1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.

Slides:



Advertisements
Similar presentations
Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
26-Sep-11 1 New xTCA Developments at SLAC CERN xTCA for Physics Interest Group Sept 26, 2011 Ray Larsen SLAC National Accelerator Laboratory New xTCA Developments.
Ray Larsen Chris Adolphsen Chris Nantista ARD Division SLAC National Accelerator Lab ILC GDE Meeting Beijing March
The System Development Life Cycle
December 6, 2007AIP /02 P Bellomo - QE Magnet Power System Upgrade1 AIP /02 Review LINAC SECTORS 22 AND 23 QE MAGNET POWER SYSTEM UPGRADE.
The Implementation Strategy Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen.
Panorama Consulting Group LLC ERP Assessment, Selection, and Planning SAMPLE APPROACH.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Dayle Kotturi Controls April 29, 2004 Injector Controls LCLS Facility Advisory Committee April 29-30, 2004 Outline Description.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Hamid Shoaee LCLS FAC Controls June 17, LCLS Control System Personnel Linac & BC2 Controls progress LTU, Dump Controls.
Development Processes and Product Planning
Operational Strategies: Innovation A2 Business Studies.
Dayle Kotturi Facility Advisory Committee Meeting October 12, 2004 Injector/Linac Controls An overview of the status of each of.
Dayle Kotturi SLC April 29, 2004 Outline Motivation Key Components Status Update SLC / EPICS Timing Software Tasks Hardware.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Management Adrian Marshall.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
Status of mTCA Stripline BPM Development June 4-5, 2012 Dan Van Winkle for BPM team: Sonya Hoobler, Tom Himel, Jeff Olsen, Steve Smith, Till Straumann,
Question 27: Outline the key steps for industrialization of machine components and the likely remaining vulnerabilities in achieving them. Achieving industrialization.
RF Cavity / Coupling Coil Module
The planned new system Tom Himel Dec 1, Outline Controls has multiple related projects Decided to use mainly µTCA architecture Description of.
IT Project Management Cheng Li, Ph.D. August 2003.
October 24, 2000Milestones, Funding of USCMS S&C Matthias Kasemann1 US CMS Software and Computing Milestones and Funding Profiles Matthias Kasemann Fermilab.
SYS364 Evaluating Alternatives. Objectives of the Systems Analysis Phase determine, analyze, organize and document the requirements of a new information.
R McFadyen Chapter 10 Selecting the Best Alternative Design Strategy.
1 The George Washington University School of Engineering & Applied Science Department of Electrical & Computer Engineering Decomposition, Time Estimation.
Rev. 0 CONFIDENTIAL Mod.19 02/00 Rev.2 Mobile Terminals S.p.A. Trieste Author: M.Fragiacomo, D.Protti, M.Torelli 31 Project Idea Feasibility.
Slide 1 6-Nov-98PHOBOS Review: Cost & Schedule Cost & Schedule S. Steadman, MIT PHOBOS Cost & Schedule Review Technical Advisory Committee BNL November.
1 Application of New PICMG µTCA for Physics Specifications to Accelerator Control Ray Larsen, SLAC & Kay Rehlich, DESY TWEPP 2010 Workshop Aachen, Germany.
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
NLC MAC Meeting 6-8 Nov Linac Girder Studies and Plans C. Boffo Slide 1 Linac Girder Studies and Plans C. Boffo – E. Borissov – H. Carter Fermilab,
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
F Project X Overview Dave McGinnis October 12, 2007.
Cost Estimate Marion White (Argonne) SCU 3-Lab Review Meeting December 16, 2014.
Copyright 2009 John Wiley & Sons, Inc. Chapter 6 Project Activity Planning.
Operations, Test facilities, CF&S Tom Himel SLAC.
May, 2005(c) 2005, US Civilian R&D Foundation1 The U.S. Civilian Research and Development Foundation (CRDF) Industry Partner Development Program (PDP)
January LEReC Review 12 – 13 January 2015 Low Energy RHIC electron Cooling Kerry Mirabella Cost, Schedule, Personnel.
MTCA use in Linac to replace CAMAC Tom Himel June 4,
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
The recent history and current state of the linac control system Tom Himel Dec 1,
1 Global Design Effort: Controls & LLRF Controls & LLRF Working Group: Tuesday Session (29 May 07) John Carwardine Kay Rehlich.
DoE Review January 1998 Online System WBS 1.5  One-page review  Accomplishments  System description  Progress  Status  Goals Outline Stu Fuess.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
SLAC NLC & ILC Cost Modeling Ray Larsen January 28, 2006.
PMC xx/xxxx Project Title & Project Code Presenter:
Embedded Product Design. The Initial Concept of a Product l Top-level management –Composed primarily of engineers l Marketing –Feedback from customers.
RHIC 56 MHz Cryomodule Informational Review RHIC Integration Cross-sectional view of 56 MHz Cavity in Vacuum Vessel.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Welcome to the 4th meeting of the xTCA Interest Group M. Joos, PH/ESE1 Agenda: Next Meeting: During the TWEPP 2012 conference in Oxford SpeakerTitle M.
Marshalling the Troops - Tools that Facilitate the Management of Electronic Resources Yvonne Desmond, Faculty Librarian Brian Widdis, Assistant Librarian.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
Finance Roy Preece STFC RAL Oversight Committee Meeting 27 th November 2015.
Project X RD&D Plan Controls Jim Patrick AAC Meeting February 3, 2009.
XTCA Workshop Topic Suggestions Ray Larsen, SLAC TWEPP 2010 Workshop Aachen, Germany September 22, 2010.
Cost and Schedule Breakout Session Paul Weinman Pacific Northwest National Laboratory.
SCT Project Management Issues
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
EDR HLRF Work Packages Draft Summary
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
New xTCA Developments at SLAC
AIP /02 P Bellomo - QE Magnet Power System Upgrade
Preparations for a Lehman Review
J. Seeman Assistant Director for PPA/LCLS
RF System (HLRF, LLRF, Controls) EDR Plan Overview
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
LCLS Control System Personnel Linac & BC2 Controls progress
Presentation transcript:

