DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM.

Slides:



Advertisements
Similar presentations
Microsoft Project Tutorial for Chapters 6 & 7
Advertisements

Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
TUTORIAL 6 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 25/11/2012 Introduction to MS Project 2007.
PERTEMUAN 3 PPSI Microsoft Project Presentation. What is a Gantt Chart? A Gantt Chart is a visual tool to help Plan, Manage, and Track a project or projects.
MS Project Tutorial EMEN. Entering Project Properties Choose File Properties Click the Summary tab You can now enter general information about the project.
Microsoft Office XP Microsoft Excel
Decision Analysis Tools in Excel
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
Project Management - Part 2
PROJECT MANAGEMENT. Outline What is a “project”? Project Management Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time.
Microsoft Project.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
| | Tel: | | Computer Training & Personal Development Microsoft Office Project 2003 Intermediate.
TUTORIAL 3 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 14/10/2012 Introduction to MS Project 2007.
Projmgmt-1/18 DePaul University Evaluating Schedule In MicroSoft Project Instructor: David A. Lash.
McGraw-Hill/Irwin © 2006 The McGraw-Hill Companies, Inc., All Rights Reserved. 1 Chapter 3 part 2 Project Management.
Project Plan Optimization Lesson 13. Skills Matrix SkillsMatrix Skill Make time and date adjustments Adjust fiscal year settings within Microsoft Project.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Projmgmt-1/23 DePaul University Tracking the Progress of Your Project In MicroSoft Project Instructor: David A. Lash.
Projmgmt-1/15 Depaul University Adding Resources In MicroSoft Project Instructor: David A. Lash.
XP New Perspectives on Microsoft Office Excel 2003, Second Edition- Tutorial 11 1 Microsoft Office Excel 2003 Tutorial 11 – Importing Data Into Excel.
A tutorial on MS Project James Burns. Outline  Setting up MS Project  Defining Tasks (activity definition)  Activity Subordination (WBS)  Activity.
Microsoft Project Presentation By Corey Johnson 10/11/00.
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
Microsoft Office © Copyright William Rowan Objective By the end of this you will have being given a brief introduction to: Microsoft Word Microsoft.
Project Planning Using MS Project Creating a project plan URBS 609 Project, Unit 3.
Copyright © Software Process Group 1 Software Process Group Microsoft Project Tutorial Steve Meyers
OPSM 639, C. Akkan SAVE your existing MS Project File at the end of PART3 as _PART4 _PART4 WITH BASELINE. Make sure you keep the original file without.
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
Operations Management Contemporary Concepts and Cases Chapter Fourteen Project Planning and Scheduling Copyright © 2011 by The McGraw-Hill Companies,
Tracking progress on tasks and assignments TUTORIAL # 3.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Refining Your Project Plan Lesson 4. Skills Matrix SkillsMatrix Skill Apply a task calendar to an individual task Change task typesChange scheduling formula.
Abeer Bin Humaid. Project management is “the application of knowledge, skills, tools, and techniques to project activities in order to meet project requirements”
1 Microsoft Project 2010 Demo Part 1. 2 Project: Initial Screen To start click Project/Project Information. Add start date.
Defining Styles and Automatically Creating Table of Contents and Indexes Word Processing 4.03.
Copyright © 2008 Pearson Prentice Hall. All rights reserved. 1 1 Copyright © 2008 Prentice-Hall. All rights reserved. Committed to Shaping the Next Generation.
TUTORIAL 4 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 04/11/2012 Introduction to MS Project 2007.
 Starting Excel 2003  Using Help  Workbook Management  Cursor Management  Manipulating Data  Using Formulae and Functions  Formatting Spreadsheet.
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
MS project Abeer Bin Humaid. What is project management? Project management is “the application of knowledge, skills, tools, and techniques to project.
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Consolidate Consolidate Multiple Worksheets to a Single Sheet in Excel.
Ahmad Al-Ghoul. Learning Objectives Explain what a Microsoft Project environment and Project Server. Describe how to use the Ribbon, Quick Access Toolbar.
Microsoft Project Tutorial for Chapters 4 & 5 This Tutorial explains how to: Build a MSP Project Network Build a Probabilistic MSP Network Use the Calendar.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTRODUCTORY COURSE.
1 Microsoft Project Pro CHAPTER 4 Viewing Project Information.
TUTORIAL 7 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 08/04/2012 Introduction to MS Project 2007.
Microsoft Project – Tutorial 4 Leveling Overallocations In some cases, a resource could be assigned more work in a given time period than it has working.
TUTORIAL 9 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 22/04/2012 Introduction to MS Project 2007.
TUTORIAL 8 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 15/04/2012 Introduction to MS Project 2007.
Lesson 01: Introduction to Database Software. At the end of this lesson, students should be able to: State the usage of database software. Start a database.
Premium 2011 Setting Up the INVENTORY & SERVICES Module.
DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 1 andand PERT CPM.
A tutorial on MS Project James Burns. 22 Learning Objectives  Entering Tasks in the Gantt View  Task subordination  Linking of Tasks  Setting start.
Project Plan Tracking – Fundamentals Lesson 8. Skills Matrix SkillsMatrix Skill Establish a project baseline Track a project as scheduled.
Microsoft Office 2013 Try It! Chapter 4 Storing Data in Access.
Microsoft Project 2010 ® Tutorial 4: Assigning Resources and Costs.
Microsoft Project 2010 ® Tutorial 1: Planning a Project.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Project Planning & Scheduling What is a “project”? Objectives and tradeoffs Planning and Control in Projects Scheduling Methods Constant-Time Networks.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
Application Extension 10a
Project Planning & Scheduling
Project Planning & Scheduling
A tutorial on MS Project
ENGINEERING MANAGEMENT (GE 404)
PROJECT MANAGEMENT Bill Biddle.
ENGINEERING MANAGEMENT (GE 404)
Presentation transcript:

DECISION MODELING WITH MICROSOFT EXCEL Chapter 14 Copyright 2001 Prentice Hall Publishers and Ardith E. Baker Part 3 andand PERT CPM

__________software, such as Microsoft Project 98, makes the task of project management easier. In particular, this software greatly _____________the processes of generating the links between tasks and giving us a __________view of the critical activities and the whole project. Microsoft Project 98Microsoft Project 98P ROJECT MANAGEMENT USING MICROSOFT PROJECT SOFTWARE Unfortunately, such software cannot do the ______________and it requires an additional add-in for Project) to do any sort of _________ of results on random completion times. In spite of these minor drawbacks, most projects are managed with the help of _________like MS Project.

The impending move of the credit card operation to Des Moines, Iowa, from the home office in Dallas is an important project for Global Oil. A PROJECT MANAGEMENT EXAMPLE: GLOBAL OIL CREDIT CARD OPERATION The board of directors of Global has set a firm deadline of 22 weeks for the move to be accomplished. First, ______ the project activities and their ____________ predecessors.

To enter these activities in MS Project, first go to View Gantt Chart from the ______menu and choose Gantt Chart. Then, simply enter the 10 __________ and their expected____________. Note: MS Project consistently refers to these activities as “_______.” Therefore, tasks and activities will be used interchangeably.

Also, the __________for tasks 1 and 2 will arbitrarily set to 9/4/00. The next step is to create the “______” between the activities (i.e., establish the ___________relationship between the activities). Earlier, it was established that activity F is an immediate predecessor of activity G. MS Project calls this a “___________” link, meaning activity F must finish _______activity G can start. Note: MS Project numbers the activities 1-10 rather than using ________designations.

To enter this in MS Project, first click on activity F, then holding down the Ctrl key, click on activity G to select it and then click on the Link icon of the main menu.

Note that the ________in which you choose the activities is very important! If we would have selected activity G first and then activity F, MS Project would have assumed the _________ relationship. In order to accomplish this __________with multiple predecessors, you must enter each relationship ___________. For example, activities A and C are immediate predecessors for activity D. First, holding down the _____key, click on A and D, then click on the _____ button. Next, click on___________, hold down the Ctrl key, click on activity D and then click on the Link icon.

This _________tells MS Project that both activities A and C must be _________before activity D can start. Here is the final result after entering all of the immediate predecessors. Once this information is entered, MS Project automatically does the __________and __________ passes.

To see a network diagram, simply click on View – PERT Chart. Notice that the critical path (B-C-D-E-J or ) is displayed in red.

To display the _______for each of the activities, click on View – More Views … – Detail Gantt – Apply. ___________activities are shown in red, noncritical activities in blue. Slack time is indicated __________with thin blue lines with the actual value written out at the end of the__________.

