Team 9 - Scribacious Rabble Safety and Reliability Analysis Mitchell Erdbruegger (presenting) Paul Rosswurm William Hess Ben Kobin.

Slides:



Advertisements
Similar presentations
1 ECE 372 – Microcontroller Design Parallel IO Ports - Outputs Parallel IO Ports E.g. Port T, Port AD Used to interface with many devices Switches LEDs.
Advertisements

MM Player Supervised by: Dr. Luai Malhis. Prepared by: Mustafa Assaf & Mahmoud Musa.
Josh Piron, Jacob Pfister, Kevin Templar, Mike Phillips Group Nine Reliability and Safety Analysis DART.
Digital I/O Connecting to the Outside World
RELIABILITY & SAFETY ANALYSIS PRESENTED BY: ANDREW BATEK Team # 15: Acoustic Storm Interweaving the impressive visual power of electricity and the visceral.
Embedded Systems Design
Team 13 John Ashmore, Brian Bell, Jason Giles, Jing Li.
EMBEDDED WEB SERVER. CONTENT: 1.ABSTRACT 2.INTRODUCTION TO EMBEDDED SYSTEMS 3.INTRODUCTION TO EMBEDDED WEB SERVER 4.BLOCK DIAGRAM 5.POER SUPPLY 6.COMPONENT.
Critical Design Review 27 February 2007 Black Box Car System (BBCS) ctrl + z: Benjamin Baker, Lisa Furnish, Chris Klepac, Benjamin Mauser, Zachary Miers.
Team 9 - Scribacious Rabble Environmental Impact Lifecycle Analysis and Ethical Challenges Ben Kobin (presenting) Paul Rosswurm William Hess Mitch Erdbruegger.
MARCELO L. BRANDON G. ADITYA B. NIKHIL S. THE INCREDIBLE HUD.
TEAM BRIGHTRIDERS Failure Modes, Effects, and Criticality Analysis “We put the SOUL in SOULAR racing”
Daryl SielaffBen McQuiston Will McKennaDavid Hartman Functional Blocks and FMECA Chart.
Team 01 : QuadSquad Safety and Reliability Andrew Boldt 11/6/2013 the ECE quadcopter senior design Purdue University1.
ECE Grande ECE 477 Design Review Team 3 - Fall 2008.
SE3910 Week 2, Class 1 Today Basic Circuits Other ??? Tomorrow Lab 2, S365 (Complete prelab BEFORE) Thursday See ScheduleSchedule SE-2811 Slide design:
Technical Communication Skills Practicum (TCSP) Presented by Nuhairi & Azad Team 10: “Hazard Rover” 2/21/2007.
o Portable low-cost aerial drone that can be used for reconnaissance o Relay real-time video and data, like location, heading, battery life o Take high-resolution.
Team 2 Yimin Xiao Jintao Zhang Bo Yuan Yang.  The project we propose is a digital oscilloscope with playback function that provides almost any function.
Technical Communication Skills Practicum (TCSP) Presented by Nuhairi & Azad Team 10: “Hazard Rover” 2/21/2007.
ECE 477 Group 3 The Gauntlet George Hadley Kelli Hacker Sean Ma Jacob Champion.
Team 3 Humphrey's Treasure Chest Roy Scheck Tony Leichty Charles Lan Steve Kingsley.
Group 11. CriticalityFailure EffectMax Probability HighInjury to user may occur. LowLoss of some or all functions of the device. Customer dissatisfaction.
Team 13 Michael Stuckenschneider Loren Garby Arin Chakraverty Janell Niekamp.
TCSP – Reliability and Safety. Reliability Analysis Major component chosen for analysis:Major component chosen for analysis: Switching Regulators (LM2679SD-5.0,
Team Scribacious Rabble Design Constraint Analysis Paul Rosswurm Mitch Erdbruegger Ben Kobin William Hess.
Group 12 – H.E.A.D Gear Maximum Power Point Tracker Reliability and Safety Analysis Harsha Eric Atandra Daniel Vengapaty Aasen Burman Da Silva.
Solar Telematics System
Colin Graber Jason Kohl Jacob Varnau Cameron Young ECE 477 Design Review Team 2 - Spring 2015 R.I.S.K.
RCD Laser System Corey Lane, Ryan Scott, Danny Barjum.
Grant Thomas Anthony Fennell Justin Pancake Chris McCord TABLEGAMES UNLIMITED.
ALEX BUSCHKOETTER ALEX GLENN KIMBERLY SOONG PETRA MUSTAFA Group 4: 3MS.
Nick Kwolek Martin Pendergast Stephen Edwards David Duemler.
