CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update.

Slides:



Advertisements
Similar presentations
24 April 2007G. Rakness (UCLA) 1 Power cuts at Green Barracks/SX5 False fire alarms from the central fire alarm system (incendie central) cut power to.
Advertisements

22 May 2007G. Rakness (UCLA) 1 At minus-side slice test… Complete description of how to bring back slice test all the way from (power=off) to (local run=physics.
CPT Week, Nov 2003, B. Paul Padley, Rice University1 CSC Trigger Status, MPC and Sorter B. Paul Padley Rice University November 2003.
Sector Processor – to – Muon Sorter tests M.Matveev Rice University January 8, 2004.
CSC Muon Trigger September 16, 2003 CMS Annual Review 1 Current Status of CSC Trigger Elements – Quick Summary Jay Hauser, with many slides from Darin.
CSC Synchronization Procedure and Plans CMS Endcap Muon FNAL October 29, 2004 Jay Hauser* / Martin Von der Mey / Yangheng Zheng University of.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Endcap Muon meeting: CMU, Oct 19, 2003 J. Hauser UCLA 1 CSC Trigger Primitives Test Beam Studies Main Test Beam 2003 Goals: Verify the peripheral crate.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
Jay Hauser, Emu meeting at Florida, 9 January CSC Trigger Meeting Summary Cast of many.
DRAFT version Oct. 15, 2004 Hauser/Mey UCLA 1 Analysis of Oct. 04 Test Beam RPC Data Jay Hauser, Martin von der Mey University of California Los Angeles.
US CMS DOE/NSF Review: June 2002, Darin Acosta, University of Florida1 Muon Track-Finder Trigger Darin Acosta University of Florida June, 2002.
CSC Trigger Report: Results from June 25 ns beam test Production plans Software Darin Acosta University of Florida.
The Track-Finding Processor for the Level-1 Trigger of the CMS Endcap Muon System D.Acosta, A.Madorsky, B.Scurlock, S.M.Wang University of Florida A.Atamanchuk,
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
15 Sept 2009G. Rakness (UCLA)1 Paper progress On the Analysis Review Committee for the paper: “Performance of the CMS Cathode Strip Chambers with Cosmic.
13 March 2007G. Rakness (UCLA) 1 Minus side slice test status Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Status of the CSC Track-Finder Darin Acosta University of Florida.
Track-Finder Trigger at the Beam Test Results and Features Darin Acosta, Rick Cavanaugh, Victor Golovtsov, Lindsey Gray, Khristian Kotov, Alex Madorsky,
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Muon Port Card, Optical Link, Muon Sorter Upgrade Status M.Matveev Rice University December 17, 2009.
CSC Synchronization documentation Step-by-step procedure to… – Read out a chamber – Synchronize triggers from many chambers (and read out data) Description.
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
CSC Endcap Muon Port Card and Muon Sorter Status Mikhail Matveev Rice University.
10/06/09 UCLA Meeting Hauser 1/14 really Various updates Update on LHC schedule: Beam to Alice starts ~Oct. 24. Not all sectors are cold. Circulating beam.
Tests of the Fully Loaded CSC Track Finder Backplane M.Matveev S.-J. Lee Rice University Alex Madorsky University of Florida 2 May 2005.
CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
Track-Finder Test Beam Results Darin Acosta. Darin Acosta, University of Florida 30 July 2004 Trigger Meeting CSC Beam Test (Muon Slice Test) ME.
Tridas Week, November 2000Darin Acosta1 Status of the CSC Track-Finder D.Acosta, A.Madorsky, S.M.Wang University of Florida B.Cousins, J.Hauser, J.Mumford,
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, September 2004 Trigger Report - 1 CSC Trigger Muon Port Card & Sector Processor in production Mezzanine.
US CMS DOE/NSF Review, 20 November Trigger - W. Smith1 WBS Trigger Wesley H. Smith, U. Wisconsin CMS Trigger Project Manager DOE/NSF Status.
US CMS DOE/NSF Review: April 11-13, Trig. - Estimate to Complete.
13 March 2007G. Rakness (UCLA) 1 RPC efficiency in RAT Greg Rakness University of California, Los Angeles UCLA phone meeting 13 March 2007.
Electronics Review, May 2001Darin Acosta1 OPTICAL SP 1 Muon Sorter 3  / port card 3  / sector ME1 ME2-ME3 ME4 SR DT TF SP From CSC Port Cards MS MB1.
22 Sept A slight reformulation of (ALCT) muonic timing… In terms of brass tacks.
M.Matveev Rice University March 20, 2002 EMU Muon Port Card Project.
3 Nov 2009G. Rakness (UCLA)1 Weekend of 24 – 25 October Loaded all TMB firmware –Version 15 Oct 2009 XML file created using Jay’s muonic timing constants.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
10/20/09 UCLA Meeting Hauser 1/9 Various updates Update on LHC/CMS schedule: First shots into collimator: Nov. 7 and 8! Circulating beam ~Nov. 18, less.
CMS Week, 3-7 November CSC Trigger Test Beam Report Cast of many.
6 April 2007G. Rakness (UCLA) 1 CSC runs at minus side slice test 27 Mar – 5 Apr Color scheme: Successes Problems/questions Greg Rakness University.
Update on “Muonic Timing” of CSC Electronics
Timing/Synchronization Status
Update on CSC Endcap Muon Port Card
CSC Synchronization Procedure and Plans
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
Muon Track-Finder Trigger
“Golden” Local Run: Trigger rate = 28Hz
CMS EMU TRIGGER ELECTRONICS
Overview: Introduction to LHC Overview of CMS
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
Regional Cal. Trigger Milestone: Production & Testing Complete
CSC Trigger Primitives Test Beam Studies
CSC Trigger Muon Port Card & Sector Processor in production
New Calorimeter Trigger Receiver Card (U. Wisconsin)
Changes in Level 1 CSC Trigger in ORCA by Jason Mumford and Slava Valuev University of California Los Angeles June 11,
CSC Trigger Meeting Summary
Global Trigger and Global Muon Trigger
Sector Processor Status Report
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

