June 2008 Windsor-Essex Electrical Service Needs and Solutions.

Slides:



Advertisements
Similar presentations
Central Vermont Public Service SOUTHERN LOOP COOLIDGE CONNECTOR Coolidge Connector Community Working Group April 30, 2007.
Advertisements

Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Canada Committed to a Nuclear Future Presented to the 15 th Pacific Basin Nuclear Conference by Milton Caplan President, MZConsulting Inc October.
RPG: September 24, Approach for ERCOT Independent Review of the 2013 Houston Import Project Jeff Billo, Manager, Transmission Planning September.
Rate Plan. Value Story When asked, our customers identify the following topics as ways MidAmerican Energy provides value – Emergency Response.
Procuring Our Way to Compliance IEP 27 th Annual Meeting September 23, 2008 Fong Wan, PG&E.
1 Transformation Presentation to the Public Sector Management Workshop June 1,
Making Clean Local Energy Accessible Now Storage Bid Evaluation Protocols Role of CEP, Quantifiable Benefits Stephanie Wang Policy Director Clean Coalition.
TERRACE TO KITIMAT TRANSMISSION PROJECT UPDATE Feb/March 2015.
Kansas Renewable Energy and Energy Efficiency Conference Wind 2007 RFP Update John Grimwade - Sr. Director Strategic Planning and Development September.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Ontario Electricity Industry : Planning Ahead Amir Shalaby VP, Power System Planning Ontario Power Authority Presentation to Canadian Nuclear Society The.
1 JULY 2010 PRELIMINARY TECHNICAL CONFERENCE REPORT – WORK IN PROGRESS Session 4 Discussion of Alternatives and Implementation Activities for Real- Time.
Compare and Contrast ELCC Methodologies Across CPUC Proceedings
Economic Analyses of FPL’s New Nuclear Projects: An Overview Dr. Steven Sim Senior Manager, Resource Assessment & Planning Florida Power & Light Company.
Biogas Workshop 10 th March 2009 ANF Energy Solutions Inc Power Purchase & Connection Power Purchase and Grid Connection Procedures Aidan Foss ANF Energy.
Conservation & Demand Management July 2004 – September 2007 Joyce McLean Director, Strategic Issues Toronto Hydro
Reliability Pricing Model (RPM) Overview Andrew Ott PJM Senior Vice President, Markets.
Public Information CentrePartners in Powerful Communities Welcome to our Public Information Centre.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
MINISTRY OF ENERGY Energy Storage Presentation to APPrO Storage Symposium November 19, 2014.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
West Contra Costa USD Presentation to the Facilities Subcommittee January 22, 2013.
Reliable Power Reliable Markets Reliable People Performance Targets for the Customer Interconnection Process January, 2008.
Update on Current EGNRET Projects APEC EGNRET 23 Meeting Christchurch, New Zealand ~ November 10-12, 2004 Jean Ku National Renewable Energy Lab, USA Cary.
Lyndonville Electric Department Feasibility Analysis Review December 2,
1 Distributed Energy Resources: Bringing Energy Closer to Home Presentation by the Industry Task Force on Distributed Generation July 28, 2005.
Net Metering Technical Conference Docket No PacifiCorp Avoided Costs October 21, 2008 Presented by Becky Wilson Executive Staff Director Utah.
Long-Term Electricity Report 1 Susan Gray September 27, 2010.
Demand Response: Keeping the Power Flowing in Southwest Connecticut Presented by: Henry Yoshimura Manager, Demand Response ISO New England September 30,
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Renewables Integration Development Project North West of the Island of Ireland Louis Fisher, EirGrid.
THE MIX: FACTS, FIGURES, AND THE FUTURE INDEPENDENT ENERGY PRODUCERS ANNUAL MEETING SEPTEMBER 26, 2013 William A. Monsen MRW & Associates Oakland, California.
Regulatory Planning for Supply to GTA & Toronto Areas Presentation to Regulatory Affairs Standing Committee May 14, 2003.
1 Sunrise Powerlink Project Update Orange County Business Council March 10, 2009.
1 Is there LNG in California’s Future? “LNG: When East Meets West” Zeus Development Conference Long Beach, CA by David Maul Manager, Natural Gas Office.
Yellowhead Area Transmission System Development
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Outage Planning Subcommittee Mark Wilson. Outage Planning Subcommittee Created to address Market Participant concerns with existing rules and procedures.
Utility Procurement: What’s Next? IEP 2015 Annual Conference
California Energy Commission Retail Electric Rate Projections: Revised Cases 2015 Integrated Energy Policy Report California Energy Commission December.
C A L I F O R N I A E N E R G Y C O M M I S S I O N Integrated Energy Policy Report Workshop Landscape-Scale Environmental Evaluations for Energy Infrastructure.
Update on the North Carolina Transmission Planning Collaborative January 30, 2007 For the North Carolina Utilities Commission and the North Carolina Public.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
PacifiCorp and CAISO Expanding Regional Energy Partnerships
California Energy Commission The Loading Order – How Are We Doing? Jackalyne Pfannenstiel Chairman California Energy Commission Independent Energy Producers.
SERC Reliability Corporation 1 SERC RELIABILITY CORPORATION MID-AMERICA RELIABILITY CONFERENCE June 21, 2006 COLUMBUS, OHIO.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Scottish Government Support for Community Energy Chris Morris Local Energy Scotland.
Dr. Nyamajeje C. Weggoro Director, Productive and Social Sectors EAC Secretariat THE DAR ES SALAAM-TANGA- MOMBASA NATURAL GAS PIPELINE AND EAST AFRICAN.
2006 Preliminary Reliability Study Results Bryan Guy September 7, 2006.
Kansas City Power & Light and KCP&L Greater Missouri Operations – Suggestions for Chapter 22 Revisions Missouri Public Service Commission Meeting Aug 31,
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
Los Angeles County Community Choice Aggregation Regional CCA Task Force Meeting October 28, 2015.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Understanding the Integrated Resource Plan (IRP 2010 Rev 2)
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Subteam 1a Competitive Solicitations Framework Working Group Meeting
The Transition to a High DER Future
Integrated Resource Planning and Load Flexibility Analysis
Windsor-Essex Electrical Service Needs and Solutions
Integrated Distribution Planning Process
Byron Woertz, Manager—System Adequacy Planning
Byron Woertz, Manager—System Adequacy Planning
California Transportation Electrification Activities
Presentation transcript:

June 2008 Windsor-Essex Electrical Service Needs and Solutions

2 Windsor-Essex Area MALDEN

3 Windsor-Essex Area Needs in Windsor-Essex Inadequate transformer and line capacity to supply growing load in East Essex Reliability of supply to the entire Windsor-Essex area is below standard for a load of its size Inadequate transmission capacity for delivering generation from the west part of Windsor to the transmission grid (i.e. congestion)

4 Windsor-Essex Area Proposed Solution Integrated solution consisting of: Targeted conservation –for reducing the demand in the area Factoring in local generation if and when it occurs resulting from the various OPA resource procurement programs Transmission reinforcements –Two options being considered

5 Windsor-Essex Area Implementation Transmission & Distribution GenerationConservation by Hydro One Programs and Procurements by OPA Programs & procurements by OPA, supported by LDCs and others

6 Windsor-Essex Area Conservation Solution in East Essex Load net of Conservation East Essex Load Target of 15 MW of conservation by 2010 –“calculated” based upon provincial target –also have a target for West Essex *Note: 27 MW of load was transferred to the new Belle River Station in 2006 *

7 Windsor-Essex Area Local Generation Opportunities There are or will be a number of provincial-wide procurement initiatives for system resources that could be of interest to this area: –Renewable Energy Supply (RES) –Renewable Energy Standard Offer Program (RESOP) –Clean Energy Standard Offer Program (CESOP) –Combined Heat & Power (CHP) OPA will incorporate the outcome of these procurements as we move forward with the plan However, the OPA does not expect that generation developments in the area will be sufficient to address the needs identified –Will need to upgrade and reinforce the transmission system to meet all the area needs

8 Windsor-Essex Area Transmission & Distribution Alternative #1 Cost: ~$120 Million

9 Windsor-Essex Area Transmission & Distribution Alternative #2 Cost: ~$100 -$115 Million

10 Windsor-Essex Area Alternative Comparison The OPA applies six planning criteria when comparing the two alternatives for reinforcing Windsor-Essex: –Reliability (both meet criteria) –Feasibility (both are feasible) –Flexibility (similar) –Cost (Alt #2 is $9M to $20M lower in cost) –Societal acceptance (Alt #2 preferred based on feedback from public consultation) –Environmental assessment (similar based on Hydro One’s initial assessment) Based on the above criteria, the preferred alternative is Alternative #2

11 Windsor-Essex Area Project Status The Integrated Power System Plan (IPSP), submitted to the OEB in August 2007, indicated Alternative #1 was the preferred solution because: –preliminary estimates indicated it would cost $17 M less than Alt #2 –it requires less land, which should result in less disruption to communities However, because discussions with stakeholders, officials and affected communities had not taken place and final design and cost estimates were not yet available, approval of this project is proceeding separately from the IPSP The preferred transmission option for the integrated plan is based on the latest information and results of the stakeholder consultation that was recently carried out

12 Windsor-Essex Area Post IPSP Information Updates Since the IPSP filing in August 2007: –Community consultation has been initiated –Costs and facility requirements have been updated –Demand forecasts have been updated –Distribution requirements have been assessed in more detail and incorporated –Load restoration requirements and transfer capabilities of the existing system and alternatives have been updated based on recent information –Environmental Assessment process is underway –Implementation of Conservation and DG continue to be monitored and updated