Cooling plant upgrade 2012-2013 Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD.

Slides:



Advertisements
Similar presentations
Coach Air Conditioning
Advertisements

1 Optimal Control of Chiller Condenser Sub-cooling, Compressor Speed, Tower Fan and Pump Speeds, and IGV Omer Qureshi, Hassan Javed & Peter Armstrong,
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
24 June 2010 Immanuel Gfall (HEPHY Vienna) CO 2 Cooling for PXD/SVD IDM Meeting.
Moisture to water converter. Out Line : Abstract Introduction Heat Pump Heat Pump Components Conclusion.
Refrigeration Cycles Chapter 11.
C oncerns Ltd ool Energy Efficient Refrigeration Jane Gartshore, Cool Concerns Ltd.
HVAC Systems Overview HVAC Overview - # 1 Tom Lawrence
6/3/2015Auke-Pieter Colijn1 C3F8 NIKHEF Design Compare Does it work?
Product Introduction.
Condenser supply contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
SPD Cooling workshop: PLC item details. ups upgrade: 10-12' after trigger 24V - what to do in 10 minutes Present situation: In case of “normal power”
M. Battistin – 1 st September 2009 EN/CV/DC 1 M. Battistin (EN/CV/DC) 1 st October 2009 ATLAS cooling Group - Thermosiphon solution for ATLAS ID cooling.
REFRIGERATION, COMPRESSED AIR SYSTEMS & EFFICIENT USE OF ENERGY
Refrigeration Terms Cooling Load, Cooling Capacity – Q in Compressor Load – W in Condenser Load – Q out Tons of Refrigeration – Rate of Heat Input Refrigerant.
Chilled water Meyrin consolidation Study 1 st Part Many thanks for their contribution to: Pasquale Alemanno, Fortunato Candito, Alexander Putzu.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
F-595 Chiller contract report Jose Botelho Direito EN/CV/DC Thermosyphon cooling workshop §5 Thursday, October 20, 2011.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
Cooling R&D at RWTH Aachen Lutz Feld, Michael Wlochal (RWTH Aachen University) CEC Meeting, CERN Lutz Feld, Michael Wlochal (RWTH Aachen University)
CMS FPIX Cooling System Studies Joe Howell, Fermilab for the FPIX Upgrade Mechanical Working Group CMS Upgrade Workshop April 27,
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
CPPM Pixel Evaporative Cooling Plant Description & Operation with C 3 F 8 or C 4 F 10 G. Hallewell, CPPM, Feb 07, 2005.
J. Direito - M. Battistin – 28 th May 2010EN/CV/DC J. Direito, M. Battistin (EN/CV/DC) 28 th May 2010 Detector Cooling Project III Thermosiphon Workshop.
Claudio Bortolin 03/09/2012. SPD (RP analyses required) 1) Pump 17b replacement and leak test 2)Pressure test on the old inlet lines (technicians coming.
Full Scale Thermosyphon Design Parameters and Technical Description Jose Botelho Direito EN/CV/DC 19 November, th Thermosyphon Workshop.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
BasicRefrigerationSystem 4 Component Flow Diagram.
Cooling System Solutions
Refrigeration Cycles A Carnot cycle in reverse QL QH T s 2
60kW Thermosiphon control system
Michele Battistin Elena Perez Rodriguez 10 November 2010
25/3/2009Detector Cooling Project Meeting I1 Running consolidation activities of ALICE Detector Cooling Systems A.Tauro.
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH Design of the thermosiphon Test Facilities Thermosiphon Cooling Review A. MORAUX PH Dpt / DT Group CERN SEPTEMBER.
Thermosiphon Project for ATLAS ID C 3 F 8 Evaporative Cooling - Status Report ATLAS ID Week CERN – Geneva October 28 th, 2013 M. Battistin & all TS team.
ID week 27 th of April 15 C3F8 cooling- Compressors & C3F8 status O. Crespo-Lopez EN/CV.
Claudio Bortolin. pump: replaced outlet filter: replaced demineralized cartridge: replaced mechanic filter on air control: replaced SSD chilled water.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
Refrigeration What's Refrigerated? What makes up a system?
A two-stage system for the future cooling system.
© 2012 MITSUBISHI HEAVY INDUSTRIES – MAHAJAK AIR CONDITIONERS CO., LTD. All Rights Reserved. 5 August 2014.
Vapour Compression Cycle You will Learn: 1 Vapour Compression Cycle Actual Vapour Compression Cycle Components in a Vapour Compression Plant Multistage.
110 th November 2010EN/CV/DC Detector Cooling Project - advancement status of Work Package N3 Thermosiphon project Michele Battistin 18 May 2011.
VAPOUR ABSORPTION REFRIGERATION SYSTEM
Bernard Boutherin 1 Feedback after four years of operation.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
1 Summer Training On Refrigeration and Air Conditioning From:-Amber Enterprises PVT.LTD.
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
For more information, please contact 24/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
Optimized Designs October 20, 2016 Presented by Oscar Peraza
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Saturation Temperature
R1 Fundamentals of Refrigeration
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Chapter 14A: VC AND AC REFRIGERATION CYCLES AND SYSTEMS
Introduction to Food Engineering
ATLAS Thermosiphon Readiness Review 17th March 2016
Forum on Tracking Detector Mechanics - Bonn, May 2016
Compound VCRS.
Compound Vapour Compression Refrigeration Systems
Recirculating CO2 System
Refrigeration/AC/Heat Pumps
R1 Fundamentals of Refrigeration
Refrigeration and Air Conditioning
Refrigeration and Air Conditioning
November technical stop activities:
Presentation transcript:

