National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Model development.

Slides:



Advertisements
Similar presentations
1 EIONET water workshop 12 October 2005 Developments in EEA needs in water quantity data Philippe Crouzet AIR/SAG.
Advertisements

Land-use and Land-cover Change Issues Related to Dams Stephanie Bohlman and Michael W. Binford Department of Geography University of Florida Image source:
The Mekong River - survival for millions Lake Tonle Sap Mekong Delta Mekong Delta Wetland.
CHARACTERISTICS OF RUNOFF
Hydrological Modeling for Upper Chao Phraya Basin Using HEC-HMS UNDP/ADAPT Asia-Pacific First Regional Training Workshop Assessing Costs and Benefits of.
Famine Early Warning System Network (FEWS NET) Venkatesh Merwade Kristi Shaw.
Hydrologic Measurement
Hydrologic/Watershed Modeling Glenn Tootle, P.E. Department of Civil and Environmental Engineering University of Nevada, Las Vegas
Engineering Hydrology (ECIV 4323)
1 River Processes and Morphology A Case Study of the Souteyran valley.
Soil Water Assessment Tool (SWAT) Model Input
DHI’s Water Modeling and GIS DHI formally Danish Hydraulic Institute VKI formally Water Quality Institute have merged into DHI - Institute for Water and.
Opportunities for Development of a Global Water Information System David R. Maidment, University of Texas at Austin Definition of an information system.
Map Modernization Management Support Best Practices Project - FEMA State of Idaho Idaho Department of Water Resources Boise, Idaho November 2008.
Nam Songkhram model application and field work National consultation with TNMC 20th of April 2006, Bangkok MRCS WUP-FIN.
Applying Methods for Assessing the Costs and Benefits of CCA 2 nd Regional Training Agenda, 30 September – 4 October 2013 Priyanka Dissanayake- Regional.
FNR 402 – Forest Watershed Management
Dr. R.P.Pandey Scientist F. NIH- Nodal Agency Misconception: A DSS takes decisions ---(No)
Hydrologic Cycle. Hydrologic Cycle Processes Surface Water Soil water Atmospheric water Groundwater Processes Precipitation Evaporation Surface Runoff.
1 Flood Hazard Analysis Session 1 Dr. Heiko Apel Risk Analysis Flood Hazard Assessment.
Watershed Management Water Budget, Hydrograph Analysis
August 20th, CONTENT 1. Introduction 2. Data and Characteristics 3. Flood analysis 1. MOUSE 2. SOBEK 3. ARC-SWAT 4. Conclusions and suggestions.
MRC Water Utilisation Programme 20 May 2003 Knowledge Base & DSF Software Presenter: Dr Jon Wicks, Software Integration Specialist in association with.
Washburne HWR203The University of Arizona Watersheds Reading: –Discussion: issues facing Arizona’s rivers Lecture: – How you identify a watershed – Why.
Assessment of Hydrology of Bhutan What would be the impacts of changes in agriculture (including irrigation) and forestry practices on local and regional.
WUP-FIN training, 3-4 May, 2005, Bangkok Hydrological modelling of the Nam Songkhram watershed.
CE 424 HYDROLOGY 1 Instructor: Dr. Saleh A. AlHassoun.
Outline of the training. 6 October 2005, TNMC, Bangkok.
National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Bank erosion study.
Engineering Hydrology (ECIV 4323)
