MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1.

Slides:



Advertisements
Similar presentations
Robert J. Feuerbach Jefferson Lab Constructed from contributions from the HAPPEX Collaboration Hall A Collaboration Meeting December 5, 2005 HAPPEX-II.
Advertisements

Lead ( 208 Pb) Radius Experiment : PREX E = 1 GeV, Elastic Scattering Parity-Violating Asymmetry PREX : precise measurement of the density -dependence.
Measuring the Neutron and 3 He Spin Structure at Low Q 2 Vincent Sulkosky for the JLab Hall A Collaboration College of William and Mary, Williamsburg VA.
1/22 MOLLER Juliette M. Mammei. 2/22 Working Groups Polarized Source Hydrogen Target Spectrometer Integrating Detectors Tracking Detectors Polarized Beam.
Hall A Status Hall A Collaboration Meeting June 9, 2011 Robert Michaels Acting Hall A Leader Recent Activity Publications (please write archival papers.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
EPAC June 2003 The EPAC June 2003 Questions 1. Clarify the Motivation for the Proposal. 2. How to ensure the e+ polarimeter works right away? 3. What is.
1 Hall A Update Thia Keppel APEX Collaboration Meeting April 2015.
SHMS Detector Commissioning and Installation Howard Fenker Hall-C Users Meeting Jan-2015.
PN12 Workshop JLab, Nov 2004 R. Michaels Jefferson Lab Parity Violating Neutron Densities Z of Weak Interaction : Clean Probe Couples Mainly to Neutrons.
SBS Program Management John J. LeRose SBS Collaboration Meeting October 18,
Jefferson Lab Status Bob McKeown July 17, April 2015 Outline 12 GeV Project and Commissioning PAC Budgets and Schedule LERF Planning MOLLER, SoLID.
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010.
Jefferson Lab Status Hall A collaboration Dec. 16, 2013 R. D. McKeown Deputy Director For Science.
Proton Form Factor ratio GEp/GMp with polarization method --on behalf of Jefferson lab GEp3 collaboration Wei Luo Lanzhou University, China April
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
2014 DVCS Run Preparations DVCS and GMP Symbiosis Charles Hyde.
Thomas Jefferson National Accelerator Facility Page 1 IPR October 18-20, 2011 John J. LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
WBS1 SBS Basic: Magnet and Infrastructure Robin Wines 11/4/ SBS DOE Review.
UK Hadron Physics D. G. Ireland 10 October 2014 NuPECC Meeting, Edinburgh.
John LeRose March 12, A Program of three “projects” to assemble the Super BigBite Spectrometer for a series of experiments in Hall A There is a.
Hall A Collaboration, June 10, 2010, 1 Operated by the Jefferson Science Associates for the U.S. Department Of Energy Thomas Jefferson National Accelerator.
Thia Keppel 9/24/12. Accelerator schedule excerpts (Arne Freyberger) Accelerator Run II: Beam in hall 3/2014, or maybe as early as 1/2014 (?) > 1.1 GeV/pass,
SBS Management John J. LeRose Project Manager. Good News/ Bad News We are an official DOE program (project(s), whatever…) – Good because we are more likely.
Contractor Assurance System Peer Review April Page 1 NSTAR 2011 May 16, 2011 Jefferson Lab Hugh Montgomery.
Thomas Jefferson National Accelerator Facility R. D. McKeown Slide 1 R. D. McKeown Jefferson Lab College of William and Mary The 12 GeV Science Program.
Preparation for E Pi0 Collaboration Meeting Tuesday Feb R.Lindgren.
A1n Meeting R. Michaels, May 24-25, 2012 Welcome !! Recent Activity in Hall A Schedule for Early Beam in Hall A My task list for July 1 New Hall A leader,
DVCS with Positron Beams at the JLab 12 GeV Upgrade
Thia Keppel 6/4/13 Hall A Update. Near term accelerator schedule – same as last meeting Accelerator Run II: Beam in hall 3/2014, or maybe as early as.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
Vina Punjabi Norfolk State University Hall A Collaboration Meeting June 10-11, 2010 GEp-V Experiment to Measure G Ep /G Mp.