Matt Waldersen (Presenting) TJ Strzelecki Rick Schuman Krishna Jharjaria.
The “Drink Mixer” Reliability and SafetyAnalysis.
Technical Communications Practicum: Failure Modes, Effects and Criticality Analysis SmartShopper Jeff Richards, John Sweeney, Stevi Wood and Tera Wong.
FEST ECE 477 Fall 2011 TEAM 5 Gloria Budiman Alexander Kidarsa Christopher Sakalis Vishal Gala.
Team 5 Reliability & Safety TCSP. High Criticality = λ < Low Criticality = λ < High Criticality determined by constant vehicular movement.
Final Year Project(EPT4046) Development of an internet controlled Surveillance Mobile Robot By Mimi Madihah Bt Mohd Idris Id: BACHELOR OF ENGINEERING.
Wall-E Prototype I TCSP #8 Safety and Reliability Analysis Team 1 Xin Jin Ranmin Chen Hang Xie Zelun Tie.
Team Scribacious Rabble Packaging Specifications and Design Paul Rosswurm (presenting) William Hess Ben Kobin William Hess.
Home Enhancement Suite Presenter: Allen Humphreys William Bouchonnet, Daniel Sabo, Nathan Irvin.
Steve Andre Eric Glover Shaun Greene Russell Willmot.
Josh Marchi, Jeff King, Paul Rosenberger, Dan Chambers – RM&S Analysis–
Technical Communication Skills Practicum (TCSP) Presented by Team 10: “Hazard Rover” 2/21/2007.
(Left to Right) Matt Finn Brian Crone Samuel Oshin Yonatan Feleke.
BLDC Motor Speed Control with RPM Display. Introduction BLDC Motor Speed Control with RPM Display  The main objective of this.
Fly Spy – Group 12 Reliability and Safety Analysis Heather Barrett.
Self-Sustainable Electric Golf Bag Final Presentation Group 19 Jon Kinney, Cory Edwards, Harrison Kantner 30 April 2013.
ISA CLICK CONTROL #38 – FALL 2014 ERIC BRUNNGRABER DRAKE ISABIRYE.
DOODLE DRIVE Presenter: Peachanok Lertkajornkitti Team 6 Reliability and Safety Analysis.
Phillip Byers Jonathan Mulvaine Josh Schortgen Michael Broski TEAM BOAR.
SWISH SLEEVE Safety and Reliability Analysis Stephen MacNeil, Michael Kobit, Sriharsh Achukola, Augustus Hong.
Criticality measures Low  General annoyance – screen stops working, buttons don’t work  λ < High  Parts get hot, catch fire, and/or explode 
Team 9 - Scribacious Rabble
Autonomous Rescue Vehicle (Team 10)
Team Scribacious Rabble
FMECA chart April 12, 2006 The J Team Jennifer Tietz Jared Suttles
Team 9 - Scribacious Rabble Patent Liability Analysis
Reliability and Safety Analysis
Safety and Reliability
Reliability & Safety Analysis
ECE 477 Final Presentation Team 2 Spring 2012
ECE477 Team 6: The Soviet Challenge
Team Scribacious Rabble
Reliability and Safety Analysis
Safety Analysis Ian Bacon Zach Dicklin Amy Ritter Eric Yee.
Prepared by: Engr. Qurban Ali Memon Incharge of Final project Lab.
A PROJECT ON PASSWORD BASED CONTROL SYSTEM. A PROJECT ON PASSWORD BASED CONTROL SYSTEM.
Presentation transcript:

Team 9 - Scribacious Rabble Safety and Reliability Analysis Mitchell Erdbruegger (presenting) Paul Rosswurm William Hess Ben Kobin

Project Description Adaptation of the board game SCRABBLE® Maintains the traditional physical tile interface... augmented by.. Sensing tile location and value Automatically calculating and displaying scores Maintaining player profiles Validating words in the event of a 'challenge' Exposing game stats over an external interface

PSSCs An ability to sense the presence and identity of a tile placed on the board. An ability to record game specific metrics for a set of player profiles. An ability to use a standard dictionary to allow a player to challenge the validity of the last word played. An ability to display game relevant information to each player and allow one user to input game settings. An ability to communicate game statistics over an external interface.

