A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010.

Slides:



Advertisements
Similar presentations
Day-Ahead Market Coupling Proposal for algorithm approval process 8 th ACER Coordination Group for ERI Brussels, 9 th January 2012.
Advertisements

Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Deliverable I.4 Balancing (15th IG meeting, Paris, April 7th 2014)
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
8 th IG-Meeting Coordinated Auctioning, Auction Office and Organisational Issues Christian Todem Vienna
Action plan covering 2008 activities for the implementation of day-ahead implicit auction in Central-South Europe as a mean to allocate cross border capacity.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
15 th September 2013 Enagás and TIGF Information to NRAs.
1 Eurostat Unit B1 – IT Systems for Statistical Production IT outsourcing in Eurostat – our experience Georges Pongas, Adam Wroński Meeting on the Management.
GPA Renewable Energy Resource for Guam Power Authority
A case of Armenia: Legal framework for E-procurement in Public Procurement Sector Mr Karen Brutyan, PhD, PFM and PP EBRD Consultant, Wolf Theiss 1-2 December.
Allocation Rules Martin Apko CAO Central Allocation Office GmbH 30 February 2009, CEE Implementation Group, Vienna.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Lecture 2b: Software Project Management CSCI102 - Introduction to Information Technology B ITCS905 - Fundamentals of Information Technology.
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Washington Metropolitan Area Transit Authority Pre-Proposal Conference Sourcing and Contracts Management System (CMS) Solution Request for Proposal FQ
Software project management
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
T HE T RANSITION OF HCS C ASE M ANAGEMENT TO MRA S ERVICE C OORDINATION.
Culture Programme - Selection procedure Katharina Riediger Infoday Praha 10/06/2010.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
1 The Initial Report Preparation Guidelines. 2 The Initial Report u Definition of project scope u Project aims and objectives u Initial project plan.
PCR Status report AESAG, September Supported by:
Chapter 6 : Software Metrics
_________ CASC.EU Intraday Forum _________ ROME, March 13 th, Intraday Forum, ROME, 2012/03/13.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
WG FBA Status Report Andrzej Detkiewicz IG, 30 ty January 2008.
Actions for establishing a Single Auction Office for CSE 9 th IG Meeting Milan, 18 th July 2008.
1 Auction Office establishment, antitrust issues and Project Plan IG Meeting, Vienna January 30 th 2008.
ICT, Integration, Culture and Tolerance Education and Culture Lifelong Learning Programme GRUNDTVIG
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
The Status Report for IG meeting Wojciech Jarosz February 13 th 2009.
How do CEE countries benefit from improved regional cooperation? from the Czech TSO perspective The Regional Initiatives - Progress and Prospects Joint.
1 Designing Effective Programs: –Introduction to Program Design Steps –Organizational Strategic Planning –Approaches and Models –Evaluation, scheduling,
WG FBA report Dr. Uroš Gabrijel (ELES) IG Meeting, Vienna, 13 February 2009.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
Investment workstream 19 May 2009 Cross-border gas transmission‏ Investment project GRI NW (I1) Opening of the Day 2 nd Investment workshop GRI NW.
Electricity Regional Initiative Central Eastern European Region Congestion Management – Status & Prospects Tahir Kapetanovic E-Control CEE Stakeholder.
3 rd Stakeholders Group Meeting Project status and details of the ongoing development of the load-flow based capacity calculation/allocation system CEE.
ACP S&T Programme - Stakeholder conference October Implemented by the ACP Secretariat Funded by the European Union EDULINK - ACP Science and.
Implementation of Transparency Guidelines Martin Reisner Advisor Current Status and future Challenges Ljubljana – 13 September 2012.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
TIPEIL LLP-LDV/TOI/07/IT/019 First Transnational Workshop Athens, 7-8 February 2008 Venue: IEKEP - 34A Averof str. in Nea Ionia 1 st floor PROJECT MONITORING.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
In September of 2012 the RA Government made amendments in the Resolution No 168 on ‘Regulation of Procurement Procedures". 1. It is the responsibility.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
1 WG FBA report Uroš Gabrijel IG Meeting, Vienna, May 9th 2008.
Technical Assistance Office 1 Contract, Reports and errors to avoid! GRANT AGREEMENT 2005 Comenius coordinators’ meeting, 17/10/2005 Maryline Fiaschi,
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Business Process Review Academic Registry Student Systems and Administration Business Process Review Team Karen Williams February 2008.
Christophe Gence-Creux SG FUI, Paris, 4 th November. Target models and roadmap proposed by the PCG.
AUDIT STAFF TRAINING WORKSHOP 13 TH – 14 TH NOVEMBER 2014, HILTON HOTEL NAIROBI AUDIT PLANNING 1.
Collaborative Decision Making (CDM) Saulo Da Silva
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Supported by: PCR Status report AESAG, September
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
Recognization and management of RISK in educational projects
Supported by: PCR Status report AESAG, September
Five-Minute Settlement Program: Executive Forum 1
Amendment Invoice Task Force Progress Report
29th April 2014 Teleconference
X-DIS/XBRL Phase 2 Kick-Off
DG Employment, Social Affairs and Inclusion
Financial Control (FC)
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

A DVANCED A LLOCATION S TARTS W ITH U S ! CAO P ROGRESS REPORT 21 ST IG M EETING 26 J ANUARY 2010

A GENDA  Interim Solution Auctions  Results of External Dry-run Phases  Response to Issues Raised by Market Participants  Progress of Internal Dry-run Phases CAO Freising GmbH2