1 The Cost & Schedule to Accomplish the Transition Proposed SLAC Controls Upgrade December 1, 2010 Ray Larsen

2 Outline Cost Model Strategy –COTS plus limited In-House development –Industry support - physics applications modules Resources –Hardware-Software-Firmware engineering; ARD xTCA program support; M&S Budgets –Controls; RF Schedule Development –MTCA infrastructure, IOC & Timing, Controls subsystems, RF Subsystem SLAC Linac Controls Upgrade Proposal

3 Telecom Industry Strategy Platform developed as open Telecom standard by group of strong competitors –Major change in philosophy of all company products proprietary and non-interchangeable Why? Better for company and customer to have products guaranteed to work together Company focuses resources on unique payload products, shorter time to market, lower development costs SLAC Linac Controls Upgrade Proposal

4 Physics Cost Model Strategy Base our standard on new platform adding improved I/O, timing features for physics –Benefit from industry technical assistance and building prototypes at their expense to launch, quicker learning curve for users –Physics package attracting Telecom, Industrial Control manufacturers –With market growth should benefit from multiple vendors and price competition SLAC Linac Controls Upgrade Proposal

5 Hardware Design Time/Cost Savings Dual Module Simplifies Design –Develop COTS solutions for complex AMCs –We plan to use no in-house AMC designs –Leverage COTS designs to multiple applications with minimum RTM engineering time/cost –Complex AMCs cost 1-2 SLAC Linac Controls Upgrade Proposal