Block Diagram

Chosen Parts Micro-Controller (PIC24EP256GU810)  λ P = (C 1 * π T + C2 * π E ) * π Q * π L  λ P = ( 0.28 * * 2.0) * 10 * 1.0  λ P = 5.56  MTTF: 20.5 Years Low Drop-Out Linear Regulator (LM1117)  λ p = λ b *π T *π S *π C *π Q *π E  λ p =.0020 * 5.1 * 1.0 * 1.0 * 6.0 * 8.0  λ P =  MTTF: 233 Years

Chosen Parts 8-Bit Shift Register (74HC164D)  λ P = (C 1 * π T + C2 * π E ) * π Q * π L  λ P = ( * * 2.0) * 10 * 1.0  λ P =  MTTF: Years Opto-Isolator (LTV-826S)  λ p = λ b *π T *π Q *π E  λ p = * 6.6 * 2.0 * 8.0  λ P =  MTTF: 63.5 Years Others Considered LCD Driver (Sitronix ST7565P) Capacitive Grid

Criticality Levels Low < Failures No Harm to Users Possibly render product unusable

FMECA Power Supply and LCD Circuits Failure No. Failure ModePossible CausesFailure EffectsMethod of Detection CriticalityRemarks PS1 V Out = 0 Failure of the LM1117, Shorted Decoup Caps No Power to the rest of the system, Entire product useless Observation (Use of voltmeter to check input/output voltage) Low PS2 V Out > 3.3V Failure of the LM1117 Could potentially cause irreparable damage to ICs Observation (Voltmeter on output) Low Possibly fixed with zener diode to protect rest of circuit L1 Output LCD Contr Always 0 LM1117 Failure (PS1), Shorted Decoup Cap, Burned out contr. (Possibly PS2) No backlight on the LCD Observation (Oscilloscope readout) Low L2 No power going to LCDs LM1117 Failure (PS1), Shorted Decoup Cap Nothing can be ouput to LCDs Product rendered essentially useless Observation (Volt meter) Low

Power Supply

FMECA Micro-Controller Failure No. Failure ModePossible CausesFailure EffectsMethod of Detection CriticalityRemarks M1 USB D- and D+ always 0 or 1 Software bug, broken usb module (possibly cause by PS2), Connected USB device pulling low or high Failure to communicate player statistics to PC via USB Observation (Oscilloscope) Low M2 Micro Pins at constant signal (0 or 1) Burned out pins (too much current or voltage placed on pin), software Peripherals malfunctioning Observation(Volt meter/ oscilloscope) Low M3 MCLR always 0 Broken reset button, burned out pin, shorted decoup caps Micro useless due to always sin reset Observation (voltmeter) Low M4 MCLR always 1 Broken reset button, burned out pin Mirco cannot recover without turning off power (for debug purposes only) Observation (voltmeter) Low

Micro and Reset

FMECA SD Card, Push Buttons, Column Inputs, Row Select Failure No. Failure ModePossible CausesFailure EffectsMethod of Detection CriticalityRemarks SD1 No Read/Write Functionality to SD Damaged SD Card, Shorted Decoup Caps, LM1117 Failure, SPI malfunction Cannot read or store player data Observation (Plug into PC and check if data written, Attempt to read player data via USB) Low PB1 PB Inputs always low Failed pull up resistor, Shorted decoup caps, LM1117 Failure No user input can be obtained, game rendered useless Observation (Volt meter) Low C1 Input from column alsways 0 or 1 Failed opto-isolator, Failed buffer, Burned out micro pin Cannot sense tiles properly Observation (Oscilloscope.Volt meter)Low RS1 Output to row always 0 or 1 Burned out pin on micro, burned out shift register, shorted decoup caps, LM1117 failure, Software, burned out buffer Inability to sense tiles on board Observation( Voltmeter/ Oscilloscope)Low

Column Inputs Row Selection

QUESTIONS/COMMENTS?