LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES SERVICES DIVISION FACILITIES CONSTRUCTION CONTRACTS THE DISTRICT’S PREQUALIFICATION PROGRAM PRESENTED BY:

Slides:



Advertisements
Similar presentations
“Opening the Door to Bonding” U.S. Small Business Administration Surety Bond Guarantee Program.
Advertisements

Prequalification in 2014 Nancy Taylor Cate Boskoff Orbach Huff Suarez & Henderson LLP.
U.S. Pretrial Services and Probation Office Northern District of Ohio.
Presented by: Kathryn Hodges, NH
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
Hispanic Contractor’s Association de San Antonio/OSHA.
WELCOME TO THE INDUSTRIAL COMMISSION SELF-INSURANCE SEMINAR.
Commonly Seen Errors In Department Audits And How To Fix Them.
INDOT Contractor Prequalification.
Minimizing Workers’ Compensation Costs Information for Businesses.
SB 854 – Public Works Contractor Registration Program
10-1 © 2010 The McGraw-Hill Companies, Inc. All rights reserved.
Nearly 50 American workers are injured every minute of the 40-hour work week and almost 17 die each day (OSHA) In 2003: 111 million workers at 7 million.
Introduction to OSHA Occupational Safety and Health Administration.
Marcy Mealy Procurement Specialist CDBG Program
Contractor Safety Management
October 9, 2013 Labor Compliance Department Boot Camp Presentation 1 Presented by:Andres Posada Angela Kwong.
ALABAMA IMMIGRATION LAW COMPLIANCE GUIDELINES. ALABAMA IMMIGRATION LAW COMPLIANCE GUIDELINES FOR BUSINESS ENTITIES, EMPLOYERS DOING BUSINESS WITH THE.
WELCOME! SBE Boot Camp LEARN HOW TO BID JOB ORDER CONTRACTS (JOC)
Welcome to the 2015 Prevailing Wage Survey Tutorial This tutorial will assist you in the process of completing Survey Forms. If you still have questions.
Division of Child Care STARS Interim Report. What is an interim report? Programs participating in the STARS for KIDS NOW program must demonstrate continued.
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
H OW T O R ENEW Y OUR C ERTIFIED N URSE A SSISTANT ( CNA ) H OME H EALTH A IDE ( HHA ) C ERTIFICATE.
Office of Business Development Training
SURETY BOND GUARANTEE PROGRAM. What is a Surety Bond? Agreement between: Business/Contractor Surety Company Obligee (Project Owner) The types of contract.
BUILD WITH US. ™ Contractors
Sole Source Training.
Loss Control Program Compliance Audits An overview of the purpose and procedures of program auditing.
Chief Executive Office Risk Management RETURN TO WORK Unit
Davis-Bacon, Related Acts, and Your Project Where you can locate the information needed to comply with Davis-Bacon and Related Acts 1.
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts Contract Closeout Application.
Federal Work Authorization Program and OSHA Requirements Established by State Law Government Regulations Affecting Lee’s Summit Bid Submittals.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Cal-OSHA and Labor Code Understanding the Law And Its Consequences
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts LAUSD Contracts Application.
The Contractor Development Program
The OSH Act, Standards, & Liabilities
October 2014 Labor Compliance Department Boot Camp Presentation 1 Presented by: Huin Chhay & Aaron Leung.
SSB Finance for Purchasing Workshop. Workshop Agenda  Online Documentation  Purchasing Rules and Guidelines  How to Avoid Common Errors When Entering.
"A" LETTERS TIME AND MATERIAL Obtains the agreed rate for the time and materials to be charged, a maximum amount not to be exceeded prior to starting.
LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES SERVICES DIVISION FACILITIES CONSTRUCTION CONTRACTS THE DISTRICT’S PREQUALIFICATION PROGRAM PRESENTED BY:
This PowerPoint has been produced for the public and is made available for non-commercial use (e.g. toolbox meetings,
Third Party Verification Services. Who are these people?  These are 3 rd party verification companies hired by large companies, often called Owner.
Contract Training Class I
1 Los Angeles Unified School District Facilities Services Division Facilities Contract Services/ Facilities Construction Contracts LAUSD Contracts Application.
“Your Open Door to Bonding”. In 1971, the SBA launched a program to assist small, emerging and disadvantaged contractors to obtain surety bonds that were.
Return to Work 101 Injury Reporting May 14th, 2009 Presented by: Cathy Stein-Romo Chief Executive Office Risk Management/WC Unit (213)
OSHA – What to Expect When You’re Inspected (Following Federal Guidelines)
KIMBERLY FRELOW SMALL BUSINESS PROGRAM MANAGER Facilities Contracts Small Business Program Small Business Enterprise/We Build.
San Marino Unified School District Contracts Presentation Presented by: Wesley Lee, Budget Analyst October 28, 2015.
October 2015 Labor Compliance Department Boot Camp Presentation 1 Presented by: Jessica Tam.
1 OSHA Recordkeeping  New rules and forms take effect January 1, 2002  Importance of records Critical indicators Starting point to identify problems.
Hunter Douglas Corporate Safety Conference
LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES SERVICES DIVISION FACILITIES CONSTRUCTION CONTRACTS THE DISTRICT’S PREQUALIFICATION PROGRAM PRESENTED BY:
Please read this before using presentation The Department of Mines and Petroleum (DMP) supports and encourages reuse.
JEFFREY L. HUNTER SR RISK ANALYST County of Riverside Human Resource Dept. Risk Management Div. Insurance Requirements In Contracts.
Section 3 Opportunities Employer Registration and Job Posting Instructions.
SHPIP Shea Homes Partnership Insurance Program SheaHomes Southern California November 8, 2010 Presented by: Tommy Tso, Director of Risk Management Jack.
What are the DCC-413 and DCC-414 and how do they pertain to me? The STARS Interim Report.
The Basics of Bonding & The Contractor Development Program Presented By: Navid Barkhordar.
Dallas Area Rapid Transit Pre-Bid Conference Solicitation No. B Bus stop Amenity Cleaning April 13, 2016.
Manage Subcontractors
Construction Oversight
Texas Health Care Network - Employer Presentation
Oral statements or discussion during the Pre-Bid Meeting will not be binding, nor will they change or affect the IFB or the terms or conditions within.
OSHA Recordkeeping New rules and forms take effect January 1, 2002
Vendor Management The Pre-Qualification Package and You!
Instructions for New Contractors Construction Division
Diversity management system (DMS)
Presentation transcript:

LOS ANGELES UNIFIED SCHOOL DISTRICT FACILITIES SERVICES DIVISION FACILITIES CONSTRUCTION CONTRACTS THE DISTRICT’S PREQUALIFICATION PROGRAM PRESENTED BY: CIMONE WATSON – TONY GOMEZ PREQUALIFICATION UNIT

Prequalification Program It is the intent of the District to do business with quality contractors by identifying such contractors through a uniform system of rating bidders to obtain the best quality construction for the lowest price practicable under the circumstances. The District’s prequalification programs are adopted pursuant to Public Contract Code , and Requires all contractors interested in bidding either formal or informal, competitively bid public works projects to prequalify before submitting a bid to the District Provides standard on-going prequalification enrollment for prospective bidders

Prospective Bidders Interested in Bidding on INFORMAL District Projects: Informal District contracts, $83,400 or less, are bid through the Local District Maintenance & Operations Offices. Information on Informal contracts may be found on the LAUSD M & O Web Contacts and telephone numbers to the Local M & O offices are located in the Construction Bidder’s Handbook, available on the web site at Prospective bidders interested in bidding on Informal District contracts only need to be Safety prequalified. The Safety Questionnaire may be obtained by visiting the Prequalification site/prequalification/forms. Submit Informal Questionnaires directly to Prequalification by fax to or to

Construction Contractor Safety Prequalification Contractor Applicant Overview For the LAUSD School Repair and Construction Program

This presentation will walk you through the four sections of the Safety Prequalification Questionnaire. You have a copy of the Safety Questionnaire in your handouts and may begin filling it out as we go through this presentation. However, in most cases, you will not be able to complete the entire Questionnaire today. You will likely need to ◦ (a) contact your Insurance Carrier or Broker, and ◦ (b) review company files to complete the Questionnaire.

IMPORTANT NOTE: The Safety Prequalification only applies to firms performing construction work for the School Repair and Construction Program. It does not apply to suppliers, vendors and service contracts.

Prequalification is valid for one (1) year. Each firm must reapply prior to expiration. If your firm is seeking to renew, your firm’s safety and loss history will be considered during the renewal process. The Safety Questionnaire is the same for both Formal and Informal Prequalification.

Basic Requirements Your firm must have a current and valid California Contractor’s License in good standing with the California State License Board. The name of the firm applying for Prequalification must be the same name that is on the license.

Basic Requirements Your firm must have a current Workers’ Compensation insurance policy. The policy must be in the same name as the firm that is applying for Prequalification. You will be required to provide proof of coverage in the form of a Certificate of Insurance.

