Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo.

Slides:



Advertisements
Similar presentations
CBM Calorimeter System CBM collaboration meeting, October 2008 I.Korolko(ITEP, Moscow)
Advertisements

ATLAS Tile Calorimeter Performance Henric Wilkens (CERN), on behalf of the ATLAS collaboration.
1 AHCAL answers IDAG Erika Garutti On behalf of AHCAL analysis team.
The performance of Strip-Fiber EM Calorimeter response uniformity, spatial resolution The 7th ACFA Workshop on Physics and Detector at Future Linear Collider.
ECAL and HCAL status 1Yu. Guz 2014/11/26. TED shots, 24-Nov 2Yu. Guz 2014/11/26.
INTRODUCTION TO e/ ɣ IN ATLAS In order to acquire the full physics potential of the LHC, the ATLAS electromagnetic calorimeter must be able to identify.
1 Hadronic In-Situ Calibration of the ATLAS Detector N. Davidson The University of Melbourne.
1 N. Davidson, E. Barberio E/p single hadron energy scale check with minimum bias event Hadronic Calibration Workshop 26 th -27 th April 2007.
Analysis Meeting – April 17 '07 Status and plan update for single hadron scale check with minimum bias events N. Davidson.
1 N. Davidson Calibration with low energy single pions Tau Working Group Meeting 23 rd July 2007.
Status of calorimeter simulations Mikhail Prokudin, ITEP.
FMS review, Sep FPD/FMS: calibrations and offline reconstruction Measurements of inclusive  0 production Reconstruction algorithm - clustering.
No dead cells (yet) The integrated luminosity since the last meeting: 477 pb -1 ; since the last TS: 609 pb -1 ; smooth operation since the last meeting,
The Time-of-Flight system of the PAMELA experiment: in-flight performances. Rita Carbone INFN and University of Napoli RICAP ’07, Rome,
Studies of radiation hardness of ECAL modules 1Yu. Guz 2013/05/28.
Photon reconstruction and calorimeter software Mikhail Prokudin.
N. Anfimov (JINR) on behalf of the ECAL0 team.  Introduction  Installation and commissioning  Calibration  Data taking  Preliminary result  Plans.
The Transverse detector is made of an array of 256 scintillating fibers coupled to Avalanche PhotoDiodes (APD). The small size of the fibers (5X5mm) results.
Alexander Khanov 25 April 2003 DIS’03, St.Petersburg 1 Recent B Physics results from DØ The B Physics program in D Ø Run II Current analyses – First results.
Monitoring system of the LHCb electromagnetic calorimeter NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
Thomas Jefferson National Accelerator Facility Page 1 EC / PCAL ENERGY CALIBRATION Cole Smith UVA PCAL EC Outline Why 2 calorimeters? Requirements Using.
The Scintillator ECAL Beam Test at FNAL K. Kotera, Shinshu-u, 1st October 2009 CALICE Scintillator ECAL group; Kobe University, Kyungpook University, the.
HCAL status and plans Yu. Guz.  Finally, no dead cells in the run However: There are unstable PMTs (mainly rate effect) Dark current.
Marco Delmastro 23/02/2006 Status of LAr EM performance andmeasurements fro CTB1 Status of LAr EM performance and measurements for CTB Overview Data -
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
Event Reconstruction in SiD02 with a Dual Readout Calorimeter Detector Geometry EM Calibration Cerenkov/Scintillator Correction Jet Reconstruction Performance.
Gael Rospabe Lapp 15/04/08 CaloSoft Meeting 1 Ecal calibration using  0 Sabine Elles/ Marie-Noëlle Minard/ Gaël Rospabé.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
28 June 2010 LHCb week St Petersburg M.N Minard 1 Calorimeter status Hardware status Controls & monitoring Timing alignment Calorimeters calibration Pending.
08-June-2006 / Mayda M. VelascoCALOR Chicago1 Initial Calibration for the CMS Hadronic Calorimeter Barrel Mayda M. Velasco Northwestern University.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
