NASA Earth Science Perspective February 8, 2011 George J. Komar Associate Director/Program Manager Earth Science Technology Office.

Slides:



Advertisements
Similar presentations
Group on Earth bservations Discussion Paper on a Framework Dr. Ghassem Asrar August 1, 2003.
Advertisements

Brian Killough NASA NASA Future Missions Summary CGMS-38 Meeting Delhi, India November 8-12, 2010.
NASA Earth Science Update
OFFICE OF THE CHIEF TECHNOLOGIST 2 Space Technology Program – Overview Possible Solution Possible Solution Idea Possible.
Preliminary management plan for PACE SDT What are the Goals of PACE? The goals of the PACE mission are: 1-Extend key climate data records on ocean color.
1 Review of US Human Space Flight Plans Committee Evaluation Measures and Criteria for Humans Spaceflight Options 12 August 2009.
A NASA Headquarters Perspective August 24, 2010 George J. Komar Associate Director/Program Manager Earth Science Technology Office.
Meeting Expectations Gary Jedlovec Purpose of review SPoRT Mission and Vision Role of Science Advisory Committee Charge to Committee members transitioning.
1 Exploring NSF Funding Opportunities in DUE Tim Fossum Division of Undergraduate Education Vermont EPSCoR NSF Research Day May 6, 2008.
NASA AGENCY REPORT Dr. Eric J. Lindstrom Physical Oceanography Program Scientist Earth Science Division Science Mission Directorate MARCH 12, 2007.
EARTH SCIENCE INITIATIVE to respond to the NRC Decadal Survey, Earth Science and Applications from Space: National Imperatives for the Next Decade and.
1 January 17, 2007 NASA IPY Interest NASA has a strong interest in IPY themes Present environmental status of the polar regions Quantify and understand.
Office of Science Office of Biological and Environmental Research J Michael Kuperberg, Ph.D. Dan Stover, Ph.D. Terrestrial Ecosystem Science AmeriFlux.
Training and Education for NOAA Space-based Remote Sensing Programs – FY06 to FY10 Anthony Mostek NWS – OCWWS – Training Division – VISIT Anthony Mostek.
The U.S. Climate Change Science Program Dr. James R. Mahoney Assistant Secretary for Oceans and Atmosphere Director, Climate Change Science Program.
Update on the NASA/NOAA/DOE Collaboration on the Utilization of ROA/UAV/UAS for Global Climate Change and Weather Research Will Bolton Sandia National.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
NASA, CGMS-40, November 2012 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA.
NASA’s Earth Science Division Flight Overview Bradley D. Doorn Program Manager Earth Science Division, Science Mission Directorate PECORA 18.
1 Robert S. Webb and Roger S. Pulwarty NOAA Climate Service.
Partnerships and Broadening Participation Dr. Nathaniel G. Pitts Director, Office of Integrative Activities May 18, 2004 Center.
1 ID-03 Science and Technology in GEOSS C1 Engaging the Science and Technology (S&T) Community in GEOSS Implementation Hans-Peter Plag IEEE.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Science Support for NASA-NOAA Research to Operations (R2O) and GPM Ralph.
NASA Science Mission Directorate Earth Science Division TEMPO and the Earth Venture program Ken Jucks & Alex Pszenny.
Michael H. Freilich 21 April 2009 Earth Science Division Overview and Status.
1 Air Quality Applied Sciences Team (AQAST) Team Meeting – January 2014 John A. Haynes, MS Program Manager, Health and Air Quality Applied Sciences Program.
AAAC Meeting February, New GSMT Role NSF has asked that AURA/NOAO act as NSF’s "Program Manager" for the GSMT Technology development effort at a.
The US CLIVAR SSC is undertaking an examination of progress made and priority science questions and research needs remaining to be addressed to: – improve.
NCAR Annual Budget Review October 8, 2007 Tim Killeen NCAR Director.
NASA, CGMS-41, July 2013 Coordination Group for Meteorological Satellites - CGMS Status report on the current and future satellite systems by NASA Presented.
NASA Earth Science Technology Update Presented to Doppler Wind Lidar Working Group April 28, 2015 George J. Komar Associate Director/Program Manager Earth.
NMP EO-1 TECHNOLOGY WORKSHOP Section 2 Meeting Objectives.
Second GPM Applications Workshop 9-10.June Partners in the GPM Constellation Second GPM Applications Workshop 9-10.June.2015.
ESIP Federation Air Quality Cluster Partner Agencies.
STATUS REPORT ON WA TASK DESCRIPTION: “Organize workshops on water observations, encompassing space-based, airborne, and in-situ observing systems,