Cooling plant upgrade Jose Botelho Direito, Michele Battistin, Stephane Berry, Sebastien Roussee 2 nd SPD Cooling Workshop 30/11/201112nd SPD Cooling Workshop

Outline SPD Cooling Plant Status Cooling Plant Upgrade Options – Description of all possible Options: General scheme Thermodynamic cycle Conclusions 30/11/201122nd SPD Cooling Workshop

ALICE SPD Cooling Plant Status Origin of malfunctionCauseConsequences Detector Impact Solution 1Power failureMajor Power cut/glitch - Cooling plant in STOP mode - Detector OFF High Cooling plant on UPS 2Pumps failure Weariness of pumps impellers - Pump Swap implies Detector Shut Down and Restart - Frequent maintenance High Remove the pumps 3 Chilled and Mixed Water dependence Failure of mixed/chilled water - Cooling StopMedium Air cooled chillers or air cooled condenser 4High Leak Rate - Several modifications since original design - Poor quality and High number of fittings - Plant refilling - Expensive and frequent maintenance Low Improve connection fittings & use weld connections whenever possible 30/11/201132nd SPD Cooling Workshop

SPD Cooling Plant Upgrade Options Option 0 – Pump replacement with a two stage pump(s). Option 1 – Refurbishment of the present plant – Option 1.2: Same configuration and components with new two stage pumps and new Condenser (larger capacity and higher PN requirements). Option 2 – Water/Air Cooled Condenser in CR5 (30m height) with compressors. – No pumps. Option 3 – Thermosyphon: New Condenser in CR5 (30m height): – No Pumps, no compressors. 30/11/201142nd SPD Cooling Workshop

Common Improvement for Options 1-3 Higher design pressure: PN16 – Liquid side service pressure < 6.5 bar(a) – Vapour side service pressure < 2.3 bar(a) – Expected leak rate: Vapour side: 2.45 x 10-6 mbar.lt/s (28 gr/year) Liquid side: 1.05 x 10-6 mbar.lt/s (13 gr/year) Cooling plant on UPS (estimated power requirement of 5kW) 30/11/201152nd SPD Cooling Workshop

