Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.

Slides:



Advertisements
Similar presentations
Construction Surveys
Advertisements

Abstract Mechanical Inspection and Survey Steven Seiler, NSLS-II Project The Survey and Alignment Group is often the first and last to work with the Storage.
TPC meeting, NBI, 2-3 September 2002Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, Copenhagen, 2-3 September 2002 Børge Svane Nielsen, Jørn.
TPC meeting, CERN, 7-8 October 2003Børge Svane Nielsen, NBI1 Status of laser system TPC meeting, CERN, 7-8 October 2003 Børge Svane Nielsen, Niels Lindegaard,
Session 2 LAND SURVEYING EQUIPMENTS Course: S0663 – Land Surveying Year: 2007.
The Comparison of API T3 and Leica AT401 in the Test and Survey CAI.Guozhu MAN. Kaidi Institute of Modern Physcis,CAS The 13 th international Workshops.
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Use of a commercial laser tracker for optical alignment James H. Burge, Peng Su, Chunyu Zhao, Tom Zobrist College of Optical Sciences Steward Observatory.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
High index glass spherical targets for laser interferometry Miroslav Sulc 1st PACMAN worshop 1.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
MICE Alignment and Support Structure Tony Jones and Yury Ivanyushenkov Engineering Department RAL.
Angular measurement 1. Line of sight – the join of the points S and P Horizontal direction – the intersection between the vertical plane  i where is.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
Setup of laser tracker on DX side NOTE: X axis along M1s centers, towards SX Z axis along M1-M2 centers, towards M2.
Integration and Alignment of Optical Subsystem Roy W. Esplin Dave McLain.
Surveying I. Lecture 3..
TT Assembly Structure Reference-Reinforcement System: 1.Description of the system 2.Assembling Procedure 3.Production Project Board, march 2005 D.Orlandi.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
The Laser Reference Line Method and its Comparison to a Total Station in an ATLAS like Configuration. JINR: V. Batusov, J. Budagov, M. Lyablin CERN: J-Ch.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Basic Principles of Coordinate Measuring machines
LASER AND ADVANCES IN METROLOGY
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
Brewer Ozone Spectrophotometer Pointing and Levelling C.T. McElroy York University Canada.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
Structural Drafting Connection Details and Gages.
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
The stabilisation of the final focus (StaFF) system Sun 12 th March 2006 MDI – LCWS06 at I I Sc Bangalore David Urner, Paul Coe, Armin Reichold.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
SPring-8 (1436 m) since 1997 XFEL (700 m) From 2011 Hiroaki Kimura 1,3 ), Masafumi Yamashita 2 ), Yusuke Maeda 2 ), Yoshifumi Tsukamoto 2 ), Noriyoshi.
A.) Scalar - A single number which is used to represent a quantity indicating magnitude or size. B.) Vector - A representation of certain quantities which.
SURVEY EXISTING TECHNIQUES AND REQUIREMENTS Jean-Christophe GAYDE, Pascal SAINVITU (CERN EN-MEF-SU-EM) Infrastructure For LHCb Upgrade Workshop February.
Recommendations on Supports and Adjustment systems for ESS LINAC Components Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
INSTRUMENTS USED IN PLANE TABLE SURVEYING.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin Mechanical Group, Accelerator Division Institute of High Energy Physics 13 th International Workshops on Accelerator.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
GOVERNMENT ENGG. COLLEGE B.E Semester III :- Civil Engineering
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
The Alignment of DTL in CSNS Institute of High Energy Physics, CAS KE Zhiyong
on behalf of the CLIC active pre-alignment team
Application and Research on the 3-D adjustment of control network in particle accelerator Luo Tao
Recent developments on micro-triangulation
Chapter 1: Precision Survey Properties and Techniques
Workshop on Tau-Charm at High Luminosity
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
LCLS Undulator Fiducialization
The Storage Ring Control Network of NSLS-II
Total Station Surveying
FAIR magnets fiducialisation WP 7.5
SPEAR Summer/Fall Downtime Alignment Schedule
Surveying With Construction Applications, 7th Edition
Coordinate Plane y axis x axis.
INSTITUTE OF HIGH ENERGY PHYSICS CEPC Survey and Alignment
Adjustment of the 3 reference tables at building 180 AT960 measurement
Simplified Procedure Draft
Presentation transcript:

Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015

22 Based on 3D free stationing technique with least squares adjustment calculus Instrumentation: laser tracker, total station, digital and optical levels, 3D Arm, GPS, metrology software. Two reference networks connected: - One outside Geodetic Pillar Network (mm accuracy) Measurements: GPS, Total Stations, Digital Levels. - One internal reference network (0.1 mm accuracy) Measurements: Laser Trackers, Total Stations, Digital Levels Survey & Alignment Strategy at ESS

3 LASER TRACKER Measure angles in vertical and horizontal planes + distances some models measure in interferometry mode 1.5” PRISMs TRIPOd Laser Trackers 10 m diameter Accuracy below ± 50 micrometres

4 Fiducialization Process 4 Fiducialization : report the sensitive part or axis of a component to external references used to align the component. Mechanical axis used for construction / assembly Sensitive Axis: magnetic axis, accelerating axis… Fiducials to receive prism Laser tracker Fiducialization Bench

5 Fiducials ESS H7 Machined Hole Cone directly machined on the component Assembly glued with M6 Hole 1,5” Prism Cone Part M6 Part

6 Nominal beam axis No Forced Centering for instruments We place the instruments where convenient Alignment Process

7 Fiducials REQUIREMENTS Quantity Placement Line of sight Type Goal: Get the fiducials implemented in the design

8 Next Step Fiducialization Report Should contain : Fiducialization Process ( instrument used, sensitive part measured) Data : 3D coordinates of the fiducials expressed in a defined coordinate system

9 Thank You