Recent Developments NASA IDL/MDL study indicated technical feasibility of an ISS mission NASA IDL/MDL cost estimate was well above Earth Venture limits.
Outline of Japanese Alliance for Climate Change Observation (JACCO) Shin MIYAZAKI ( Office for Coordination of Climate Change Observation (OCCCO), Japan.
Carl G. Ray Program Executive Small Business Innovation Research Small Business Technology Transfer SBIRSBIR To increase small business participation.
INTO THE NEW YEAR January 3, Objectives Reaffirm principles –China’s interest in exploring ESIP structure prompted review of ESIP evolution (more.
NASA Use Cases for the Earth Observation Sensor Web Karen Moe NASA Earth Science Technology Office WGISS-26 Boulder,
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
NASA Science Mission Directorate Earth Science Division HQ Perspective on Venture Class and TEMPO Alex Pszenny.
Diane E. Wickland NPP Program Scientist NPP Science: HQ Perspective on VIIRS May 18, 2011.
Hazardous Weather Forecasts and Warnings Overview: Forecast Division Jack Kain (NSSL) February 25–27, 2015 National Weather Center Norman, Oklahoma.
The State Climatologist Program and a National Climate Services Initiative Mark A. Shafer Oklahoma Climatological Survey University of Oklahoma.
NASA Applied Sciences Program Update John A. Haynes Program Manager, Weather National Aeronautics and Space Administration Applied Sciences Program Earth.
Session 2: Improved Situational Awareness Sixth Meeting of the Science Advisory Committee 28 February – 1 March 2012 Future Activities National Space Science.
1 Second Suomi NPP Applications Workshop John A. Haynes, MS Program Manager, Health and Air Quality Applied Sciences Program Earth Science Division Science.
GEOSS ADC GEO Task DA Data Integration and Analysis System Ken McDonald NOAA/NESDIS for: T. Koike, R. Lawford, S. Miura….
Gary Jedlovec Roadmap to Success transitioning unique NASA data and research technologies to operations.
UNCLASS1 Dr. Gene Whitney Assistant Director for Environment Office of Science and Technology Policy Executive Office of the President WISP Meeting - July.
Science Team Objectives K. Jezek and J. Richter-Menge Science Team Co-leads.
Moving Towards GEOSS Vice Admiral Conrad C. Lautenbacher, Jr., U.S. Navy (Ret.) Under Secretary of Commerce for Oceans & Atmosphere Future National Operational.
Applied Sciences Perspective Lawrence Friedl, Program Director NASA Earth Science Applied Sciences Program LANCE User Working Group Meeting  September.
NASA Headquarters Perspective on Space- Based Global Wind Measurements Presented to: Working Group on Space-Based Lidar Winds February 2, 2010 George J.
Course, Curriculum, and Laboratory Improvement (CCLI) Transforming Undergraduate Education in Science, Technology, Engineering and Mathematics PROGRAM.
Transitioning unique NASA data and research technologies to operations Short-term Prediction Research and Transition (SPoRT) Project Future Directions.
AMS Washington Forum Federal Panel Michael H. Freilich 4 April 2013 Suomi NPP VIIRS Visible Composite NASA LDCM First-Light OLI False-Color Fort Collins.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Pasadena, California CLARREO GPS RO/AJM-JPL.
March 2004 At A Glance Advanced Mission Design (AMD) researches and develops innovative trajectories and the mathematical methods used for optimal designs.
GPM-GLOBE Precipitation Student Field Campaign Global Precipitation Measurement Mission Developed by the GPM Education and Communications Team NASA Goddard.
Center for Satellite Applications and Research (STAR) Review 09 – 11 March 2010 Image: MODIS Land Group, NASA GSFC March 2000 Weather & Water Synthesis.
NASA Earth Exchange (NEX) A collaborative supercomputing environment for global change science Earth Science Division/NASA Advanced Supercomputing (NAS)
U N I T E D S T A T E S D E P A R T M E N T O F C O M M E R C E N A T I O N A L O C E A N I C A N D A T M O S P H E R I C A D M I N I S T R A T I O N.
National Aeronautics and Space Administration NASA SBIR/STTR A holistic Approach LK Kubendran, PhD, MBA Portfolio Executive Commercial Partnerships Programs.
Quick overview of existing Early Adopter paradigms in NASA Earth Science Doreen Neil July 12, 2016.
Capacity Building Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing.
Unidata Policy Committee Meeting
SBSTA Research Dialogue: Perspectives from the United States
7th EU Research FP has ten themes defined in order:
Presentation transcript:

NASA Earth Science Perspective February 8, 2011 George J. Komar Associate Director/Program Manager Earth Science Technology Office

2 Earth Science Technology Office (ESTO) Earth Science Division Budget Budget ($M) FY12

3 Earth Science Technology Office (ESTO) ESD Climate Implementation Approach A Program that flies 1-2 missions every year well into the next decade 2010: Glory ($450M) 2011: Aquarius & NPP ($1,300M) 2012: LDCM ($950M) 2013: GPM ($1,000M) 2013: OCO-2 ($330M) 2014: SMAP & SAGE III ($900M) 2015: ICESat-2 ($750M) 2016: GRACE FO ($375M) 2017: DESDynI, CLARREO-1 & EV-2 ($2,300M) 2019: PACE ($900M) 2020: CLARREO-2, ASCENDS & SWOT ($1,300M) Venture Mission Class calls – 2009, 2011, 2013, … Venture Instrument calls – 2011, 2012, 2013, … Complete the foundational missions as planned Complete the DS Tier 1 missions by 2017 Move out with Climate Missions and DS Tier 2

4 Earth Science Technology Office (ESTO) Non-Flight Augmentation: Key Elements Modeling, assessment, and computing − expand NASA’s contribution to the 2013 National Assessment by the USGCRP − Enhance NASA’s contribution to IPCC 5th Assessment Report, including Working Group 1 (physical basis of climate) and Working Group 2 (mitigation/adaptation) – Provide for enhanced computing capability split between hardware and software Acceleration of operational use of NASA research data to improve climate prediction and weather forecasting. Includes − expansion of the SERVIR network − Enhanced support for research-and-operations transition entities (Joint Center for Satellite Data Assimilation, Short-Term Regional Prediction Center, Direct Readout Laboratory) − Enhancement of competitive opportunities for community participation in R-O activities Synthesis of NASA Earth Science observations via expanded opportunities for competitively- selected Interdisciplinary Science investigations and key mission science teams Calibration of multi-satellite global data sets to enable increasing leverage of international data contributions, furthering the goals of USGEO and GEOSS − Upgrade to ground network for space geodesy/terrestrial reference frame − Additional support for facility airborne instruments, cal/val oriented field campaigns Development of NASA’s contributions to a national Carbon Monitoring System in collaboration with other federal agencies Expanded Earth Science Technology Program to provide advances needed to enable accelerated implementation of Decadal Survey measurements Enhanced support for Earth Science education programs − Enhanced support for GLOBE program to involve NASA scientists \ − Enhanced competitive opportunities for incorporation of NASA results into education and outreach activities

5 Earth Science Technology Office (ESTO) Features of Venture Mission Line Venture will address exploratory science. Yearly calls as recommended by the NRC decadal survey AO driven, competitively selected, PI-led projects, with science be open to all earth science themes Optimal mix of sub-orbital, instrument and orbital mission opportunities Alternate between orbital and sub-orbital (FY11,13,15,…) project Life Cycle Cost of $150M/5 years Instruments (FY11.12, 13, 14,15, 16,…) project Life Cycle Cost of $90M/4 years Key Decision Points will gauge performance and continued funding Space-based calls will allow possible overlaps with decadal survey strategic missions, if they meet the other criteria (innovation, cost, schedule and science driven) First Earth Venture -1 (EV-1) call for airborne campaigns selected in Spring EV-2 (Orbital) call planned for FY2011, with awards in FY2012 EV (I) call planned for FY 2011

6 Earth Science Technology Office (ESTO) Earth Venture EV ScheduleTypeSolicitationSelectionLaunch/Delivery EV-1Suborbital EV-2Full Orbital LRD ~2017 EV-I1Instrument Only Del ~2016 EV-I2Instrument Only Del ~2017 EV-3Suborbital EV-I3Instrument Only Del ~2018 EV-I4Instrument Only Del ~2019 EV-4Full Orbital LRD ~2021 EV-I5Instrument Only Del ~2020 EV-I6Instrument Only Del ~2021

7 Earth Science Technology Office (ESTO)

8 Earth Venture – 2 (EV-2) Investigations Earth Venture-2 (EV-2) will solicit proposals for a complete, principal investigator-led mission to conduct innovative, integrated, hypothesis or scientific question-driven approach to pressing Earth system science –Sustained, science-based data acquisition — The successful investigation must advance Earth system science objectives through a focused orbital measurement of sufficient clarity and breadth to prove/disprove a scientific hypothesis or address scientific questions. –Technology — All proposed investigations must use mature system technology where, at a minimum, there has been a system/sub-system model or prototype demonstration in a relevant environment (Technology Readiness Level (TRL) of 6 or greater). –Competitive selection — The investigations will be selected in an open competition, to ensure broad community involvement and encourage innovative approaches. We expect to use a two step AO evaluation process. –Cost and schedule constraints — The successful proposal must be accomplished a life cycle from initiation to launch in less than 5 years and a total life cycle cost not to exceed $150M, including reserves. EV-2 Announcement of Opportunity to be made Spring 2011, with the winning selection in early FY2012

9 Earth Science Technology Office (ESTO) EV-Instruments (EV-I) – Scope of Program The third leg of the Venture-class investigations, or Earth Venture-Instruments (EV-I), will solicited proposals for a complete, principal investigator-led instrument to conduct innovative, integrated, hypothesis or scientific question- driven approach to pressing Earth system science issues –Annual series of Instrument-Only solicitations, beginning in FY2011 with the 1 st selection in FY2012 –One-step SALMON solicitation. The investigations will be selected in an open competition, to ensure broad community involvement and encourage innovative approaches. –Cost capped approach, notionally $90M per solicitation. More than one instrument may be selected within one solicitation. –Instruments could be flown on domestic or international flights of opportunity –Instrument will strive to use a common instrument interface, with the interface requirements developed by the ESSP and defined in the AO. The PI will retain a central role on the instrument when it is finally manifested and flown