MS Project requires an additional for Project) to do any sort of simulation of results on _________completion times. all we can do is enter __________ times, most probable times, and ____________times for each activity. Then, MS Project will display an optimistic _______ chart, a ___________Gantt chart and a pessimistic Gantt chart. To enter the _______of times for each activity in MS Project, we select View – Toolbars>, PERT Analysis which adds a new toolbar to the menu.

From the new________, select the PERT Entry Sheet icon and enter the information as displayed in the chart shown below. Once this data is entered, you can choose to look at any of the three available ________(optimistic, most probable, pessimistic) by clicking on one of the three new icons for this purpose on the new toolbar.

Clicking on this icon displayed the pessimistic Gantt chart shown here. Note that the expected completion time for the whole project has grown from 100 days (20 weeks) to 175 days (35 weeks).

As far as time-cost trade-offs are concerned, MS Project cannot do ______programming optimization to determine what would be the best way to ______ the total project time. You can however, add additional “___________” to each activity to reduce the time it would take. For example, activity A had an expected completion time of 3 weeks and MS Project assumes _____effort (or 1 person). We can decide to ________200% effort on this task (or 2 people) thereby reducing the expected completion time to______________.

To do this in MS Project, first create a _________that corresponds with each __________and then link the resources with the activities as outlined below: 1. On the View menu, click Resource Sheet. 2. On the View menu, point to Table:> and then click Entry. 3. In the Resource Name field, type a resource name in a blank field (e.g., Select Site) 4. Repeat the above steps for all 11 tasks. The other option that MS Project offers for creating resources is to ______individual workers by name that are ___________to work on the tasks.

The next step is to make the ______________for the software between the 11 resources and the 11 activities as outlined below: 1. Select View – Gantt Chart. 2. In the Task Name column, select the task to which you want to assign a resource (e.g., Select Office Site). 3. Click on the Assign Resources icon to open the Assign Resources table. 4. In the Name column, select the resource you want to assign to the task (e.g., Select Site). 5. Click Assign (a check will appear to the left of the Name field indicating the assignment). 6. Repeat these 5 steps for all 11 tasks.

At the completion of these steps, you should have a list of tasks and resources similar to this: Select Office Site Select Site Create Organizational and Financial Plan Create Plan Determine Personnel Requirements Personnel Reqmts Design Facility Design Facility Construct Interior Construct Select Personnel to Move Select Personnel Hire New Employees Hire New Move Records, Key Personnel, etc. Move Records Make Financial Arrangements … Make Financial Train New Personnel Train Secure Training Facility Secure Training Task/Activity Corresponding Resource

Clicking on the Assign Resources icon from the main menu will bring up a small ______listing all the resources assigned to each task and the current _________being expended. Changing the “____” from 100% to 200% and clicking on Assign will cut the expected time for the activity in________.

A nice feature of MS Project is the ability to keep track of the ________on the project. To do this, first enter all available______________ by clicking on View – Resource Sheet. This brings up a _______table in which you can enter each of the resources and their _________ (weekly) costs.

Of even greater value is the ability to _______the charts with the ___________of completion for the different activities and see what costs should have ________according to the prorated budget. First, you must ___________the activity for which you want the enter some information (e.g., activity A, Select Office Site). Next, click on Tools – Tracking> - Update Tasks to open the following menu. Enter the % ____________in the edit field.

After doing this for all 11 activities, click on Project – Project Information 3 – Statistics 3 to display the cost information that MS Project has now calculated. So far it indicates that we should have spent $18,500 of the budgeted total of $90,500, with about 45% of the actual project duration (days) completed.

In order to calculate the ______and remaining costs, MS Project has assumed that each activity is coming in right on its ________(i.e., no cost variance at all). However, this is not a _______scenario. To update the actual cost figures, follow the steps outlined below: 1. Click on Tools – Options and go to the Calculations tab. 2. Clear the Actual costs are always calculated by Microsoft Project check box. 3. Click OK 4. Click View – Task Usage

5. Click View, point to Table: (default name)> and click on Tracking. 6. Go to the Format menu, point to Details> and click on Actual Cost. This will result in the following table. Simply enter the actual costs to date for each activity shown.

MS Project will now be able to calculate the updated cost information. To view it, click on Project – Project Information – Statistics. You can see that the actual total costs to date are $22,100 and that the total project budget is now projected to be $95,600 (a cost overrun of $3,600).