DO TMDL Subcommittee Meeting June 19, 2012. A Bit of History (2008-2009) Summer-Fall 2008 BAP discussion begins Study Proposal formulated Summer-Fall.

Slides:



Advertisements
Similar presentations
Standards Review Subcommittee Update May 12, 2009.
Advertisements

1 Stormwater Program Videoconference April 23, 2013 Bill Cole, Water Quality Standards Unit.
Update on Regional Haze November 15, 2012 Michele Notarianni EPA Region 4 1.
Spokane River Dissolved Oxygen Total Maximum Daily Load WRIA 54 Planning Unit Drea Traeumer, Spokane River TMDL Lead February 28, 2007.
“Universe” of potential phosphorus for trading Tributaries (Hangman, Little Spokane, Coulee) Mainstem groundwater Lake Spokane groundwater/surface water.
General Permits Schedule Update Water Quality Partnership Meeting May 19, 2005 Dewey Weaver.
IDEM TMDL 101 Everything you wanted to know about Total Maximum Daily Loads.
Chesapeake Bay Restoration An EPA Perspective Jeff Corbin Senior Advisor to the Administrator U.S. EPA.
Chubaka Producciones Presenta :.
National Pollutant Discharge Elimination System (NPDES) Permitting and Pesticides Jeff Fischer Permits Section Water Resources Division
Compensatory Mitigation in Coastal Louisiana Keith Lovell, Administrator Office of Coastal Management Department of Natural Resources 10/03/121.
Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia 1 – 5 July 2013 Thirty Eight APEC Transportation Working Group Meeting, Bali, Indonesia.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
2010 Water Quality Assessment MARINE WATER Presented by Mike Herold.
Update: Spokane River DO TMDL Implementation ________________________ David Moore Washington State Department of Ecology Eastern Regional Office.
Developing Final Phase II WIPs and Milestones Katherine Antos Chesapeake Bay Program Office Jenny Molloy Water Protection Division DC Draft Phase II WIP.
Overview of WQ Standards Rule & WQ Assessment 303(d) LIst 1 Susan Braley Water Quality Program
Policy Considerations in the Lower Poplar River Turbidity TMDL Study Greg Johnson, Karen Evens, and Pat Carey, Minnesota Pollution Control Agency, St.
Oxon Run and C&O Canal TMDLs
Water Supply Planning Initiative State Water Commission November 22, 2004.
John Stem 7 th Annual Summit on VR PEQA Louisville, Kentucky.
Working with Stakeholders in Developing Watershed and Water Quality Models: The Dos and Don’ts Well, at least some of them! Presented by: Brian J. Watson,
C hesapeake Bay EPA TMDLs & State WIPs: Implications for Local Governments Presentation to Water Resources Technical Committee November 12, WRTC.
Michigan Department of Education Office of Field Services Consolidated Application Schedule.
Business Practices Subcommittee Update Executive Committee Meeting February 18, 2014.
Tool Box Implementation Schedule DO TMDL Subcommittee Meeting June 19, 2012.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
1 Chesapeake Bay Program Management Board Meeting March 6, 2012 Discussion for the Final Evaluation of Milestones.
Phase II WIP Background & Development Process Tri-County Council – Eastern Shore June 2,
Developing Final Phase II WIPs and Milestones Jim Edward EPA Deputy Director Chesapeake Bay Program Office DDOE Meeting with Federal Partners February.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Presentation to the Chesapeake Bay and Water Resources Policy Committee July 30, 2010.
EPA Chesapeake Bay Trading and Offsets Workplan June 1, 2012.
James W. Beever III Southwest Florida Regional Planning Council 1926 Victoria Avenue Fort Myers, FL ( , ext 224)
- DCWAC - Where we’ve come from, Where we are, Where we’re headed.
Preparing for 2017 RA Update March Tampa Bay Reasonable Assurance Update Annual assessment of water quality and attainment status of chl-a.
MIG 2 - Water Quality and Quantity Study Plan Review April 2, 2008.
TGDC Meeting, July 2011 Voluntary Voting System Guidelines Roadmap Nelson Hastings, Ph.D. Technical Project Leader for Voting Standards, ITL
Point Source Loads and Decision Criteria for Toxics Modeling Baltimore Harbor TMDL Stakeholder Advisory Group September 10, 2002.
API 17N (and Q) Subsea Production System Reliability, Integrity, and Technical Risk Management.
Proposed ASB Actuarial Standard of Practice on Statements of Actuarial Opinion Regarding Property/Casualty Loss and Loss Adjustment Expense Reserves Status.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Business Practices Subcommittee Update Executive Committee Meeting April 29, 2014.
Water Resources Technical Committee Chesapeake Bay Program Overview & Updates July 10, 2008 Tanya T. Spano.
Overview of the Total Maximum Daily Load Program.
District Collaboration Grant Requirements November 17, 2015.
MSRA Implementation Status Update. 2 Implementation Strategy Divide tasks Priority 1 – Due date specified in the Act Priority 2 – Required, but no due.
APA CONTRACTS TO POST-2017 ALLOTTEES July 24 - Letter to all Allottees Inviting Comment August 10 - Allottee Response August 21 - Workshop August 28 –
Middle Fork Project Relicensing Process Plan April 25, 2006.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Update to Proposition 1E – Early Implementation Project (EIP) Application and Local Share Reclamation Board Sub-Committee Meeting September 11, 2007.
1 Understanding the ICIS-NPDES Policy Statement Betsy Smidinger, Deputy Director Enforcement Targeting and Data Division Office of Compliance Office of.
Lenoir County Public Schools New North Carolina Principal Evaluation Process 2008.
Wastewater Treatment and Disposal Upgrade Nampa Wastewater Advisory Group Meeting #10 October 9, 2012.
Task Force Activities We are working together on a new approach that identifies sources of PCBs and dioxins, directly applies a plan for reduction and.
Proposed Bay TMDL Schedule
Business Practices Subcommittee Update
Needs Assessment An integrated set of procedures that provide the basis for an action plan, whereby user needs can be efficiently addressed in a cost-effective.
ICIS-NPDES Expanded Steering Committee Meeting EPA Opening Remarks
McDonald’s calendar 2007.
Academic Program Review Comprehensive Report
February 2007 Note: Source:.
Review of the 1958 Agreement
Living Donor Committee
Presentation title What lies ahead… Bonn, Germany, 3–4 November 2010
McDonald’s calendar 2007.
Fire Emissions Joint Forum
2015 January February March April May June July August September
Citizens Advisory Committee EPA/CBP Program Update Jim Edward Deputy Director Chesapeake Bay Program Office February 20-21,2019 Williamsburg, VA.
Presentation transcript:

DO TMDL Subcommittee Meeting June 19, 2012

A Bit of History ( ) Summer-Fall 2008 BAP discussion begins Study Proposal formulated Summer-Fall 2009 Quality Assurance Project Plan developed Spokane Regional Wastewater Phosphorus Bio- Availability Study Initiated Samples collected summer 2009-spring 2010

A Bit of History (2010) September 2010 Draft Report submitted to Ecology and EPA for peer review and comments provided Ecology review/comment/decision on incorporation into engineering plan and 2 nd cycle of permits scheduled for 2 nd Quarter 2012 November 2010, ECY states: The model is the basis for quantifying credits The model will be adjusted on factors that increase allocation (i.e., BAP) at the 10 year assessment December 2010, first “Final Report” completed Formal comments provided by Ecology (1/20/2011)

A Bit of History (2011) February 2011 Second “Final Report” completed Response to comments received from UW (2/11/2011) Formal comments provided by EPA (2/25/2011) Response to comments received from UW (2/28/2011) Formal response provided by EPA (3/01/2011) Discussions Not enough data to integrate BAP into permits “Next steps” subcommittee formed Dischargers concerned about “certainty” Ecology and EPA acknowledge need for regulatory decision

A Bit of History (2011) April 2011 Discussions about IEP studies and BAP research “2-bucket” vs. “3-bucket” phosphorus models Ecology’s commitment to use of the “2-bucket” TMDL model IEP as the “poster child” for a modified permit limit Ecology made another request for IEP’s orthophosphate data June 2011 – Washington NPDES permits issued

Conclusion “no matter who decides to pursue BAP, modeling with modified BAP inputs has to be consistent with the TMDL model and cannot negatively affect Avista’s DO responsibility found in Table 7 of the TMDL.”

2012 March - April Bioavailable Phosphorus Workshop Request from SRSP to Ecology to fund additional studies Proposed Scope of Work submitted to Ecology Outstanding questions Did original study meet the goals of the QAPP? Were the comments submitted by Ecology and EPA adequately addressed? Have Ecology’s requests for data been met?

Status Reviews to be completed by June 30, 2012 Line by line evaluation of comments submitted by Ecology and EPA to UW and responses Review of study for adequacy with the QAPP Review of Ecology requests from DO TMDL meeting notes Evaluation of the proposed Scope of Work with respect to EPA and Ecology expectations.