Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

PIP and the Booster Notch Bob Zwaska October 12, 2011 PIP Meeting.
Proton Plan PMG 7/26/07 E Prebys 1 Proton Plan Status June Eric Prebys.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
All Experimenters’ Meeting January 09, Accelerator Operation Summary Calendar Week # 51 NuMI Weekly Integrated Intensity 8.81E18 protons BNB Weekly.
Near Term* Plans for the Fermilab Proton Source Eric Prebys FNAL Accelerator Division *Near term = “prior to proton driver”
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
PIP Update June 25 th Agenda Summary Update – Current Activities/Updates – Ryan Crawford: Anode Supply Update – Peter Prieto: BPM Update – CY Tan:
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Getting Beam to NuMI (It’s a worry!) Peter Kasper.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
August 05, Startup 2013 Machine Status:  Proton Source Commissioning and Studies RFQ Injector Line (RIL) Linac Booster  Main Injector Startup.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Proton Improvement Plan William Pellico FRA Visiting Committee Meeting March 14-15, 2011.
Ff NO A Accelerator Upgrades: Status Phil Adamson Fermilab
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Proton Improvement Plan Bob Zwaska January 7, 2013 All-Experimenters Meeting.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Mu2e WGM 11/16/2011 R. Ray Mu2e Project manager. Review of the past few months In September it became apparent that the cost of Mu2e was well in excess.
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
MiniBooNE Meeting 4/22/05 Eric Prebys 1 Status of the Proton Source Haud ignota loquor* Eric Prebys *I say things that are known.
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Improvement Plan Bill Pellico April 19, 2013 NOvA collaboration Meeting Bill Pellico NOvA.
Accelerator Status and Plans
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Booster Shutdown Work - Week 4 Dump and Shielding installation completed Q805/Q806 re-installed, Septum in place Need to align quads and septum before.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
PAC Meeting, December 12, Prebys 1 The Problem.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Plan 1/10/07 E Prebys 1 Proton Plan Meeting Agenda:  Project/campaign reorganization: Prebys  Status updates: all  Booster Water Proposal: Cooper.
Booster Status, September 4, 2003 – E. Prebys 1 Frantic Shutdown Preparations Continue…
Proton Plan PMG 7/27/06 J. Sims 1 Proton Plan Cost and Schedule Report Jeff Sims.
Proton Economics Eric Prebys FNAL Accelerator Division.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys

Proton Plan PMG 7/7/05 E Prebys 2 Agenda Operations Report – E. Prebys Technical Progress – E. Prebys Booster Corrector AIP Status – C. Drennan Project Status and Cost Report – J. Sims Plan for Baselining – B. Baller

Proton Plan PMG 7/7/05 E Prebys 3 Operations Report

Proton Plan PMG 7/7/05 E Prebys 4 Total Hourly Proton Rate Emphasis on slip stacking problems

Proton Plan PMG 7/7/05 E Prebys 5 NuMI Proton Delivery

Proton Plan PMG 7/7/05 E Prebys 6 NuMI Integrated (almost caught up)

Proton Plan PMG 7/7/05 E Prebys 7 MiniBooNE (BNB) Delivery

Proton Plan PMG 7/7/05 E Prebys 8 Technical Progress

Proton Plan PMG 7/7/05 E Prebys 9 Scope Changes Since Last PMG Modified:  (Quad power supplies) Significantly reduced in scope Keep original supplies and upgrade controls electronics $1M+ -> ~$200K  (Determine rep rate limits) Modified to include RF reliability concerns  (MI RF Upgrade) Significantly reduced in scope (more in a bit) Added:  (Booster RF Improvements) Systematic plan (based on 1.2.1) to refurbish Booster RF modulators Descoped:  (Booster alignment) Decided to treat as part of normal operations  (Cavity 20) Manpower limitations. Limited success of cavity 19

Proton Plan PMG 7/7/05 E Prebys 10 Progress Baseline plan  Aim for a director’s baseline review 7/21  B. Baller will give more details Technical Progress Linac  PA Vulnerability – Committee report complete Booster  Determine rep. rate limit Good understanding of what limits repetition rate and reliability Generating report Suggesting a plan of action ( )  Orbump (+ 400 MeV line) – New injection scheme passed review! Three magnets built Beamline and girder design more or less complete Power supply passed review Will be ready for shutdown

Proton Plan PMG 7/7/05 E Prebys 11 Progress Booster  Correctors – Design nearly complete See C. Drennan’s talk  Gamma-t system Ongoing studies look encouraging Made decision to scrap existing magnets when we install the new correctors If system is useful, will build (12) new magnets between now and then)  Booster Dump Relocation Review going on in WH12NW as we speak, HOWEVER Considering rather significant change to kicker location Will be ready for shutdown  Booster RF Improvements NEW SCOPE Significant refurbishment plan for Booster modulators Waiting for recommendations of

Proton Plan PMG 7/7/05 E Prebys 12 Progress Main Injector  Large Aperture Quads – On track for shutdown  Collimation – MI-8 Collimator design complete and reviewed Will go in in shutdown Working on conceptual MI ring collimation  NuMI MultiBatch Operations – Regularly deliver 5 batches at (Total 2.1E13 protons) to NuMI target Aim to start slipstacking earlier than anticipated  RF Upgrade – Discussed shortly Studies  1.05 Proton Study Group– Preliminary report delivered to PAC on recycler retasking Overall report delayed by some more grandiose proposals than we anticipated. Hope to have a final report by 8/1

Proton Plan PMG 7/7/05 E Prebys 13 Main Injector RF ( ) Great progress has been made in understanding the limitations of the existing feed forward system.  Calculations  Beam studies News is good  The preliminary result is that the capacity of the RF system is >5.5E13 protons with no significant RF upgrade Working on specifications for going to 6E13 in the most conservative scenario (i.e. upgrade some fraction of cavities to 2 PA’s) This will free up a significant amount of money for other activities (e.g. Booster RF modulator refurbishment) Prototype tests proceed, but have been delayed due to badly overcommitted RF group

Proton Plan PMG 7/7/05 E Prebys 14 Near Term Priorities Prepare for shutdown!!!  400 MeV Line+ORBUMP  Booster dump relocation  MI large aperture quads Prepare for baseline review  Working on Design Handbook  Settling on scope of baseline (B. Baller’s talk)