CMS Latency Review, 13th March 2007CSC Trigger 1 Latency and Synchronization update

CMS Latency Review, 13th March 2007CSC Trigger 2 Latency: Sources of numbers 1. previous numbers were measured! u Components individually measured/understood by responsibles* except the CSC-->DT part. l UCLA l RICE l Florida u System measured as a whole during 2003 testbeam u System partially re-measured 2005 at slice-test u System partially re-measured 2006 at MTCC & overall validation vs DT arrival GMT understood. 2. The new numbers presented today reflect well- understood “deltas” from previous estimates

CMS Latency Review, 13th March 2007CSC Trigger 3 (Previous) Chamber + Peripheral Crate Chamber, CFEB, AFEB, ALCT MPC TMB/CLCT Chamber; TOF, AFEB, CFEB, ALCT 10bx Cables (8-14.5m) incl mux /demux 4bx 14bx muon to peripheral crate TMB/CLCT19bx Backplane incl (de)mux 2bx MPC5bx Optical fibers (94m) 2m coil+2m spare 19 bx 45bx peripheral crate to track-finder 14.5m cable 94m optical fibers SP 11m cables to GMT MS SP (using BXA)13bx Backplane incl GTLP conversion 0.5bx MS6bx 11m Cables to GMT2 bx SP+cables(9m)+transition card to DT-TF 8 bx 21.5 bx track-finder crate to GMT 8bx track-finder crate to DT-TF Cathode/Anode Front End Board Cathode/Anode LCT finders Trigger Mother Board Muon Port Card Sector Processor Muon Sorter

CMS Latency Review, 13th March 2007CSC Trigger 4 (previous)..add it up: Chamber --> Peripheral Crate14 bx Peripheral Crate--> Track- finder 45 bx Track-finder --> GMT21.5 bx Total Chamber-->GMT80.5 bx +/- 1 Total Chamber-->DT-TF67 bx +/-1 Critical path

CMS Latency Review, 13th March 2007CSC Trigger 5 CSC  DTTF Critical Path n This path is too slow: u CSC primitives a bit slower than TDR estimate u DTTF a bit slower than TDR estimate u CSC primitives arrive at DTTF at 67 bx u (this path not broken out in the TDR) n Revised estimate using TMB2005 firmware u 64.2 bx CSC primitives arrive at DTTF n New estimate using TMB2007 firmware u 62.2 bx CSC primitives arrive at DTTF

CMS Latency Review, 13th March 2007CSC Trigger 6 (TMB2005) Chamber + Peripheral Crate Chamber, CFEB, AFEB, ALCT MPC TMB/CLCT Chamber; TOF, AFEB, CFEB, ALCT 12bx Cables (8-14.5m) incl mux /demux 3.2bx 15.2bx muon to peripheral crate TMB/CLCT16bx Backplane incl (de)mux 1bx MPC5bx Optical fibers (94m) 2m coil+2m spare 19 bx 41bx peripheral crate to track-finder 14.5m cable 94m optical fibers SP 11m cables to GMT MS SP (using BXA)13bx Backplane incl GTLP conversion 0.5bx MS6bx 11m Cables to GMT2 bx SP+cables(9m)+transition card to DT-TF 8 bx 21.5 bx track-finder crate to GMT 8bx track-finder crate to DT-TF Cathode/Anode Front End Board Cathode/Anode LCT finders Trigger Mother Board Muon Port Card Sector Processor Muon Sorter

