan Goldfarb, P.E. Cambridge.
US DOT Congestion Initiative Urban Partnership Agreements I-95 Corridor Coalition EPS Summit September 19, 2007 Boston, Massachusetts Jeffrey F. Paniati.
MnPASS I-394 High Occupancy Toll (HOT) Lanes Case Study 7 group: Brendon Slotterback Chris Romansky Feng Xie Gabe Gubash
Weighing the Scenarios: The Costs and Benefits of Future Transit Service Produced for MTDB by The Mission Group © 2000 by The Mission Group. 1 Dave Schumacher.
US DOT Congestion Initiative Urban Partnership Agreements NTOC Summer Meeting September 7, 2007 Washington, DC Jeffrey F. Paniati Associate Administrator,
THE EL MONTE HOV / BUSWAY: A Policy Driven Experiment in Congestion Management Frank Quon Division of Operations Deputy District Director HOV LANES IN.
1 Weekly Supervisor Meeting – Project Waalbrug Project Waalbrug Improving transport accessibility in Nijmegen Bernat Goni, Vikash Mohan, Arjen van Diepen,
I-394 MnPASS Express Lanes Project Update Guidestar Board Meeting September 7th, 2005.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Managed Lanes and Bus Rapid Transit: Emerging New Financing Opportunities ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Ed Regan Senior Vice President.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Minnesota’s Urban Partnership Agreement UPA Timeline The UPA agreement with the US DOT requires that the project be operational by September 30, 2009,
Interstate 95 Managed Lanes PD&E Study (95 Express) Project Development and Environment Study SE FSUTMS Users Group The Corradino Group November 2, 2007.
IH-10 Managed Lanes Project: A “Public-Public” Partnership ENGINEERS PLANNERS ECONOMISTS Wilbur Smith Associates Presented at the Value Pricing Conference.
MED SR 18 Corridor Project MED PID October 13, 2015.
LUAS Cross City Brendan O’Brien Roads & Traffic Department.
Garden State Parkway HOT Lanes By Matt Lawson October 14, 2010.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
I-66 OUTSIDE THE BELTWAY Shrevecrest HOA JUNE 21, Susan Shaw, P. E
Monet & Treviana HOA ― Construction Open House November 17, 2016
Charlotte Region Fast Lanes Study
Four Winds Condominium Association August 2, 2017
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
TVTC Impact Fee Update Nexus Study January 30, 2008
District 3 Complete Streets Projects
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
The Oakton Condominium Association September 12, 2017
I-66 Outside the Beltway Design Public Hearing Meetings November 13, 14 & Susan Shaw, P.E., Megaprojects Director Virginia Department of.
Harbour Island Force Main Replacement
Presentation transcript:

I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012

The lanes are managed by varying the price for SOV’s based on capacity. High Occupancy Vehicles (HOV) and Transit can use the lanes for free, and single occupant vehicles (SOV’s) can use them for a fee. Express Lanes Overview Interstate 15 Corridor Looking north at Miramar Road The Express Lanes is a 4-lane freeway within a freeway from SR-163 to SR-78, built in the median of I-15. A moveable barrier allows the lanes to be configured to accommodate traffic flow.

Completion Timeline Middle Segment: Opened September 2008: SR-56 to Rancho Bernardo Road Opened March 2009: Rancho Bernardo Road to Centre City Parkway South Segment Opened June 2011: SR-163 to SR-56 North Segment Opened January 2012: Centre City Parkway to SR-78 Interstate 15 Corridor Del Lago Transit Station Sabre Springs/ Peñasquitos Transit Station Miramar College Transit Station / 2009 Rancho Bernardo Transit Station Escondido Transit Center

Direct Access Ramps/ Bus Rapid Transit Stations Middle Segment: 3 Stations / 3 Direct Access Ramps North Segment: 1 Station / 1 Direct Access Ramps South Segment: 1 Station / 1 Direct Access Ramps South of SR-163: 2 Stations Interstate 15 Corridor

Plans to increase capacity at Sabre Springs/Peñasquitos: Four-story parking structure proposed to add 500 parking spaces, to augment the existing 150 spaces, by late 2013 Transit Stations Interstate 15 Corridor View looking west at the Rancho Bernardo DAR and Transit Station Allow for increased parking for carpoolers, transit users, and vanpoolers at key locations along the corridor. Incorporate bus bays and other transit station furnishings, such as benches and overhead covering.

Decreased Travel Times Average peak hour travel time in 1999 from SR-78 in Escondido to SR-163 in San Diego averaged 50 minutes. Average peak hour travel time in 2010 from SR-78 in Escondido to SR-163 in San Diego averaged 25 minutes. Interstate 15 Corridor More HOV Users Number of Express Lanes users in September 2008 at Bernardo Center Drive was 11,600 (9,100 HOV). Number of Express Lanes users in September 2011 at Bernardo Center Drive was 25,821 (21,184 HOV).

Future Mira Mesa Direct Access Ramp Looking East Interstate 15 Corridor The Mira Mesa DAR and Miramar College Transit Station project is scheduled to begin construction in the Summer of 2012.

Work on SR-78 Interstate 15 Corridor The Westbound auxiliary lane opened to traffic on January 19, Replacement of Nordahl Road Bridge is scheduled to begin February An Eastbound auxiliary lane (not shown) began construction January 2012.

Summary: Four lane, twenty mile Express Lane facility in the median of I-15, from SR-163 north to SR-78. North Segment opened January South Segment opened June Middle Segment opened September 2008/March. Features Intermediate Access Points and Direct Access Ramps Bus Rapid Transit system will operate in Visit for the latest project information. Interstate 15 Corridor

I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012 Questions?