Chanchai Vitoolpanyakij Director Department of Drainage and Sewerage Bangkok Metropolitan Administration Coastal Cities and Adaptation to Climate Change:
River flow modeling of the Mekong River Basin A.W. Jayawardena Department of Civil Engineering The University of Hong Kong
Understanding hydrologic changes: application of the VIC model Vimal Mishra Assistant Professor Indian Institute of Technology (IIT), Gandhinagar
The NOAA Hydrology Program and its requirements for GOES-R Pedro J. Restrepo Senior Scientist Office of Hydrologic Development NOAA’s National Weather.
WUP-FIN2 socio - economic and policy analysis WUP-FIN2 Introductory Training – Bangkok MARKO KESKINEN & OLLI VARIS.
South Platte Decision Support System Colorado Water Conservation Board and Division of Water Resources.
FLOOD ROUTING Siti Kamariah Md Sa’at School of Bioprocess Engineering, UniMAP.
BASINS 2.0 and The Trinity River Basin By Jóna Finndís Jónsdóttir.
Description of WMS Watershed Modeling System. What Model Does Integrates GIS and hydrologic models Uses digital terrain data to define watershed and sub.
Vientiane – Nong Khai modelling status National consultation with TNMC 20th of April 2006, Bangkok MRCS WUP-FIN.
Afghan Water Task Progress Report September 7, 2006 EROS Data Center, Sioux Falls, SD Gregg J. Wiche Doug G. Emerson U. S. Geological Survey Bismarck,
FLOOD MAPPING Menaxhimi i rezikut te permbytjeve Objektivat Gjenerale.
DATA ACQUISITION DATA PROCESSING DATA MODELLING VALUE ADDITION JOURNEY OF RTDSS FROM DATA COLLECTION TO DECISION MAKING 4.
Panut Manoonvoravong Bureau of research development and hydrology Department of water resources.
Nam Songkhram model application and field work MRCS WUP-FIN.
Introduction to Urban Hydrology
DEVELOPMENT OF A CELL BASED MODEL FOR STREAM FLOW PREDICTION IN UNGAUGED BASINS USING GIS DATA P B Hunukumbura & S B Weerakoon Department of Civil Engineering,
Mekong River Commission Information System/ “WUP-FIN Phase III” Concept The information system development is critical activity for maintaining the MRCS.
DIRECT RUNOFF HYDROGRAPH FOR UNGAUGED BASINS USING A CELL BASED MODEL P. B. Hunukumbura & S. B. Weerakoon Department of Civil Engineering, University of.
ERT 246 Hydrology & Water Resources Eng.
Sanitary Engineering Lecture 4
WATER RESOURCES DEPARTMENT
Simulation of stream flow using WetSpa Model
Basin characteristics Instrumentation and data Measured hydrological
Engineering Hydrology (ECIV 4323)
Change in Flood Risk across Canada under Changing Climate
Distributed modelling
Map-Based Hydrology and Hydraulics
Introduction to Urban Hydrology
Predicting the hydrologic and water quality implications of climate and land use change in forested catchments Dennis P. Lettenmaier Department of Civil.
Flood Monitoring Tools 2011 OFMA Annual Conference
Paimionjoki River Basin
Streams Hydrodynamics
EC Workshop on European Water Scenarios Brussels 30 June 2003
Hydrology CIVL341.
Preciptation.
Engineering Hydrology (ECIV 4323)
Hydrology CIVL341 Introduction
Engineering Hydrology (ECIV 4323)
by B. M. Gawlik, L. Galbiati, J. Zaldivar, G. Bidoglio
Presentation transcript:

National Consultation with TNMC 3 May 2005, Bangkok WUP-FIN Phase II – Model development

2 Nam Songram watershed area Area: km2 Elevation: min 135 m amsl max 675 m amsl

3 Tools 2D distributed hydrological model coupled with a 1D hydrodynamic river, reservoir and lake model Physical model of the application area that takes into account variability in elevations, soil properties, vegetation, land use etc. Run through a GIS-type graphical user interface 1D lumped hydrological model HBV 3D hydrodynamic model

4 Nam Songkhram application areas

5 VMod model structure Flow from grid boxes obove overflow interflow kerros 2 kerros 1 Pintakerros Evapotranspiration ground water flow Flow to river Soil layer 2 Soil Layer 1 Surface layer Wilting point Field capacity Maximum capacity Precipitation One grid box computationModel grid & flow network

6 Data Digital elevation map for the land area with 50 m resolution from old topographical maps and new SRTM elevation model with 90 m resolution (MRC) Hydrographic atlas for Mekong mainstream, bathymetry of the river (MRC) The older (1997) and new (year 2002) land use data (MRC). Soil types (MRC) Location of river networks (MRC) Precipitation from 16 stations at or near the watershed (MRC)

7 Data Temperature (daily minimum and maximum temperatures) from one station at the watershed and a few further away (MRC) Evaporation from three stations at or near the watershed and a few further away (MRC) Discharge and water level observations form two points on the watershed: Ban Tha Kok Daeng and Nam Oon dam Discharge and water levels from the Mekong mainstream river Nakhon Phanom measured water levels and discharges Discharge from DSF to 3D model upper boundary condition in Mekong mainstream

8 Elevation km2 heights min 135m max 675 m

9 Landuse/Irrigated area 89% of landuse agriculture irrigated 3280 km 2 (25% of catchment)

10 Soils ~40 % acrisol ~40 % plinthic acrisol low water retention and conductivity

11 Weather data 16 precipitation stations Temperature data from at least one station Evaporation, few stations

12 Modelling 1km model grid (resolution can be increased) flow network computed from DEM 16 landuse classes 10 soil classes irrigation and rice agricultural practice not yet taken into accont

13 Model user interface

14 Computed flow at Ban Tha Kok Daeng compared to measured data Preliminary flow computation with VMod

15 3D hydrodynamic and WQ application 3D hydrodynamic model coupled with a water quality model 3D hydrodynamics flood arrival time, duration and depth in different locations of the modelled area, other flood characteristics Water quality: sediment concentration, net- sedimentation, oxygen, etc Run through a GIS-type graphical user interface

16 Input data for the 3D model River and floodplain topography Hydrographic atlas data river cross-sections for Nam Songkhram digital elevation map (DEM) for floodplain Boundary conditions Upstream discharge and water level in Mekong Upstream dishcarge in Nam Songkhram Downstream rating curve (in Mekong) Landuse Wind (Precipitation)

17 Digital elevation model and model area

18 3D view on the wetlands

19 Inundation on Sept 2000

20 3D model grid for NSK model

21 3D model grid for NSK hydrodynamic model

22 Model animation window

23 Output Tool to understand the hydrology of the Nam Songkhram watershed Scenarios Landuse Climate change Irrigation development Reservoir development Floodplain dynamics with the 3D model application Interaction between Nam Songkhram and Mekong

24 Requested data Socio-Economic data Statistical or spatial district/commune level data (preferably from many years to see trends) on primary &secondary occupations, particularly on fish- related livelihoods population, including rural/urban population &migration poverty. + info on other reports related to above mentioned issues.

25 Requested data Hydrological, hydrodynamic and water quality model data: Cross section data for Nam Songkhram and other tributaries including areas from both banks and floodplain: survey by DEDP in 1993 or 1994 Water level and discharge data and rating curves from the Nam Songkhram basin: Nam Songkhram at Ban Chai Buri and Ban Tha Huai Lua Nam Oon at Ban Phok Yai, Pannanikom and Bang Nong Bua Nam Yam at Akat Amnuai and Ban Khon Sai Huai Khong at Ban Tha Sri Chomchun Huai Hi at Ban Nong Yang Nam Mao at Ban Kham Hai Water level at stations measured by NEDECO in with temporary gauges. Irrigation data: irrigation practices, location of pumping stations, discharge of pumping in each station, project area and location, etc. Ground water levels from as many wells as available Detailed data (height, storage capacity, bridge dimensions etc.) from existing control structures (dams, weirs, dikes, bridges, road embankments, gates) in the basin.

26 Expected inputs from the MRCS modelling team and Thai partners Collection and basic processing of existing data Active participation in training, field measurements and modeling activities Scenario modeling Participation in field measurement data and modeling results processing Participation in reporting and publication of results Project resources for any specific local application are quite limited. Because of this, applications must get strong local support in form of work force and data collection.

27 More information: Content of the project’s two phases Personnel & contact details Documents downloadable Training portfolio: presentations, documents, exercises

MRCS/WUP-FIN