I NTERIM S OLUTION A UCTIONS CAO Freising GmbH3

I NTERIM P HASE S TATUS  CAO has started its operation supporting the interim phase of capacity allocation in 2009: Introduction of one point of registration for the auction procedures for the CEE region Common point bringing information about auction procedures and its results Taking over the role of the auction office for 5TSOs, supported by CEPS with run of the allocation IT (includes full registration process and financial settlement) Yearly auction for 2010 and monthly auctions for Jan. and Feb successfully organized CAO Freising GmbH4

I NTERIM P HASE S TATUS  CAO fulfilled all contracted deadlines  Experience achieved: Operational staff trained for future regional process Relationship with market participants established also on working level Provision of services after the implementation phase (i.e. since beginning of the year 2010) require minimum efforts and is going smoothly CAO Freising GmbH5

R ESULTS OF E XTERNAL D RY - RUN P HASES CAO Freising GmbH6

E XTERNAL D RY - RUN P HASES  Phase I organized in period goal − IT solution and its functionalities introduction − testing of bidding strategy (i.e. auction algorithm application)  Phase II organized in period goal − introduction of IT solution adjustment − testing of auction algorithm application after publication of detailed auction algorithm specification CAO Freising GmbH7

E XTERNAL D RY - RUN P HASES  Phase III planned to be started in January 2010 goal − testing of bidding strategy with completed parameterization of the technical parameters calculation process − analysis of available capacities (comparison to NTC) postponed due to not finalized internal analysis phase CAO Freising GmbH8

P ARTICIPANTS OF D RY -R UN CAO Freising GmbH9 Number of Dry-run participants

S UMMARY OF P HASE I EVALUATION (I/III)  Even influenced by low level of available capacities few issues detected learning effect of bidders (2 auctions with equal parameters per day) − increase of prices respectively increase of requested volumes in second auction of the day direct bids vs. neighbor to neighbor bids − as shown on picture source-sink bids lead to decrease of market participants risks (higher efficiency of allocation) CAO Freising GmbH10

S UMMARY OF P HASE I EVALUATION (II/III) Comparison of auction prices of external dry run Phase I – direct bids vs. neighbour-to-neighbour bids Source: CONSENTEC 11CAO Freising GmbH

S UMMARY OF P HASE I EVALUATION (III/III)  Critical effect of bidding behaviour unrealistic bidding (extremely high bids or very low amount of requested capacity) has mainly two consequences − dry run results must not be interpreted as a realistic estimate of future real outcome of the FBA − any potential improvement of the technical parameters calculation process parameterization should not be assessed on the basis of the External Dry Run data, because the effects due to the bid structure mask the influence of technical aspects The CAO and the CEE TSOs are performing separate analyses for this purpose. CAO Freising GmbH12

R ESPONSE TO I SSUES R AISED BY M ARKET P ARTICIPANTS CAO Freising GmbH13

I SSUES R AISED BY M ARKET P ARTICIPANTS (I/IV)  Availability of information on scheduling TSOs supported by CAO published requested information in agreed time A workshop was organized on in Munich (Germany), for market participants in order to discuss and explain the published specifications. After the workshop TSOs supported by CAO published amended information on individual market rules changes as requested during the workshop – including XML files examples and contact details of TSOs scheduling experts. CAO Freising GmbH14

I SSUES R AISED BY M ARKET P ARTICIPANTS (II/IV)  Availability of information on CAO IT interfaces CAO published specification of CAO IT interfaces on (i.e. in agreed time) A workshop was organized on in Munich (Germany), for market participants in order to discuss and explain the published specification. After the workshop CAO published answers to issues raised at the workshop under Frequently Asked Question (FAQ) on the web page. CAO nevertheless agrees that more detailed documentation of the interfaces would be useful for market participant and undertakes the task of improving it. CAO Freising GmbH15

I SSUES R AISED BY M ARKET P ARTICIPANTS (III/IV)  Effects of CAO IT development CAO-IT and its interfaces are based on software already presented on some other regional auction offices across Europe. CAO did, and will in the future, follow the good practice implemented in CEE regional auction offices and abroad. This way the changes for market participant will have less affected and the adoption will be eased. CAO-IT is a growing system and will stay that way in the future. However this doesn’t mean that the functionalities will change without informing, testing and clear description to market participant. CAO will establish a management process of tracking change and offering test with purpose of adaption of changes. Manual processing of the data is not necessary. CAO offer possibility of bilateral test procedures to be organized according to agreed schedule with individual market participants. CAO Freising GmbH16

I SSUES R AISED BY M ARKET P ARTICIPANTS (IV/IV)  Auction Rules Auction Rules have been provided to market participants via national regulatory authorities for consultation process. Results of consultation process delivered to CAO and CEE TSOs are subject of evaluation and will be subject of the discussion with regulatory authorities. CAO Freising GmbH17

P ROGRESS OF I NTERNAL D RY - RUN P HASES CAO Freising GmbH18

S TATUS OF IT I MPLEMENTATION  During the internal dry-run process and efficiency analysis supported by Consentec TSOs and CAO identified need of some adjustments/corrections in process of Technical Parameters Calculation. Final Acceptance of IT is planed for February 2010 Few updates to be implemented after the acceptance Source of potential additional updates – requirements for changes in auction rules CAO Freising GmbH19

E FFICIENCY A NALYSIS  As identified also by market participants during the first phase of the external dry-run low level of available capacities was detected in first technical parameters calculations  CAO and TSOs with support of Consentec made analysis of this problem Adjustment of process of CGM creation Complications in process parameterization Unequal risk level applied by individual TSOs CAO Freising GmbH20

Thank you for your attention! A DVANCED A LLOCATION S TARTS W ITH U S ! CAO Freising GmbH21