22AUG07 Gun System Update1 Rich Andrews. 22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet.

Slides:



Advertisements
Similar presentations
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
Advertisements

CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
128 April 2008 Spectrometer Solenoid Fabrication Update MICO Meeting 19 May 2008 S. Virostek, M. Zisman LBNL.
David H. Dowell Injector RF Design November 3, LCLS Injector RF Gun: Design, Fabrication & Tuning Plans D. H. Dowell,
Update on Be Wall Cavity Steve Virostek Lawrence Berkeley National Lab MTA RF Workshop November 15, 2010.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Richard F Boyce Injector UpdateL0-1 Accelerator 3 November L0-1 Design, Manufacturing & Testing R. F. Boyce, SLAC.
Placing Order Approval Process Manufacturing Delivery SUBMITTAL PROCESS.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
LSU 01/18/2005Project Life Cycle1 The Project Life Cycle Project Management Unit, Lecture 2.
Release & Deployment ITIL Version 3
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
RF Cavity / Coupling Coil Module
Module 1 Unit 2 Project: writing an advice letter --By Zhou Zhenghu No
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
The Trimble Store and Passcodes. Introduction to Trimble Store  This presentation will: –Explain what the Trimble Store offers you –Why you need to be.
Status of RFCC-Module Development Derun Li Center for Beam Physics Lawrence Berkeley National Laboratory MICE Collaboration Meeting at INFN-LNF, Frascati,
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
RICH WG M.Lenti. Outlook Mirror Support Vidyo meeting on June 12, 20, 27 and on July 4 and 11 RICH WG meeting on august 27  Vessel status (see Ferdi’s.
Department of Education User Kick Off Jun 02, 2011 Team Georgia Marketplace™
How to start Milestone 1 CSSE 371 Project Info There are only 8 easy steps…
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Low Emittance RF Gun Developments for PAL-XFEL
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
15 October 2013 CHANTI Status Report F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino Università.
AP-1 5. Project Management. AP-2 Software Failure Software fails at a significant rate What is failure? Not delivering it on time is an estimation failure.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
News on mechanics Photon veto F. Raffaelli INFN – Sezione di Pisa CERN, January r 02 th, Status of tender Anti Status of the supporting.
THE PROJECT LIFE CYCLE PROJECT MANAGEMENT LIFE CYCLE LSU 01/18/2005 PROJECT LIFE CYCLE 1.
Flavio Gatti,Frascati-PSI, Jan 31 th, 06 1 TC status. Flavio Gatti UNIVERSITY and INFN of Genoa, Italy.
Literacy Through Photography Goods and Services in our community!
Progress to Date PPPL Advisory Board Meeting May 20101NSTX Upgrade – R. L. Strykowsky CD-0 Approved February 2009 The NSTX Upgrade Project organization.
CONSTRUCTION Andrea d'AURIA PH / DT-DI / GAS.
F Photoinjector for the ILC test facility at Fermilab Sergei Nagaitsev Fermilab May 24, 2007.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
Curtis A. Meyer 20 May, 2004 GlueX Detector Infrastructure The issue of infrastructure includes details of how we assemble the detector as a whole. How.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Managed by UT-Battelle for the Department of Energy SCL Vacuum Control System Upgrade Derrick Williams
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
22 October 2005MICE Meeting at RAL1 Tracker Solenoid Overview Michael A. Green Lawrence Berkeley Laboratory MICE Collaboration Meeting 22 October 2005.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
SPHENIX MECHANICAL D. Lynch August 21, /15/2014sPHENIX Mechanical Design.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Status of MICE RF for Step V’ (at LBNL) Derun Li Lawrence Berkeley National Laboratory December 6, 2014.
Magnetized Beam LDRD: Design Tasks February 19, 2016.
Nextef status and expansion plans Shuji Matsumoto for KEK Nextef Group /5/51 4th X-band Structure Collaboration Meeting, CERN.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
1.I interaction with VakuumPraha using basic drawings. We made a deal for 19'310 EUR + tax for two vacuum chambers plus the compensation system, we provide.
Ti/SS transitions A.Basti INFN-PISA*
Complementary ISTC Projects #3888, 3889p
SIS100 quadrupole status S. Kostromin, H. Khodzhibagiyan, G. Trubnikov, FAIR 11th MAC, GSI, May,
We’ll be spending minutes talking about Quiz 1 that you’ll be taking at the next class session before you take the Gateway Quiz today.
Injector Performance Requirements Conventional Facilities Update
LCLS Injector: Introduction D. H
HIE-LINAC status report
LARP Phase II Secondary Collimator RC-0 and RC-1
NSS Instrument Project Tollgate Coordinator
PNPI – M3R4 – Panels 70% - HV bars 100% - FR4 frames 100%
Globus-M2 will be constructed by the end of 2015
JLEIC SRF update SRF team
Presentation transcript:

22AUG07 Gun System Update1 Rich Andrews

22AUG07 Gun System Update2 Gun System Coaxial coupler Gun Cavity Solenoid Magnet Compensator Magnet

22AUG07 Gun System Update3 Overall Status Coupler drawings: complete, assembly process reviewed in house, detailed questions developed, ready for approval Cavity drawings: nearly complete, assembly process to be reviewed 1:00 PM OFE Cu: The Hitachi order is due 21SEP07 Solenoid Magnets and Power Supplies: Sole Source Purchase Request has been submitted. Can expect a delivery 7 months ARO.

22AUG07 Gun System Update4 Gun Cavity DESY Cavity (note from Klaus; 16AUG07) –The first brazing of the cavity, i.e. the cooling channels of the inner iris is already done. –The company wants to start with the final turning of the cavity cells and they want to do all three parts in a row. –They need the design for the cathode area now! –If we don't release it now, the whole production needs to be delayed. –I think we have discussed enough. –All points are made. –It will be your cavity, so you just have to decide. –Please let me know how to proceed! Fermi Cavity –Plan to begin construction of the cavity in October Coupler/Waveguide Assembly –Should also be ready to begin construction in October –May need to procure some additional OFE Cu (but not the Hitachi Grade)

22AUG07 Gun System Update5 Existing Cathode Configuration Watchband Type Canted Coil Spring Type

22AUG07 Gun System Update6 Mockup of Cathode: Version 3 Mockup of Cavity Backplane Mockup of spring retainer plate Spring Cathode

22AUG07 Gun System Update7 Cathode Status Detailed plan for cathode configuration received from INFN 12JUL07 Later note from Carlo expressed the need to have details of the spring design and groove to proceed with productive discussions. Detailed information was sent to Bal Seal on 25JUL07, and required several exchanges to make sure they understood our needs. Bal Seal is proceeding with their 104 series spring in 316SS, gold plated, keeping the cathode diameter at 17 mm., and adjusting the groove to fit I am expecting this information from Bal Seal as early as today (after out last discussion yesterday) Once we have the groove data, we can complete Prototype 3 in the shop (by Friday if we have the groove data today) Bal Seal is also trying to get a spring for us (of any material but correct geometry) on a similar timescale It makes sense to me to complete this step before proceeding at DESY

22AUG07 Gun System Update8 Bal Seal Groove Design (submitted 22AUG07)

22AUG07 Gun System Update9 Other Gun System Elements Structural Support –We are only beginning to think about this –Plan to use Lucy Nobrega to develop this element –The scope of this task should be expanded to include support of both Gun and Cathode Systems –Should provide for ability to move both systems either together or independently –Will need to develop the interfacial supports between cathode boxes, solenoid magnets, gun cavity and coupler 10 Way Cross –Have asked Lucy to handle this as well –She will start by understanding the role of each port –I plan to discuss this with Klaus during next trip (drawings, procedures) Micromover –Little has been done with this to date –We have the general write-up describing the concept –Have a few photos from last trip –Plan to develop a contact and obtain drawings during next trip –Have discussed this a little with Klaus Dark Current Kicker –We have made a contact with Frascati, and they understand our desire to take a look at their design and obtain drawings of the kicker and especially the feedthru. Absorber –Initial studies only –Could look at the DESY design as well if it would be helpful?

22AUG07 Gun System Update10 Cathode System Preparing to ship 4 ion pumps, 2 dual channel power supplies and associated cables, along with the 5 VAT valves purchased last October I have received no status updates from INFN.

22AUG07 Gun System Update11 Laser Mirror in the Diagnostics Cross How is this piece made, installed and sealed? What about this seal?

22AUG07 Gun System Update12 10 Way Cross and Absorber at DESY

22AUG07 Gun System Update13 10 Way Cross and Absorber