CMS Latency Review, 13th March 2007CSC Trigger 7 Revised estimate using TMB2005 firmware n CSC  DTTF total 67  64.2 bx, difference is -2.8 bx n Front-end is +1.2 bx: u -0.8bx because critical path is actually ME4/1, not ME1/1 (longer optical fibers to SP), Skewclear are shorter. u +1.0bx maximum drift delay 3 bx, not 2bx. u +1.0bx because comparator delay to peak of CFEB amplifier output better set at 3 bx, not 2 bx. n TMB processing is -3 bx: u previously waited for ALCT before CLCT started “pretrigger” stage (configuration mistake, i.e. “pilot error”) u 19 bx  16 bx (TDR was 15.5) n TMB  MPC is -1 bx: u previously overestimated backplane propagation as 2 bx

CMS Latency Review, 13th March 2007CSC Trigger 8 New estimate using TMB2007 firmware n CSC  DTTF total 67  62.2 bx, difference is -4.8 bx n TMB processing 16  14 bx: u -1.0 bx in CLCT processing I/O synchronization: input from CFEB save 0.5 bx, output to TMB matching logic with ALCT save 0.5 bx. u -1.0 bx in internal processing of ALCT-CLCT matching.

CMS Latency Review, 13th March 2007CSC Trigger 9 Details:

CMS Latency Review, 13th March 2007CSC Trigger 10 Latency Summary n CSC-TF path: u Previous estimate 80.5 bx u This is reduced to 77.7 bx currently u Reduces to 75.7 bx with new firmware (compare to TDR 78 bx) n CSC  DTTF path: u Previous estimate 67 bx u This is reduced to 64.2 bx currently u Reduces to 62.2 bx with new firmware u No TDR estimate, but DTTF waits for CSC primitives starting at bx 60 (Janos Ero, longer-than-anticipated optical cables)

CMS Latency Review, 13th March 2007CSC Trigger 11 Synchronization spreadsheet update n Spreadsheet: re-ordered plots sensibly and added a “key” to describe all the Excel plots alct_tx vs skewclear (ns)Alct_tx_clock_delay settings (2.2 ns/bin) are seen to be clearly related to the skewclear cable delay (ns), with a slope of -2 and a wrap-around every 12.5ns in Skewclear delay length. alct_tx_clock_delay comparison Same as previous, except plot the alct_tx_clock_delay in units of ns, and plot against 2*(65-skewclear_delay) (ns) and see the slope=1 and wrap-around every 25 ns. The y-intercept is 10 ns.

CMS Latency Review, 13th March 2007CSC Trigger 12 Sync Spreadsheet: updating parameters after “pilot error” fix n L1A timing looks much more sensible

CMS Latency Review, 13th March 2007CSC Trigger 13 Comments n Data taken with various comparator thresholds u Quick look: 12mV best? Would like to verify with DQM and other offline study u Use 12 mV for subsequent studies n Best trigger timing settings? u Data taken with various drift_delays for ALCT and CLCT u Data taken with various comparator delays to peak u Data taken with various “triad persistence” values u NEED information on what happens to trigger efficiencies u Also need to run with new pattern-finding firmware as soon as it’s ready to verify some of the settings.

CMS Latency Review, 13th March 2007CSC Trigger 14 ALCT fine delays n Dayong “test” of analysis: revert to old firmware phases, try diddling fine delays a little, take data and see if he can find the offset. n Also, a few typos to fix (mine) in getting from Misha’s numbers to the XML file. n Otherwise, new TMB clocking phases should result in constant offset in clock time to all ALCTs, should be invisible to cosmic ray data – to verify. n Then, apply Dayong corrections – is relative timing perfect? n I still want to “predict” ALCT fine delays with spreadsheet… just need a few hours analysis time…

CMS Latency Review, 13th March 2007CSC Trigger 15 Comments I n Best trigger timing settings? u 12 mV deemed best comparator threshold, but is it? u Data taken with various drift_delays for ALCT and CLCT u Data taken with various comparator delays to peak u Data taken with various “triad persistence” values u NEED information on what happened to trigger efficiencies n New pattern-finding firmware: u We’d like to verify some of the timing settings (some will change, e.g. pretrigger earlier with 2 layers rather than 4). u Changes to CLCT/TMB emulator code will be needed (Slava).

CMS Latency Review, 13th March 2007CSC Trigger 16 Comments II n TMB qualities: 4-bit = 16 choices: 6 di-strip qualities gone u Can get by for now just using 10 out of 16 qualities u Slava: reassignment of qualities should be intimately connected with accelerator vs. collision muons question. u Nobody thought through accelerator muons all the way: l Tailor ALCT collision patterns specific to chamber? l ALCT accelerator patterns switched on? l What priority do accelerator muons have? (currently TMB  low quality, but people do want accel. muon trigger) l The SP doesn’t yet handle accelerator muons appropriately (horizontal coincidence)