6 Adapting Controls Subsystems Port existing front end interfaces onto RTMs 4 & 10 Ch Fast ADCs w/DAC RTM adapters: 1.Stripline BPMs (2 types) 2.Toroids (2 types, Linac & Beam Containment), Profile Monitor Gated ADC (Same as above) 3.RF Feedback 3-Industry Pack RTM Adapters: 4. Profile Monitor Beam Length (BLEN) 5. Vacuum gauge controller interface 6. Vac-ion pump controller interface 7. Wire scanner movers (Hytek) PMC Card AMC Adapter 8. Fast Frame grabber for Profile Monitor SLAC Linac Controls Upgrade Proposal

7 Budget Cost Analysis Resource Cost Estimates –All tasks detailed –Resources identified –Discussed details w/ resources for estimates –Summed resources vs. draft schedule –Performed similar exercise for RF (already approved AIP) –Totaled all manpower costs vs. time (24 mo.) SLAC Linac Controls Upgrade Proposal

8 Hardware Cost Estimates MTCA Infrastructure –COTS based on actual quotes or vendor budgetary quotes –Includes crate, power modules, Hub Controller, Processor IOC, Timing Module –Timing module not yet a commercial item but base cost on similar commercial products –Assumed infrastructure partly shared w/ RF AIP –First articles procured on ARD ILC R&D budget. SLAC Linac Controls Upgrade Proposal

9 Hardware Costs 2 Applications Modules –AMCs: ADC-DAC, 3-IP, PMC adapter ADC-DAC: Vendor quotes, DESY target (Strück); Vadatech quote pending 3-IP: quote in hand (TEWS) PMC: Quotes pending (Vadatech,TEWS) –US 2 nd sources: Buying first articles to specification, compatible RTM –Timing Source is Stockholm U., working to develop vendors SLAC Linac Controls Upgrade Proposal

10 Controls Upgrade AIP R&D Manpower Controls Total MW SLAC Linac Controls Upgrade Proposal

11 RF Upgrade AIP Manpower SLAC Linac Controls Upgrade Proposal RF 12 Mo. through Q1-12

12 Controls Total, Infrastructure & RTM MW SLAC Linac Controls Upgrade Proposal

13 Controls AIP Budget Summary SLAC Linac Controls Upgrade Proposal

14 Budget by FY for 1 RF Station (RA) Funded In2009 TOTAL Costed In FY 2009 FY 2010 FY2011 Funding ED&I (Eng., design & inspection) B&H (Buildings & hardware) Contingency Indirect Allocation TOTALS ,807

15 Estimated 10- Sector Cost T. Himel SLAC Linac Controls Upgrade Proposal  Assume LI11-20 Column costs  Solid state sub- booster required  Modulator PLC not required  BCS & Power Supplies Included  RF Station Unit Cost = $28K

16 Infrastructure Work Detail SLAC Linac Controls Upgrade Proposal

17 RTM Work Detail SLAC Linac Controls Upgrade Proposal

18 RF Subsystem Work Detail SLAC Linac Controls Upgrade Proposal

19 Upgrade Schedule Development Three components –MTCA Infrastructure Support (ARD program) –RF Station Demo (Approved AIP in progress) –Control Station Demo (AIP Proposal) Integrated draft schedule –Shows all relationships & milestones –Resource loading needs further work but first order matches available staff plus 3 new –Full Preliminary will be posted; top summary next slide LCLS RF Upgrade AIP Proposal 10/20/2010

20 Summary Schedule SLAC Linac Controls Upgrade Proposal

21 Conclusions RF subsystem critical path –Low-noise component evaluations for best possible phase stability ~10fs –Firmware & software Controls critical path –Hardware development of RTMs for 8 Apps –Firmware & software Both schedules needs adjustment –Some early items shown are behind schedule SLAC Linac Controls Upgrade Proposal

22 Conclusions 2 Resources & Budgets RF: –Estimate 1 additional FTE HW, SW –Budget & resource analysis still in progress Controls: –Estimate 2 additional FTEs at 1 HW, 1 SW –Included in proposed budget Management –Needs to be in both budgets but is not yet SLAC Linac Controls Upgrade Proposal