Option 0: Replacement of the pumps 30/11/20112nd SPD Cooling Workshop6

Option 1: Refurbishment of the present plant Recover of some components Design of a new Tank Design of a new rack Same thermodynamic working principle … 30/11/20112nd SPD Cooling Workshop7

CR5 Platform 30/11/20112nd SPD Cooling Workshop8

Option 2: Water/Air Cooled Condenser in CR5 30/11/20112nd SPD Cooling Workshop9 PT Return Manifold (Vap.) PT Supply Manifold (Liq.) Return Gas pressure set point of 1.4 to 1.8 bar Supply Liquid pressure set point of 3.5 to 6.5bar DUMMY LOAD (By – Pass) Height H=~8m Same Supply and Return Manifolds Particle Filters - No Pumps - No insulation on the supply line Condensation pressure at 3.2bar (30°C) in case of mixed water failure Condensation pressure at 3.2bar (30°C) in case of mixed water failure Water cooled 2.2bar Mixed water

Option 2: Water/Air Cooled Condenser in CR5 30/11/20112nd SPD Cooling Workshop10 Pressure [bar] Enthalpy [kJ/kg] A B C D E F G B’ C4F10 Liquid C4F10 2-phase C4F10 Vapour C4F10 Vapour C’

Option 3: Thermosyphon PT Return Manifold (Vap.) PT Supply Manifold (Liq.) Return Gas pressure set point of 1.4 to 1.8 bar Supply Liquid pressure set point of 3.5 to 6.5bar Redundant Chiller DUMMY LOAD (By – Pass) Height H=~8m Same Supply and Return Manifolds Particle Filters Main Chiller 30/11/ nd SPD Cooling Workshop - No Pumps - No compressors - Insulation on vertical supply line

Option 3: Thermosyphon Set Points Condenser Saturation Pressure: – Dependent on the evaporation temperature and return pressure drop: P Cond = P sat – P height – P return rack – P Drop Return line P Cond = 1.73 bar (Evap. Temp. 12°C) – bar (height) – 0.1 bar (return rack) – bar (DN32, 45m) = 1.57 bar (Saturation Temperature of 9.35°C). Condenser Liquid Temperature = 9.35 °C – 5 °C = 4.35°C -> Insulation needed on the vertical supply line. Available Height: 32m – Dependent on the supply pressure Set Point, Condenser pressure, and Supply Pressure Drop; Calculation of the required Hydrostatic Pressure: P supply = P Hydrostatic + P Condenser – P drop supply pipes P supply = 4.9 bar bar – 0.01 bar (DN25, 45m length) = 6.5 bar Supply pressure can be increased if Condenser height is increased (150mbar/meter) 30/11/ nd SPD Cooling Workshop

Option 3: C4F10 P-H Diagram A-B: Condensation and sub-cooling B-C: Hydrostatic Pressure difference C-D: Heat to Ambient Temperature D-E: Pressure regulation + Detector height E-F: Sub-Cooling (PP4) F-G: Capillary/Expansion G-H: Evaporation and superheating H-A: Return pressure drop Pressure [bar] Enthalpy [kJ/kg] A B C D E F G H C4F10 Liquid C4F10 2-phase C4F10 Vapour C4F10 Vapour 30/11/ nd SPD Cooling Workshop

Conclusion (Option 0) The implementation of two stage pumps can improve the reliability of the existing ones. (Option 1) The refurbishment of the plant (with new pumps or not) solves the problems of leaks and power cuts but, not the dependence of mixed/chilled water. (Option 2) The implementation of a water/air cooled condenser in CR5 solves the problems of leaks, power cuts, and pump failures. (Option 3) The implementation of the condenser in CR5 using a low temperature redundant chiller solves the problems of leaks, power cuts, pump failure, and has no working components on the C4F10 loop. 30/11/20112nd SPD Cooling Workshop14