General Notes Fill in every blank. Write “N/A” if not applicable. Make sure your answers are legible. If it can’t be read, it can’t be processed! Evaluation of your Questionnaire will not be completed until all information is complete and all fields are properly filled out. Do NOT send us anything we don’t ask for.

Contractor Information Questionnaire Header

Insurance Information Section A

The Experience Modification Rate (EMR) is a multiplier based on your firm’s Workers’ Compensation loss claim history that causes your insurance premiums to go up, or down. It impacts the cost of your firm doing business. Base Rate x EMR = Your insurance cost What is the EMR?

Where does EMR come from? The EMR is not calculated by your insurance broker or carrier. California (intrastate) EMRs are calculated by the WCIRB (Workers Compensation Insurance Rating Bureau). Interstate EMRs are calculated by NCCI (National Council on Compensation Insurance).

In simple terms, the EMR is a ratio of actual claims dollars incurred by your firm compared to the industry average value for firms that do the same kind of work you do. ◦ Good history causes it to go down. ◦ Adverse history causes it to rise. It is desirable to have an EMR < 1.0. ◦ 1.0 is considered to be “average”.

If you DON’T have an EMR: You must provide copies of your firm’s Workers’ Compensation Loss Runs for each of the last three years, along with your questionnaire. Contact your Insurance Carrier or Broker to obtain your Loss Runs. If you are a brand new company you will have neither an EMR nor loss runs. Please note this in writing on the questionnaire.

What the EMR means to you: Let’s say you, Fred, are bidding against Joe and Bob. ◦ Your EMR is 1.0, ◦ Joe’s is 0.5, and ◦ Bob’s is 2.0.

Let us also assume that your bids are identical with respect to time, material and labor hours, and include $10,000 as the manual (base) rate for Workers’ Comp. ◦ Your insurance would cost you $10,000. ◦ Joe would pay $5,000 for the same insurance. ◦ Bob would pay $20,000 for the same insurance.

Who gets the job? ◦ JOE! Who says safety doesn’t pay?

You can learn what your EMR is (if you have one) by contacting your Workers’ Compensation Insurance carrier. We will verify your answers. Applicant may be disqualified if either its (a) current EMR, or (b) average EMR for the most recent three-year period, is above 1.00, in which case, the District will determine, based on information submitted, whether Applicant has satisfied the requirements of Section A.

Enter one (1) NAICS code Incidence Rates: Section B

If you don’t know your firm’s NAICS Code, visit the Facilities Vendor Registration web site at: Click on “View NAICS” to see a list of codes, or Type specialty trade in Primary box to get applicable code.

Incidence Rates... …are based on employee injuries and illnesses and total company man-hours per CALENDAR YEAR, not insurance policy year. They: ◦ are not based on OSHA inspections or citations/violations. ◦ can be computed for every contractor EVEN IF THERE ARE NO OSHA ‘RECORDABLE’ CASES.

A work-related injury or illness must be recorded if it resulted in: ◦ Death or dismemberment ◦ Loss of consciousness ◦ Days away from work ◦ Restricted work activity or job transfer ◦ Medical treatment beyond first aid Specific information on how to evaluate whether an incident is to be considered OSHA recordable can be found at

Refer to your OSHA 300 Logs and/or your Loss Runs and injury/illness records to determine the number of injury cases you have incurred. Company hours is the total sum of all work hours by all employees (including those of a sole proprietor/owner) for the calendar year. Complete all information in this section of the questionnaire! Fill in every blank EVEN IF THE ANSWER IS “0.” Information Used for Calculating Incidence Rates

The formula used to calculate the incidence rates was established by the U.S. Department of Labor - Bureau of Labor Statistics. ◦ It’s been around for decades – it’s THE standard formula for everyone. Calculating Your Incidence Rates

Your rates are compared against the national average rates for your NAICS code. See Table 1 at When an employer calculates the company’s rates, the answer is a rate of incidents (injuries) per 200,000 hours (100 people working 8 hours a day, 50 weeks a year) - regardless of how many hours the contractor worked!

In 2006, a company has 1 OSHA recordable injury which did not involve lost workdays. The company worked 30,000 hours that year. ◦ The Total Case Incidence Rate is: (1 x 200,000) / 30,000 = 6.7 ◦ The Lost Workday Case Incidence Rate is: (0 x 200,000) / 30,000 = 0 ◦ The No Lost Workday Case Incidence Rate is: (1 x 200,000) / 30,000 = 6.7 Sample rate calculations:

A company has 4 OSHA recordable injuries in a Three cases were lost-workday injuries. One case did not involve lost workdays. The company worked 30,000 hours that year. ◦ The Total Case Incidence Rate is: (4 x 200,000) / 30,000 = 26.7 ◦ The Lost Workday Case Incidence Rate is: (3 x 200,000) / 30,000 = 20 ◦ The No Lost Workday Case Incidence Rate is: (1 x 200,000) / 30,000 = 6.7

If you are a new firm, please add a note on your forms that informs us of this. A new firm will be expected to have very few, or possibly no, company hours. We will verify this by checking the effective date of your Contractor’s License.