Lecture 9: Inelastic Scattering and Excited States 2/10/2003 Inelastic scattering refers to the process in which energy is transferred to the target,
Thomas Jefferson National Accelerator Facility Hall C Commissioning: The Past (1996) First Exp: “by consensus” What Hampton Univ. wanted What ANL wanted.
SLAC, September 25, 2009 Searching for a U -boson with a positron beam Bogdan Wojtsekhowski Thomas Jefferson National Accelerator Facility  The light.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
SOLID: View from Hall A Robert Michaels, Acting Hall A Leader Issues to Discuss Schedule of Experiments Procedures to Decide Schedules Budget and Manpower.
Measuring the Spin Structure of 3 He and the Neutron at Low Q 2 Timothy Holmstrom College of William and Mary For the Jefferson Lab Hall A Collaboration.
1 JLab Users Group Meeting May 29, GeV Program and Preparations PAC Status 4-Hall Running Experiment Readiness Reviews & Experiment Preparation.
Jefferson Lab Overview Bob McKeown April 20, 2015.
Test of the GEM Front Tracker for the SBS Spectrometer at Jefferson Lab F. Mammoliti, V. Bellini, M. Capogni, E. Cisbani, E. Jensen, P. Musico, F. Noto,
The 12 GeV Physics Program at Jefferson Lab R. D. McKeown Jefferson Lab College of William and Mary PTSP 2013 – Charlottesville, VA September 9, 2013.
Compton polarimetry for EIC. Outline Polarized electron beam Compton process Compton polarimeters at Jefferson Laboratory – Parity experiments at Jlab.
E & E status report Maxime DEFURNE CEA-Saclay/Irfu/SPhN 1.
PREX Mtg, July 2008R. Michaels, JLAB Warm Septum : Status Septum Team: Kees deJager, Paul Brindza, Javier Gomez, John Lerose, Al Gavalya, & me New Design.
Early Career Internal Review Upgrade and development for calorimetry for Deeply Virtual Compton Scattering Alexandre Camsonne November 18 th 2011 VI. Nuclear.
John J. LeRose 1.  Roles/Responsibilities/Organization  Approach  Goals and Objectives  Scope  Schedule  Funding profile  Risk management  EH&S.
Hall A Installation Review John J. LeRose 2/25/2009.
Early Career Internal Review Measurement of Double DVCS using SuperBigBite Spectrometer Nuclear Physics Alexandre Camsonne.
Septum Magnets in Hall A Hall A Collaboration Meeting 6/10-11/2010 John J. LeRose.
Moller Polarimeter Q-weak: First direct measurement of the weak charge of the proton Nuruzzaman (
Thomas Jefferson National Accelerator Facility Page 1 IPR September 28-30, 2010 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab.
NUMI NUMI/MINOS Status J. Musser for the MINOS Collatoration 2002 FNAL Users Meeting.
Early Career Internal Review Research and development in superconducting detectors and associated electronics for high rates experiments. Study of radiation.
Thomas Jefferson National Accelerator Facility Page 1 John LeRose Independent Project Review of 12 GeV Upgrade Jefferson Lab September 22-24, 2009 Physics.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Depart. Of Energy The Department.
Hall A Update Thia Keppel User Group Board of Directors January 2015.
Pb-Parity and Septum Update Presented by: Luis Mercado UMass - Amherst 12/05/2008 Thanks to Robert Michaels, Kent Pachke, Krishna Kumar, Dustin McNulty.
Status of Polarimeters and Polarized Targets: what are the plans for development of polarized targets to meet the needs of the Day 1 and future experimental.
Hall A Infrastructure and the Moller Parity Experiment “AMPEX”
Accelerator Issues Raised in Hall A Parity Collaboration Meeting, April B-Team Meeting April 29, 2009.
Operations Department
Operations Department
View from Lab Management HPS Collaboration Meeting
Hall C – this week Time Period Plans 10/24-10/27 Target cool down
Schedule Rolf Ent HPS Meeting, May 22, 2018.
PREX / CREX Collaboration Meeting and Status
Hall C Beamline Upgrade
SOLID Collaboration Meeting
Presentation transcript:

MOLLER Collaboration Meeting May 2014 Hall A Update Thia Keppel 1

Hall A Planning 16 mo. Shutdown Early Experiments 12 GeV Commissioning SuperBigbite Spectrometer Beam 1 st to Hall A FY 2015 FY 2013 FY 2016 FY 2014 FY 2017 SBS Experiments SBS Project DVCS-I and G M p 3 H/ 3 He APEX/PREX (A1n) 11 GeV EM Form Factor Dark photon A’/Neutron skin Both require additional small angle septum magnets EM Form Factors at high Q 2 3 A-rated experiments in first years of running G M p (HRS-R) and DVCS (HRS-L + calo) run is combined Some flexibility incorporated 12 GeV Projects: 1. Moller polarimeter 2. Compton polarimeter 3. Energy measurement upgrade Neutron spin structure Polarized 3He target commissioning beam 2 Access to GPDs Photon calorimeter to be installed on floor d/u at High x Requires tritium target, venting system and BigBite spectrometer

3 There was (checkout) beam in the Hall weeks ago!

4 Hall Base Equipment Checkout Activities Beamline upgrade successful HRS Detector checkout successful Spectrometer optics checks Moller commissioned (Roman’s talk) Cryotarget functional Trigger, DAQ, software up and running Hall not always priority, beam delivery not constant Didn’t achieve high current CW Short run HRS magnet troubles

Electrons in Right HRS spectrometer at 2.0 GeV/c on carbon target and set beam energy of 6.1 GeV!

Electrons in Left HRS spectrometer at elastic kinematics on hydrogen target and set beam energy of 4.8 GeV – reproduces proton mass 2 Thank you everyone who sat shifts and helped out!

Beam Energy Determination (The nominal beam energy was 4890 MeV.) 7

Moller Polarimetry 8 accelerator estimate: / /-1.7 % Thank you everyone who sat shifts and helped out!

Hall A Projected Experiment Schedule as of 7/2013 SpringFallSpringFallSpringFallSpring Hall checkout (DVCS –I/ GMp) DVCS - I/ GMp checkout DVCS - I/ GMp 3 H/ 3 He A 1 n APEX PREX CREX A 1 n APEX PREX CREX DVCS-II MOLLER, SOLID… SBS Experiments in italics, being further out in time, have less scheduling certainty and could be rescheduled amongst the 2016,2017 run periods. The 2017 period shown indicates a potential time for any not yet run available at: hallaweb.jlab.org/wiki/index.php/Main_Page#12_GeV_Era_Run_Schedule

10 MOLLER won’t be on the table.

SBS Project Status - 48D48 Magnet (+ support steel) delivered from BNL - Steel modifications complete - Power supply ordered - GEM prototyping successful, production underway - Successful annual review 11/ Program proceeding on schedule - PMT-based coordinate detector option UVa GEM lab has started SBS module production 48D48 magnet delivered to JLab 8/13 Several engineering/design tasks complete

MOLLER Preparing for Science Review this spring Cost estimates, facilitated design work –Magnet –Beamline –Target –Collimator (Superconducting) Moller and Compton polarimetry –Moving to more common platform for Halls A and C 12

We’ve also had administrative changes… Jefferson Lab reduction of force and restructuring Hall A and C science staff are combined –Organizing into expertize groups that combine staff from both Halls (for instance detectors, beamline,…) –In progress, meetings still ongoing –Moving offices over next couple weeks New dual-hall spectrometer support group Engineering and technical staff remain Hall-specific 13

Questions? 14

15 April – November 2015

16