1 Yu. Guz HCAL status 22/06/ Yu. Guz HCAL 137 Cs calibration The 3 rd run in 2011 was performed at the technical stop, May-09. Two source passages,
Results from particle beam tests of the ATLAS liquid argon endcap calorimeters Beam test setup Signal reconstruction Response to electrons  Electromagnetic.
M.N Minard Calorimeter Calibration scheme Calorimeter calibration procedure.
PFAs – A Critical Look Where Does (my) SiD PFA go Wrong? S. R. Magill ANL ALCPG 10/04/07.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
Update : Ratio of Three over Two Jet Cross Sections P.Kokkas, I.Papadopoulos, C.Fountas, I.Evangelou, N.Manthos University of Ioannina, Greece Senior Editor.
CALOR April Algorithms for the DØ Calorimeter Sophie Trincaz-Duvoid LPNHE – PARIS VI for the DØ collaboration  Calorimeter short description.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
US CMS UC Riverside, 18-May-2001, S.Kunori1 Status of JetsMET Shuichi Kunori U. of Maryland 18-May-2001 PRS: Physics Reconstruction and Selection.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
Forward Carriage Commissioning CLAS Collaboration Meeting 6/19/2015CLAS12 CalCom Status Update1 ECAL PCAL FTOF Panel 1A FTOF Panel 1B Detector Status PMT.
5-9 June 2006Erika Garutti - CALOR CALICE scintillator HCAL commissioning experience and test beam program Erika Garutti On behalf of the CALICE.
(s)T3B Update – Calibration and Temperature Corrections AHCAL meeting– December 13 th 2011 – Hamburg Christian Soldner Max-Planck-Institute for Physics.
STAR Collaboration Meeting, BNL – march 2003 Alexandre A. P. Suaide Wayne State University Slide 1 EMC Update Update on EMC –Hardware installed and current.
ECAL and HCAL technical status 1Yu. Guz 2015/09/02.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Georgios Daskalakis On behalf of the CMS Collaboration ECAL group CALOR 2006 – Chicago,USA June 5-9, 2006 CMS ECAL Calibration Strategy.
The KASCADE-Grande Experiment: an Overview Andrea Chiavassa Universita’ di Torino for the KASCADE-Grande Collaboration.
26/May/2008Calor LHCb Preshower(PS) and Scintillating pad detector (SPD): commissioning, calibration, and monitoring Eduardo Picatoste Universitat.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
 0 life time analysis updates, preliminary results from Primex experiment 08/13/2007 I.Larin, Hall-B meeting.
Calorimeter and its Upgrade Pascal Perret LPC Clermont 8 December 2015 OUTLINE  Detector status  Calibration  Upgrade.
06/2006I.Larin PrimEx Collaboration meeting  0 analysis.
Yu. Guz 08/02/20121 HCAL 2011/2012 shutdown activities.
December, Calibration of electromagnetic calorimeter of Hall A DVCS experiment Eric FUCHEY Ph.D Laboratoire de Physique Corpusculaire.
Feb. 3, 2007IFC meeting1 Beam test report Ph. Bruel on behalf of the beam test working group Gamma-ray Large Area Space Telescope.
09/06/06Predrag Krstonosic - CALOR061 Particle flow performance and detector optimization.
1 D *+ production Alexandr Kozlinskiy Thomas Bauer Vanya Belyaev
27/02/2014 INSTR14 S.Filippov1 First Years of Running for the LHCb Calorimeter System Sergey Filippov (Institute for Nuclear Research of RAS, Moscow) on.
Rita Carbone, RICAP 11, Roma 3 26/05/2011 Stand-alone low energy measurements of light nuclei from PAMELA Time-of-Flight system. Rita Carbone INFN Napoli.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
Inventory of the ECAL spare Inner modules Scanning with 137 Cs 1Yu. Guz 2013/12/04 There are 32 spare ECAL Inner modules stored in b The purpose.
SHIP calorimeters at test beam I. KorolkoFebruary 2016.
Ageing correction from electron
CMS ECAL Calibration and Test Beam Results
p0 life time analysis: general method, updates and preliminary result
FMS Readiness for Run 11 Stephen Trentalange.
Plans for checking hadronic energy
Steve Magill Steve Kuhlmann ANL/SLAC Motivation
Presentation transcript:

Calo preparation for 2015 Goals: -Trigger stability -Good calibration for HLT2 processing -Improved calibration ( timing, e/gamma response) for all calo sub- detectors -Improved monitoring

Calibration workshop 8/10/2013 The hardware changes : – Damaged Ecal LED fibers will be changed -> improved gain monitoring (Iouri) – Exposed PMT will be replaced ( hundreds) The current calibration scheme for ECAL/PRS – Initial calibration from pi0 fine calibration (D.Savrina) using FMDST available ~ 4 weeks of data taking Minimum biais events. Low energy in PS ~ 80M events needed Iterative procedure The more precise method – Ageing effect corrected from e/p of tagged conversions 55 sets in 2013 (MNM) – Calibration from electron provide also calibration constant also for pre-shower. (O. Steinakin) available only after reconstruction. Analytic solution The current calibration scheme for Hcal – Ageing monitoring through LED response (2012) – PMT change when deviation above certain threshold – Controlled by Cs source run ( every TS) – Fine Hcal calibration on reconstructed data : M events needed to get a cell/cell calibration.

3Yu. Guz 2013/10/09 LED system: HCAL 2012 sum/sum ref, 56 central cells shutdown 137 Cs calibration TS1, 137 Cs calibration TS2, 137 Cs calibration TS3, 137 Cs calibration LED-based HV corrections (17) Cs calibrations (3) results of Cs calibrations at TS is used as a starting point, then LED-based corrections total of 4 Cs calibrations and 17 LED-based corrections Precision of LED corrections is limited by: annealing during TS (and faster ageing afterwards) - PMT rate effect – variation within fill (can be optimized by regrouping PMTs, to be LS1) uncertainty in the “plastic ageing” prediction – non linearity, annealing (the attempts to take the plastic ageing into account are visible)

Occupancy Method & dependence For each cell calculate the occupancy ratio : - Threshold to be determined – Precision to be reached 1-2% Irina Machkhilyan LHCb-INT Calo meeting presentations from Irina in each calo meeting since July

Occupancy ratio #fill dependence MagDownMagup - Depends upon the fill  Stable period in  to be used -Depends of the trigger type -> Minimum biais 85 Hz for 8 hours fill enough to reach a 1% precision - Magup/Magdown reference

Can be extended to Hcal Hcal / LED response Ecal/LED correlated to HV change

PRS case Determination of the integration range complicated By the scale change of the adc spectrum. Checked on data as well.

Method’s checks on 2012 data * Several run used to calculate the correction from occupancy. Bothpolarity Reference are in italic

Ecal E/p fit

Hcal Removing the Hcal HV change effect calculated from LED On raw Hcal fluctuation at 2% level. More investigation on PMTs affecting the trigger The accuracy of the method can be compared to the LED

PS Ecal corrected Ecal +PS corrected E/p for electrons -Ecal occupancy correction applied -Ecal & PS occupancy correction applied -Overcorrection when both are applied: -To be understood -Impact on L0 to be investigated but is expected to be small.

For Hz minimum biais needed ~ 300K /hour – 1 :1.5 % precision all over the calorimeter (10 hours) – 2 consecutive fill can be used – Choose stable  period – Raw information should be available for end of fill processing Built tools able to determine runs with stable mu 2 options – Correction table / cell – HV change – preferred will solve the trigger instability Cannot be reversed PMT HV curves used With new LED system the ageing amplitude can be monitored and used to cross check occupancy changes. Initial calibration needs other methods –  0 (Ecal) – Electrons (Ecal +PS)

Is it possible ? Need 85Hz of minimum biais event to calculate occupancy cell by cell ( occupancy farm ?) Analyse events only in mu stable condition Reference depends upon the magnetic field The PMT HV can be updated when the deviation > 2-sigma of its resolution Possible to check the agreement with LED measurement (Ecal & Hcal) This method had been used in November 2012 to update Ecal HV It will remove the ageing dependance from trigger Is it possible to fit with the new HLT1/HLT2 scheme It has to be completed by fine calibration To be checked in event replaying mode. ( 1st 2014 half)

Data quality controls Improved data quality to point wrong behavior: – On line (in investigation) : The possibility to use the 85 Hz mimimum biais event to check the pi0 mass reconstruction as done in the fine calibration: with or without iterative procedure – e/p per zone for conversion to become standard plots – Pi0 Mass /zone will also become standard DQ plots – e/p on hadronic charged tracks Current developement ( available in 2014) – Retuning of all corrections for electrons and pions – Clustering (2x2 investigate for the upgrade ) Initial precise calibration will come from pi0, electrons, hadrons: FMDST scheme still needed.

spares

2012 procedure Reference calibration from reconstructed  0 – Processing using the current calibration – Extract correction coefficient (Dasha) Need FMDST to be available Processing 2 weeks All 1 Reference used

Ageing trend general Lumi (pb -1 ) The correction are dominated by the higher flux in each zone. They correspond to higher ageing. HV change end of august ~1% /100pb-1 HV change: occupancy method End of November. Back to initial calibration. ~0.4%/100pb-1 Annealing effect : Christmas stop 4% annealing in average Fraction gain lost

E/p for electron (O.Steniakin) Fine calibration applied on already calibrated data

HCAL E/p calibration: track selection For all tracks from Rec/Track/Best : v find associated cells in HCAL, ECAL, PS laying at the track extrapolation; calculate E(HCAL), E(ECAL), E(PS)  using the CaloEnergyForTrack tool (Vanya) (AddNeighbors=1) v keep only tracks with E(HCAL)>0 v require isolation in HCAL (no HCAL cells associated with given track is shared with any other track); v keep only long tracks, -200<z<400mm v reject muons (tight and loose) v reject protons (by RICH): the HCAL responses to and differ, which distorts calibration v require E(ECAL) < 800 MeV && 0< E(PRS) < 20, to reject showers started much before HCAL The track position in HCAL is defined as the position of a cell with max energy deposition. v further refinement:  cut on p track : 7 GeV for all cells, somewhat higher for the innermost ones  (safety) cut on E(HCAL): 2.5 GeV for all cells, somewhat higher for the innermost ones Yu. Guz 2013/10/0919

HCAL response to hadrons, data More uniform than response to muons: ~4% RMS for both inner and outer (borders excluded). Yu. Guz 2013/10/0920