OSHA Citation History Section C

This section looks at your firm’s OSHA citation history. It considers 4 types of citations: ◦ serious ◦ willful ◦ failure to abate ◦ repeat.

You must report all such citations that your firm has received. If you are contesting or appealing an applicable citation and it has not reached final resolution, you must still report the citation!

The classification of the citation itself is important, but we also look at: ◦ what happened ◦ what corrective action was taken ◦ your firm’s safety program to see that it meets minimum Cal/OSHA and Labor Code requirements

Citations are public information. Citation information for all employers is available using the “Establishment Search” at Your answers will be verified. ◦ We will check back 60 months as stated in the Questionnaire!

Safety Policy & Procedure Questions Section D

Read each question carefully. The questions are based on Cal/OSHA and California Labor Code requirements. Understand what it is asking. ◦ The source regulation is listed with every question (Labor Code or Cal/OSHA).

You may be required to provide documentation for any or all of your answers - be prepared! A “yes” answer implies that you have documentation available for review for that item if you are asked to provide it!

Certification: You are responsible for the accuracy of the information!

Your firm’s Insurance Broker or Insurance Carrier Loss Control (Safety) Department, Cal/OSHA Consultation, Trade Associations your firm belongs to, Internet construction safety sources Still have questions? Here are some sources for additional information:

Contractor Applicant Overview Construction Contractor Formal Prequalification

The Formal Prequalification Questionnaire Questionnaire is designed to thoroughly evaluate a contractor’s : Safety History Quality and Workmanship Past Performance Bonding/Insurance/Licensing Financial Capabilities

Contractors Interested in Bidding on Formal District Projects: Complete the most current Prime Contractor Prequalification Questionnaire Have a current and active California Contractors License Receive and maintain Safety Approval via the Safety Prequalification section of the Questionnaire Meet the Mandatory and General Qualifications requirements Provide bonds by a California-admitted surety company

Provide proof of Workers’ Comp and Liability coverage by an Insurance Company licensed to do business in California Provide references of projects completed within the last 36 months Submit a current audited or reviewed financial statement (SBE exemption) Prequalification approval is valid for one (1) year.

: THREE LEVELS OF PREQUALIFICATION BASED ON EXPERIENCE: Level I Entitled to bid on contracts in an amount not to exceed $350,000. Non-LAUSD experience: Within the past three (3) years, at least three (3) public or private works as either a prime contractor or a subcontractor with cumulative contract value totaling at least $500,000. LAUSD experience: Within the past three (3) years, at least three (3) LAUSD contracts as either a prime contractor or a subcontractor, with cumulative contract value totaling at least $100,000.

Level II Entitled to bid on contracts in an amount not to exceed $5,000,000. Non-LAUSD experience: Within the past three (3) years, at least three (3) public or private works as either a prime contractor or a subcontractor with cumulative contract value totaling at least $2,000,000. LAUSD experience: Within the past three (3) years, at least three (3) LAUSD contracts as either a prime contractor or a subcontractor, with cumulative contract value totaling at least $500,000.

Level III Entitled to bid on contracts in an amount in excess of $5,000,000. Non-LAUSD experience: Within the past three (3) years, at least three (3) public or private works as either a prime contractor or a subcontractor with cumulative contract value totaling at least $10,000,000. LAUSD experience: Within the past three (3) years, at least three (3) LAUSD contracts as either a prime contractor or a subcontractor, with cumulative contract value totaling at least $7,000,000.

Prequalification Scoring Contractor performance history will be measured according to two separate components, Field and Compliance. Field Component (Maximum Score 50, Passing Score 35) ◦ Average score of Contractor Performance Evaluations for the last three (3) contracts. ◦ Applicant must receive an average score of at least 35 points to prequalify.

Compliance Component (Maximum Score 50, Passing Score 35): 1.Labor Compliance 2.Project Stabilization Agreement (PSA) 3.Bid Issues/Protests 4.Assessments 5.Failure to comply with LAUSD contract Warranty requirements For details, see Field and Compliance Scoring Summary on the Prequalification web page at

QUESTIONS???